Risk Assessment &

Response
Risk Risk Level Response

Shipping delay or error Predict and list out necessary parts for
causing delay in prototype High prototyping in advance, use a reliable
construction and deadline shipping service

Design errors resulting in Prototype often to test and refine designs


High
ineffective cooling of milk without losing time

Creating a system unable to Compute and recompute energy


be charged with a renewable Medium calculations each stage of electric circuit
energy source testing

Safety hazards related to Test with water rather than milk to avoid
Low
obtaining and handling milk bacteria contamination

Maintain safety-distance line and verbal


Electrical hazard due to
High communication when testing in non-
battery
populated space

High

Medium

Low

Risk
Shipping Delay Design Error Energy Source Bacterial Hazard Electrical Hazard