Project name: - ABC Project

Name of the taker off: - MNM.Afrath


Size
Item Discription Type Nr of Element PCC (Blinding)
L W
A Footing F1 6.00 1.20 1.20
F2 3.00 1.10 1.10
Size
Excavation Qty
C (Blinding) RCC (Footing)
H L W H Exc.Hight Volume m3
0.05 1.10 1.10 0.30 1.50 12.96
0.05 1.00 1.00 0.30 1.50 5.45

18.41
Blinding Footing Qty FW to Bituminus
Back filling Qty m3
Qty m3 m3 footing m2 Paint m2

0.43 2.18 7.92 23.82


0.18 0.90 3.60 10.23

13.98 0.61 3.08 11.52 34.05


Size
Item Discription Type Nr of Element RCC (Column)
L W
Substructure
A Column C1 6.00 0.30 0.25
C2 3.00 0.25 0.25
Size FW to
Column Qty Bituminus
CC (Column) Column
m3 Paint m2
H m2

1.15 0.52 7.59 7.59


1.15 0.22 3.45 3.45

0.73 11.04 11.04


Size
Item Discription Type Grid RCC (GB)
L W
Substructure
A GB GB2 1/A-B 5.75 0.20
GB2 1/B-C 5.75 0.20
GB2 2/A-B 5.75 0.20
GB2 2/B-C 5.75 0.20
GB2 3/A-B 5.75 0.20
GB2 3/B-C 5.75 0.20
GB1 A/1-2 3.73 0.20
GB1 A/2-3 3.73 0.20
GB1 B/1-2 3.73 0.20
GB1 B/2-3 3.73 0.20
GB1 C/1-2 3.73 0.20
GB1 C/2-3 3.73 0.20
Size
FW to GB Bituminus
RCC (GB) GB Qty m3
m2 Paint m2
H

0.40 0.46 4.60 4.60


0.40 0.46 4.60 4.60
0.40 0.46 4.60 4.60
0.40 0.46 4.60 4.60
0.40 0.46 4.60 4.60
0.40 0.46 4.60 4.60
0.50 0.37 3.73 3.73
0.50 0.37 3.73 3.73
0.50 0.37 3.73 3.73
0.50 0.37 3.73 3.73
0.50 0.37 3.73 3.73
0.50 0.37 3.73 3.73
Size
Item Discription Type Grid RCC (FF Beam)
L W
Superstructure
FF Level
A Beam B1 1/A-B 5.75 0.30
B1 1/B-C 5.75 0.30
B1 2/A-B 5.75 0.30
B1 2/B-C 5.75 0.30
B1 3/A-B 5.75 0.30
B1 3/B-C 5.75 0.30
B2 A/1-2 3.73 0.30
B2 A/2-3 3.73 0.30
B2 B/1-2 3.73 0.30
B/2-3 3.73 0.30
Size
FF Beam Qty FW to FF
CC (FF Beam) Slab thick
m3 Beam m2
H

0.60 0.15 0.78 6.90


0.60 0.15 0.78 6.90
0.60 0.15 0.78 6.90
0.60 0.15 0.78 6.90
0.60 0.15 0.78 6.90
0.60 0.15 0.78 6.90
0.40 0.15 0.28 2.98
0.40 0.15 0.28 2.98
0.40 0.15 0.28 2.98
0.40 0.15 0.28 2.98
S.N Description Location Pereimeter Area
No of D/W

A Finishes F/F Bed room 1 14.91 13.11 D2


DW4
B Dining area 28.03 36.08 D1
DW5
OPENING
C PANTRY 16.41 12.82 W2
D2
OPENING
Common bath
D
room 8.5 4.33 D3
Deduction

Ddt for
No of D/w D/W size Ddt for plaster/paint
skiting

1 0.9 2.1 0.9 1.89


1 2.45 2.4 2.45 5.88
1 0.9 2.4 0.9 2.16
1 3.95 2.4 3.95 9.48
1 0.91 2.65 0.91 2.4115
2 0.9 2.1 - 3.78
1 0.9 2.1 0.9 1.89
1 0.91 2.65 0.91 2.4115

0.75 2.1 0.75 7.75


Net Quantity

Floor tiles area Length of skirting Ceiling area Wall height Wall plaster

13.11 11.56 13.11 2.88 35.17

36.08 22.27 36.08 2.88 66.67

12.82 14.6 12.82 2.88 39.1793

4.33 3.58 4.33 2.88 16.73


Wall painting Wall tiles

35.17 -

66.67

39.1793 -

16.73