You are on page 1of 14

Project management c.

Risk analysis
1. The purpose of ________ is to communicate d. None of the above
a visually oriented “lllllll” view of the projects 8. Risk identification can be done using a
status. ______ session.
a. Project status a. Risk Brainstorming
b. Overview of project status b. Risk management
c. Concerns c. Both a & b
d. Product status d. None of the above
2. __________ is the data when the investment 9. SCM stands for
seems to generate a positive return. a. Supply chain management
a. Break even point b. Supply chain monitoring
b. Return on investment c. Supply chain maintenance
c. Post review d. None of the above
d. All of the above 10. _______ shows the hierarchic structure of
3. ___________ is the maintaining & reporting the process documentation.
of program accomplishment, particularly a. Work package
progress towards pre established goals. b. Function tree
a. Break ever point c. Processes
b. Return on investment d. Sub-process
c. Performance measurement 11. _______ describes a process based on the
d. None of the above chronological as well as the logical
4. __________ involves identifying potential interdependencies.
problems (risks), analyzing those risks, planning a. Process documentation
to manage them, & receiving them. b. Process chain
a. Break even point c. Process interface
b. Risk management d. Cluster
c. Risk analysis 12. _______ is an object that represents a work
d. Risk planning package a process or sub process.
5. The different steps of risk management are a. Process chain
i. Risk identification b. Function
ii. Risk analysis c. Edge
iii. Risk management d. Event
iv. Risk review 13. ________ is an information object that cons
v. Risk assessment lines different entity types and describes which
a. I, ii, iii, iv information is needed for a successful
b. ii, iii, iv, v fulfillment of the function or which information
c. i, iii, iv, v is created by fulfilling the function.
d. i, iii, v a. Process interface
6. _________ is the value of the work b. Document
completed. c. Cluster
a. Capital value d. Event
b. Earned value 1. ______ and _______ mandates ensure that
c. Corporate value technology initiatives are implements at
d. None of the above acceptable costs within reasonable & expected
7. Risk identification can be done using a time frames.
________ session. a. Rules and regulations
a. Risk assessment b. Legislative and regulatory
b. Risk identification
c. Government and regulatory c. Critical decisions
d. Rules and legislation d. None of the above
2. Two methods of review briefings are 9. ________ is the calculated benefits that are
a. First time and second time organization is projected to receive in return for
b. First time and standard tine investing money (resources) in a project.
c. First time and ongoing a. Return on investment
d. None of the above b. Total cost
3. ______ review is initial briefing that occurs c. Critical cost
where a project is first added to the review d. All of the above
portfolio. 10. ________ status section focuses on the
a. First time technical approach, e.g. system architecture,
b. Standard time project methodology and processors, product
c. Ongoing quality and risks & issues.
d. All of the above a. Performance measures
4. _______ in an organization is responsible to b. Product status
conduct projects sensor management reviews. c. Both a & b
a. Chief information officer d. None of the above
b. Project manager 11. ________ is the ongoing monitoring &
c. Process manager reporting of program accomplishment,
d. None of the above particularly progress towards pre-established
5. The full form of CSIA is _______. goals.
a. Cost system information analysis a. Product status
b. Cost system information assessment b. Project status
c. Corporate system information architecture c. Performance measurement
d. None of the above d. Performance appraisals
6. _______ category sets the stage for the 12. Basic categories of performance
remainder of the information provided during measurements include
the review. i. Measure of efforts
a. Prior review ii. Measures of accomplishments
b. Status review iii. Measures that elate efforts to
c. General overview accomplishments
d. All of the above iv. Measures of product status
7. _______ Focuses on the management a. I, ii, iii, iv
approach e.g. schedule, cost, decision points, b. I, ii, iii
POI funding status used for the project. c. ii, iii, iv
a. Product status d. I, iii, v
b. Project status 13. ________ measures report what was
c. General overview provided and achieved with the resources used.
d. None of the above a. Accomplishment measure
8. ________ are defined program and project b. Performance measure
management for acquisition of capital assets, as c. Product status
formal determinations or decisions at specific d. None of the above
points in a project stage that allow the project 14. _______ measure the quantity of services
to proceed to the next stage and commit provided.
resources. a. Outcome
a. Project decisions b. Output
b. Process decisions c. Both a & b
d. None of the above
15. ________ measures the results of providing a. ARROW project
outputs. b. FEDORA project
a. Outcomes c. Both a & b
b. Output d. None of the above
c. Issues & risks 7. SRO/SRW interface was released as
d. None of the above ___________.
1. ________ navigation is the navigation on a. Open source software
different levels. b. Picture Australia
a. Vertical navigation c. Fedora TM and VITAL
b. Model navigation d. ARROW project
c. Horizontal navigation 8. During ________ phase in PM life cycle the
d. None of the above project manager’s ability to lead & manager is
2. The task of the __________ is to create required.
HTML- pages of the models which can be a. Inspection, testing & delivery phase
released in the internet / intranet and displayed b. Analysis & evaluation phase
via the internet explorer. c. Post competition Analysis phase
a. ARIS web publisher d. None of the above
b. Web designer 9. ________ process is used to monitor &
c. ARIS web designer measure progress & take remedial action.
d. None of the above a. Planning process
3. In the function Tree, _________ shows the b. Executing process
work packages, which represents the different c. Controlling process
part projects. d. Closing process
a. Level 1 10. _________ process is used to coordinate the
b. Level 2 people to carry out the plan.
c. Level 0 a. Design phase
d. Level 5 b. Executing phase
4. ________ is designed for people who manage c. Closing phase
projects independently and don’t require the d. None of the above
capability to manage resources from a central 1. _________ is a process by which employees
responsibility. are encouraged to true decisions pertaining to
a. Microsoft project standard 2002 their area of work.
b. Microsoft project server CAL a. Performance
c. Microsoft project standard 2009 b. Empowerment
d. All of the above c. Innovation
5. The ________ project will identify and test d. Creativity
software or solutions to support best practice 2. ________ is a first guide that develops an
institutional digital repositories comprising e- approach and program management that starts
prints, digital thesis & electronic publishing. afresh from the view point of the enterprise
a. ARROW rather then drawing on project paradigms
b. ARIS developed in the context of large, single, and
c. FEDORA physical project to the day to day business of
d. VITAL project base organizations.
6. ________ identifies and test software or a. PMR
solutions to support best practice institutional b. PZM
digital repositories comprising e-prints, digital c. P3M
thesis and electronic. d. P4M
3. _________ is based on the part that several a. Laggard
alternate technological routes are existing to b. Leader
create a particular vice. c Manager
a. Management substitution d. None of the above
b. Technology substitution 9. The new horizon of project management
c. Both A & B there are ______ steps.
d. None of the above a. 7
4. The three conflict resolution strategies b. 8
include c. 9
i. conflict presentation d. 10
ii. Early detection 42. Different stages are a project management
iii. Immediate resolution cycle is as follows
iv. Concurrency resolution i. Define
a. I, ii, iii, iv ii. Measure
b. ii, iii, iv iii. Analyze
c. I, ii, iii iv. Improve
d. iii, iv v. Standardize
5. The three parallel streams of project a. I, ii, iv
management are _________, ________ and b. ii, iii, iv, v
________. c. iii. Iv, v
i. Process development d. I, ii, iii, iv v
ii. Project manager training 10. S stands for _______ in a project
iii. Qualification & Incentive program management cycle.
iv. High technology a. Style
a. I, ii, iii, iv b. Success
b. ii, iii, iv c. Super
c. I, ii, iii d. Standardize
d. ii, iii 11. Arrange the following stages of project
6. Every professional manager has two sets of management cycle in a proper sequence.
customers. i. Analyze
i. Internal customers ii. Standardize
ii. Internal customers iii. Define
iii. Standard customers iv. Improve
iv. Process customers v. Measure
a. I, ii a. I, ii, iii, iv, v
b. ii, iv b. ii. I. iii. Iv. V
c. iii, iv c. iii, v, I, iv, ii
d. I, iv d. v, iv, iii, ii, I
7. _________ not only ensures that his 12. ________ is important while predicting &
performance is at peak but motivates his entire controlling the outcome is important.
team to do so. a. Performance
a. Project leader b. Standardization
b. Top management c. Metrics
c. Middle manager d, None of the above
d. Professional manager 13. ________ metrics help focus on the fast that
8. Any _________ without followers is not a in order for IT project to be considered
successful leader. successful, IT must not only deliver a quality
product, it must deliver a quality product that is c. I, ii, iii, iv, v, vi
accepted by its intended audience. d. ii, iii, iv, vi
a. Software metrics 20. The project senior management receives is
b. Business metrics scheduled every __________ months in
c. Both a & b conjunction with fiscal year.
d. None of the above a. 2 Years
14. ________ means meeting the clients needs, b. 3 Years
expectations & defined scope. c. 4 Years
a. Customer orientation d. None of the above
b. Customer evaluation 1. ___________ is any activity starting with a
c. Customer satisfaction description of a mission and ending with the
d. None of the above competition of a deliverable or product.
15. ________ metrics are part of an interactive a. Project Management
process, based on lessons learned. b. Project
a. Business metrics c. Process Management
b. Project metrics d. None of the above
c. Planning metrics 2. _________ is the technique or practice of
d. All of the above controlling the use of resources such as cost,
16. ________ is essential management tools. time, manpower etc.
a. Processors a. Management
b. Metrics b. Project
c. Both a & b c. Process Management
d. None of the above d. All of the above
17. __________ was instituted to provide a 3. The practice of controlling the cost time,
vehicle for reviewing all corporate & major manpower, hardware & software resources
information systems. involved in the development activities.
a. Product management review process for a. Project
corporate & major information system. b. Project Management
b. Project management review process for c. Material Management
corporate & major information system. d. Process Management
c. Both a & b 4. The responsibilities of a project Manager are
d. None of the above i. Budgeting & cost control
18. CPIC stands for ii. Scheduling tasks
a. Capital planning & information control iii. Allocating resources
b. Capital planning & investment control iv. Tracking resources
c. Cost planning & information control v. Answering technical quality
d. Capital planning infrastructure control vi. Integration process
19. The project management review process vii. Evaluation
includes the following steps. a. i, ii, iii, iv, v
i. Identification b. i. ii, iii, iv, v, vi, vii
ii. Development c. ii, iii, iv, v, v
iii. Compilation d. v, vi, vii
iv. Collection 5. What are the different phrase of project
v. Participation Management life cycle.
vi. Termination i. Analysis & evaluation phase
a. I, ii, iii, iv ii. Marketing phase
b. I, ii, iii, iv, v iii. Design phase
iv. Inspection, testing & Delivery phase
v. Post, competition analysis phase 11. _________ processes is a series of actions to
a. i, ii, iii, iv achieve a result.
b. i, ii, iii, iv, v a. Project processor
c. ii, iii, iv, v b. Planning process
d. None of the above c. Product oriented process
6. The task of Analysis & evaluation phase is d. Customization
a. Requirement Analysis 12. Process Group include
b. Trade off analysis a. Initiating process
c. Estimation b. Planning process
d. All of the above c. Executing process
7. The purpose of _________ phase is to d. Controlling process
produce a project proposal. e. Closing process
a. Initiation phase f. Design process
b. Marketing phase g. Marketing process
c. Design phase 1. a, b, c, d, e, f, g
d. Inspection phase 2. a, b, c, d, e
8. The inputs received by design phase are 3. b, c, d, e, f
i. Preliminary project evaluation 4. c, d, e, f, g
ii. Project proposal 13. True or False
iii. Customer interviews i. Project fails because project objective not in
iv. Trade off analysis the line with business objective.
v. Estimation ii. Project fails because lack of complete support
a. i, ii, iii, iv from clients.
b. i, ii, iii, iv, v a. a. true, b false
c. ii, iii, iv, v, vi b. a. true, b true
d. iii, iv, v c. a false, b false
9. Arrange the following phases of project d. a false, b true
management life cycle in a proper sequence. 14. ________ is a none continue work bringing
a. Inspection, testing & Delivery about a beneficial change.
b. Design phase a. Project Management
c. Analysis & evaluation phase b. Project
d. Post competition analysis c. Process Management
e. Marketing phase d. All of the above
a. a, b, c, d, e 15. Five dimensions that must be managed on
b. c, e, b, a, d project are
c. a, b, e, c, d i. Features
d. b, a, e, c, d ii. Quality
10. Different project management process is iii. Cost
i. Process Groups iv. Schedule
ii. Project processor v. staff
iii. Process Interactive a. I, ii, iii, iv
iv. Customization b. ii, iii, iv, v
v. Requirement process c. I, ii, iii, iv, v
a. i, ii, iii, iv, v d. iii, iv, v
b. ii, iii, iv, v 16. A graphical way to depict me points of
c. i, ii, iii, iv projects management principles is by the use of
d. ii, iii, iv, i ________.
A. civet diagram a) Project cost
B. kiviat diagram b) Process
C. maxi can diagram c) Resource
D. None of the above d) Project Scope
17. __________ is a limiting factor beyond the 3
project terms control. That which formalizes acceptance and brings
a. A driver project to an orderly end is a
b. A constraint a) control process
c. Degree of freedom b) planning process
d. None of the above c) executing process
18. ______ is those persons that are actively d) closing process
invited in the project & whose interests may be 4
affected by the outcome of the project. During the course of executing the project, it is
a. Individuals seen that the ______ requirement increases
b. Organizations from start to an intermediate stage of the
c. Players project.
d. None of the above a) equipment
19. Project lifecycles involves following stages. b) resource
i. Preparation stage c) design
ii. Start up stage d) manpower
iii. Feasibility or research stage 5
iv. Implementation stage The _____ the project can be estimated based
v. Close down stage upon the normal distribution curve.
vi. Sloping stage a) manpower requirement of
a. I, ii, iii, iv, v b) funds requirement of
b. ii, iii, iv c) probability of completion of
c. ii, iii, iv, v d) design requirement of
d. I, ii, iii 6
20. ________ is a technique to analyze the The project during the course of its progress
content of work & cost by ——– it down into may be subjected to _____ because of some
component parts. external factors.
a. Task duration a) changes
b. Work breakdown structure b) errors
c. Work processes c) pressure
d. None of the above d) threats
7
Project Management Model Question Paper Responsiveness refers to ___ of response of an
Section A - 1 Mark individual.
1 a) effect
Various parameters that affect the project in its b) reduction
planning and formulation refers to c) quickness
a) Project cost d) increase
b) Process 8
c) Resource ___ is the master key of today’s business.
d) Project Scope a) project
2 b) risk
That which is responsible for changing the input c) time
and giving a desired output is a d) information
9 15
Project mindset lays emphasis on flexible ___. POR helps in ___________ of resources.
a) people a) allocation
b) timings b) minimization
c) resources c) maximization
d) processes d) optimization
10 16
The communication requirement and It is entrusted to a smaller team within a team
capabilities in which managers may lack for initiating, implementing, analyzing and
enthusiasm for change and fail to collaborate or distributing the process.
practice teamwork with their peers refers to a) CNC
___. b) ISO
a) communication frequency c) SEI-CMM
b) response profiles d) CBPI
c) behavior pattern 17
d) barriers to communication The project manager should take the assistance
11 of a__________ and run checks as frequently as
Allow information, questions, comments and possible.
opinions to travel through the organization is an a) system administrator
essential characteristic of a typical _____ b) coordinator
network. c) CEO
a) communication d) Project Team
b) neural 18
c) information It is concerned with integration.
d) organization a) PCMM
12 b) CMMI
Overcoming barriers to communication c) PMI
associated with differing perceptions of the d) ISO
recipients in different divisions location or parts 19
of a unit, is an essential characteristics of a Performance closer or beyond expectation is
typical _____ network. the degree of _________.
a) neural a) assurance
b) communication b) error
c) information c) precision
d) organization d) quality
13 20
PR stands for _____________ . ________helps in resetting the goals when they
a) Project Review cannot be achieved for various reasons –
b) Performance Review shortage of resources, time etc.
c) Planning Review a) Plan
d) Procurement Review b) Guidelines
14 c) Review
_____________ of the organization should be d) Analysis
the navigator for the project. 21
a) Manager _________ is the process by which employees
b) CEO are encouraged to take decisions pertaining to
c) Strategy their area of work.
d) Policy a) Automation
b) Empowerment 28
c) Authorization ___ provides a life-cycle review process from
d) Delegation system inception to retirement, and a
22 correlation process between the CPIC processes
A system of internal _______ gets initiated and Enterprise Architecture processes i.e.,
almost automatically resulting in highly efficient Departmental Information Architecture, as well
organization as a whole. as other significant Departmental programs and
a) Auditing projects.
b) Verification a) project management information system
c) Validation b) project management control system
d) Benchmarking c) project management enterprise system
23 d) project management review process
One of the rules which would help organization 29
to be strong in R&D is to ensure _____________ ______performs day to day project
for critical systems and technologies. management, develop project deliverables,
a) Completeness prepare project management review and senior
b) Satisfaction management review presentations, present
c) Redundancy project status, manage resolution of project
d) Perfection issues.
24 a) CFO
One of the rules which would help organization b) CIO
to be strong in R&D is to build __________ into c) Project managers
every activity. d) Program managers
a) Concurrency 30
b) Modules ______review and comment on project
c) Redundancy deliverables and work products, schedule and
d) Functions support the review meetings, provide support
25 to systems owners and project managers,
Change is achieved by making advise the CIO and associate CIO’s
_________changes. a) CMIP program staff
a) Small b) Systems owners
b) Big c) CMIP coordinator
c) Incremental d) Program managers
d) Detrimental 31
26 Risk management is ______ for projects, and
The principle of continuous improvement is can help reduce your costs and efforts when
seen in _____. trouble strikes.
a) PM a) helpful
b) PMIS b) essential
c) ERP c) insurance
d) TQM d) beneficial
27 32
_________ Money has to be kept to the Projects smaller than 12 people - months take
minimum for achieving total economy. about _____ minutes.
a) Public a) 30-50 min
b) Overall b) 40- 60 min
c) Inventory costs c) 50-70 min
d) Investment d) 60-80min
33 c) interface
In ________ a study is done to analyze the d) intelligence
changes in the variable values because of a 40
change in one or more of the decision criteria. The Television Media Control System is required
a) product analysis by a Media Solutions Company in Germany who
b) item analysis is an Intermediary between a Television
c) trend analysis Content Development Studio Company and a
d) sensitivity analysis ____ Company.
34 a) Pharmaceutical products
One of the supply chain management group b) Automobile accessories
taking care of documentation systems Is ____ . c) TV Broadcasting
a) Odette d) Channer management
b) Darwin Section B - 2 Marks
c) Microsoft 1
d) Pilin During this phase document the lessons from
35 the project.
The three levels of SMCo documentation are a) Post completion analysis phase
Work package, ____ and sub process. b) Inspecting, testing and delivery phase
a) formats c) Marketing phase
b) procedures d) Analysis phase
c) process 2
d) tables During inspecting, _____ and _____ phase the
36 project team performs quality control work.
The level -0 of the SCMo documentation a) Marketing and testing
contains _______ . b) Testing and delivery
a) sub process c) Execution and selling
b) work package d) Analysis and delivery
c) process 3
d) measurement Any project is undertaken to deliver either
37 _____ or _____.
The ______ navigation is the navigation on a) Item , product
different levels. b) Service , product
a) Horizontal c) Item , service
b) Vertical d) Report, service
c) Hierarchical 4
d) Sequential Developing a risk management plan, focusing
38 on the highest prioritized risks requires a ___ of
__________ is a quick project status reporting the risk probability and the risk consequences.
tool. a) Qualitative assessment
a) Dashboard b) Quantitative assessment
b) Pie Chart c) Minimal assessment
c) Bar Chart d) Maximum assessment
d) Trend 5
39 A weekly status report includes the following :
One of the features of project scoping is to a) Accomplishments during the period, items
increase the ____ of the update process. not completed, proposed activities, predicted
a) linkage slippage, predicted cost.
b) facility
b) Problems faced, items not completed, a) managerial , executive productivity
proposed activities, predicted slippage, b) Team building , performance appraisal
predicted cost. c) Utility , performance
c) Accomplishments during the period, d) Creativity , Innovation
problems and risks, proposed activities, 11
predicted slippage, predicted cost. What can be found out by assigning a suitable
d) Accomplishments during the period, items weight age to the most likely time estimate in
not completed, risks, predicted cost. PERT analysis?
6 a) average
The ____ and _____ of an individual or an b) standard deviation
organization are proportional to its capability of c) skewness
evolving processes and structure for superior d) variance
responsiveness time constant. 12
a) performance and utility Data have repositories which are accessible,
b) strength and behavior __________ and _________ instantly and used
c) vibrancy and liveliness by all concerned.
d) strength and weakness a) transferable and updatable
7 b) secured and convertible
It is a process through which a project team c) modifiable and transferable
passes on the details of any system as d) retrievable and storable
recommendation for standardization. 13
a) force field analysis Modern organizations in all fields depend on
b) information risk management technology to improve their processes to
c) management assurance measure deliver the best _________ and _________ to
d) continuous business process improvement their customers.
8 a) product and services
It is a task performed by the project leader to b) technology and goods
balance efforts to convince management c) performance and results
against wavering with efforts to prepare team d) results and satisfaction
members to counter any unexpected storms in 14
the project. Economies are effected when the consumption
a) force field analysis of _______, ______, movement and time are
b) information risk management reduced.
c) management assurance measure a) Money, material
d) continuous business process improvement b) Power, material
9 c) About, money
Plan of Record should be prepared for the d) Labor, skills
______ and ______ used in the Projects. 15
a) Process, Tools The standard set of project management
b) Task list, check list reporting requirements fits into the following
c) Blue print, master plan categories:
d) Techniques, instruments a) general project overview, project status,
10 product status, issues & risks, project unique
__________ and ___________ are measures in information
relation to zero defects and overall Team b) project status, product status, issues & risks,
Performance, the type of activities which can be project unique information, product price
performed only by the executives and
managers.
c) general project overview, project status, a) planning process, initiating process and
product status, product price, project unique closing process
information b) controlling process, executing process,
d) general project overview, project status, planning process
product status, issues and risks, product price c) executing process, closing process, initiation
16 process
The two things to manage the risk are to take d) initiating process, planning process,
actions to _______ the likelihood of the risk executing process
occurring and take action to reduce the 2 Match the following :
_______ if the risk does occur. a) P-Z, Q-X, R-Y
a) reduce, impact b) P-X, Q-Z, R-Y
b) understand, effect c) P-Y, Q-X, R-Z
c) analyze, complications d)P-Z, Q-Y, R-X
d) study, damages 3 The key issues which are documented in a
17 project plan are :
The Process Chain describes a process based on a) project operating budget, project logic
the ________ as well as the ________. diagram, estimates , balanced cost
a) chronological, logical interdependencies b) project operating budget, project logic
b) product cycle, process cycle diagram, estimates, minimized cost
c) product characteristics, price c) project operating budget, project logic
d) supply chain, monitoring characteristics diagram, estimates, maximized cost
18 d) project operating budget, project logic
The section on operations and manufacturing diagram, estimates, updated risk log
deals with the customer focus, outsourcing 4
issues, primary metrics, quality , costs, delivery, Bottom up approach in estimation consists of
core in manufacturing, and ___________ . the following :
a) unique services a) project manager first divides the product
b) unique capabilities under development into modules, each module
c) storage further subdivided in to smaller units, defines a
d) utility standard for manufacturing and self testing
19 Key features of GDM are standardization, b) project manager reviews each module, each
modularization, ________ and ________. module further subdivided in to smaller units,
a) customization, micro structure defines a standard for manufacturing and self
b) customization, macro structure testing
c) normalization, minimization, c)project manager reviews each module, each
d) generalization, globalization module is planned, defines a standard for
20 Vendor can recommend suitable technology manufacturing and self testing
wherein the prevailing back end systems are d) project manager reviews each module, each
____ and ____. module is planned, defines a standard for
a) Turbo, DOS manufacturing and self testing
b) Borland, Windows 5 The key issues which are documented in a
c) Borland, Linux project plan are :
d) Turbo, OS2 a) project operating budget, project logic
Section C – 4 Marks diagram, estimates , balanced cost
1 b) project operating budget, project logic
In the connection between various process diagram, estimates, minimized cost
groups , loop exists between _____ c) project operating budget, project logic
diagram, estimates, maximized cost
d) project operating budget, project logic for controlling at least one function. Q) The
diagram, estimates, updated risk log PMO must create and maintain the ability of the
6 Top down approach in estimation consists of project manager to keep focused on the client’s
the following : requirements and meet them. Which of the
a) Prepare the budget, fix the productivity level following is correct
for the project, and obtain the overall effort a) Both are True
estimate from the productivity and size b) Both are False
estimates. c) P is True and Q is False
b) get the estimate of the total size of the d) P is False and Q is True
product in function points, fix the productivity 10 The four types of reviews conducted at
level for the project, obtain the overall effort different stages of the project are : _______ ,
estimate from the productivity and size _________ , ______ and _____ .
estimates. a) IR, PPR, PR, QAR
c) Prepare the budget, establishes the controls b) IR, TR, DR, QAR
for the project, obtain the overall effort c) AR, PR, SR, DR
estimate from the productivity and size d) DR, IR, PPR, QR
estimates. 11 Consider the following statement: P) In PERT,
d) Prepare the budget, establish the controls for we take into consideration the fact that the
the project, monitor the controls set and obtain times allocated for all the activities might be
the overall effort estimate from the productivity determinable. Q) Project overruns are common
and size estimates. and costly. Which of the following is correct
7 P) Build employee trust in the a) Both are True
communications process so that hones b) Both are False
feedback becomes a part of the natural way of c) P is True and Q is False
working is the only essential characteristic of a d) P is False and Q is True
communication network. Q) Quality of any 12 Match the following: p) innovation x) change
product or service is defined as its conformance in authority and task relationships of managers
to the standards or the stated requirements. q) e-engineering y) use all types of information
Which of the following is correct: systems to make functions efficient r)
a) Both are True restructuring z) successful use of skill and
b) Both are False resources Which of the following is correct?
c) P is True and Q is False a) p-x, q-y, r-z
d) P is False and Q is True b) p-y, q-x, r-z
8 Match the following: c) p-z, q-y, r-x
(p) define (x)design of experiments, modeling d) p-z, q-x, r-y
(q) improve (y) control charts, time series, 13 The following statements are guidelines to
procedural adherence, performance mgmt. help the organizations to strengthen their R & D
(r) Standardize (z) benchmark, customer area P) The traditional way of technology
requirement, process flow map, quality development is carried out with corresponding
function. link to the product development of activities. Q)
Which of the following is correct? Failures in the early stages of the projects are
a) p-x, q-y, r-z less costly and harmful than at later stages.
b) p-y, q-x, r-z Which of the following is correct?
c) p-z, q-y, r-y a) Both are True
d) p-z, q-x, r-y b) Both are False
9 Consider the following statement: P) An office c) P is True and Q is False
is a small group of people which coordinates d) P is False and Q is True
various activities responsible to an enterprise
14 The following statements are guidelines to structure of the process documentations. Which
help the organizations to strengthen their R & D of the following is correct?
area P) Value goes on getting added along the a) Both statements are True
supply chain. Q) Inventory costs money has to b) Both statements are False
be kept to the maximum for achieving total c) Statement P is True and Statement Q is False
economy. Which of the following is correct? d) Statement P Is False and Statement Q is True
a) Both are True 18
b) Both are False The main objective of SCMo are _________ .
c) P is True and Q is False a) Stock out, over supply, excess inventory,
d) P is False and Q is True excess production, decreased supply demand
15 Consider the following two statements : P) ratio.
Project Management Review Process for b) Prevention of stock out and over supply,
Corporate and Major Information Systems was early warning, elimination of bull whip effect,
instituted to review all major information optimized allocation.
systems in development, enhancement, or c) Stock deterioration, losses, increased supply
production of a product or a service. Q) These demand ration, minimized inventory.
reviews serve as a forum to raise issues and d) Over distribution, excess production,
concerns that will impact the project and maximimized inventory, minimizes wastages.
ensure that acceptable actions or corrective 19 The GDM is adopted by an Industry or
plans exist for addressing any significant Business to serve to any Customer Worldwide
positive impacts. Which of the following is with ________, _________, _________ and
correct? __________.
a) Both are true a) utility, productivity, serviceability,
b) Both are false satisfiability
c)Statement P is true and statement Q is false b) efficiently, satisfiably, reliability, conditionally
d) statement P is false and statement Q is true c) accountability, serviceablity, utility,
16 The four steps to manage risk are: ___, ____, productivity
____, and ____. d) speed, accuracy, economy, reliability
a) identification, analysis, management 20 Consider the following statements: P)
planning and review System Requirement covers a Remote Device
b) identification , assessment, review, planning Solution controlling Delivery of Media Programs
c) planning, analysis, design, structure in Real Time Mode from the Achieves of the
d) planning, analysis, structuring and reviewing Media Centre to the TV Stations based on a day
17 Consider the following statements : P)The to day program Schedule. Q) Competitors offer
intent of this document is to define the two varieties of products – one for primary
structure of the Documentation System, its Hypertension Symptoms and the other for
content, the method of content generation and advanced Symptoms, the latter priced at Five
to attain common documentation of all times the former. Which of the following is
standard processes of Odette. Q) The entry level correct?a) Both statements are True
of the process documentation structure is the b) Both statements are False
function tree that shows the hierarchic c) Statement P is True and Statement Q is False
d) Statement P is False and Statement Q is True