Title Instrument Air Compressor charging
1. OBJECTIVE
To standardize the procedure for Instrument Air Compressor
failure in 1x76MW CDQ Power plant.
1.1 FUNCTION/PURPOSE
2. SCOPE
3. RESPONSIBILITY
Shift in charge
Desk engineer
Field engineer
4. PROCEDURE
TECHNICAL DATA
Installed : 2 Nos.
Power : 30 kW;
ANNEXURE 1
5. SAFETY MEASURES
5.1 Permit To Work system: Applicable
5.2 Confined Space Working system: Applicable
5.3 Lock Out & Tag Out (LOTO): Applicable
5.4 No maintenance or civil work is allowed without valid permit
6. REFERENCE DOCUMENTS