You are on page 1of 5

METRADO DE CERAMICOS 4TO PISO -PABELLON A

UNIVERSIDAD PRIVADA DEL NORTE

PISO CON CERAMICO 268.43

Descripcin # V. Largo ancho Total m2 m. lineal


area 1 1 5.96 1.43 8.523 14.78
area 2 1 2.095 1.8 3.771 7.79
area 3 1 1.455 0.57 0.829 4.05
area 4 1 2.37 1.138 2.697 7.016
area 5 1 0.85 0.295 0.251 2.29
area 6 1 3.103 1.4 4.344 9.01
area 7 1 1.113 1.04 1.158 4.306
area 8 1 41.207 2.655 109.405 87.72
area 9 1 4.82 0.28 1.350 10.2
area 10 1 6.78 0.28 1.898 14.12
area 11 1 6.74 0.28 1.887 14.04
area 12 1 6.745 0.28 1.889 14.05
area 13 1 6.745 0.28 1.889 14.05
area 14 1 2.655 1.17 3.106 7.65
area 15 1 7.72 2.475 19.107 20.39
area 16 1 0.2235 0.101 0.325 2.75
area 17 1 0.2235 0.101 0.325 2.75
area 18 1 0.2264 0.101 0.327 2.755
area 19 1 6.205 0.3 1.862 13.01
area 20 1 4.01 0.3 1.203 8.62
area 21 1 38.205 2.66 101.625 81.73
area 22 1 0.094 5.861 0.551 11.91
area 23 1 0.528 0.068 0.036 1.192
area 24 1 0.541 0.068 0.037 1.218
area 25 1 0.57 0.068 0.039 1.276
Total 268.43 358.67
datos de los materiales para el proyecto

ceramico geige de alto transcito de 45*45


para una caja rendimiento m presio s/ # depiezas
1 2.08 50.75 10

fragua color hueso


para una bolsa rendimiento m/kg presio s/ peso kg
1kg 3 6.5 1

pegamento blanco extra fuerte


para una bolsa rendimiento m/bolpresio peso kg
1 bolsa 5 32.9 25

calculo de la cantidad de material a utilizar

numero de cajas de cermico


area total 305.06
rendimiento 2.08
# cajas 146.67

numero de bolsas de fragua color hueso


are total 305.06
rendimiento 3
# bolsas 101.69

numero de bolsas de pegamento blanco extra fuerte


are total 305.06
rendimiento 5
# bolsas 61.01

cantidad de agua en litros


rendimiento por kg de pegamento 0.26
total 396.58
calculo del costo de materiales

materiales cantidad perdida+5%


ceramico 146.67 154.00
fragua 101.69 106.77
agua para pegamento 61.01 64.06
agua 396.58 416.41
crucetas 1 1.05

materiales cantidad unidad


ceramico 154.00 paquetes
fragua 107.00 bolsas
pegamento 62.00 bolsas
agua para pegamento 0.42 litros
crucetas 2 bolsa

COSTO DE MATERIALES
materiales parcial total s/
ceramico 57.75 8893.50
fragua 6.50 695.50
agua para pegamento 32.90 2039.80
agua 1.12 0.46
crucetas 7.4 14.8
COSTO TOTAL S/ 11644.06

costo mano de obra


s/./m2 area total total s/
18 305.06 5491.1

invercion total de obra s/.

17135.1
metrado de socalo de escalera
descripcion numeros area total
area del peldao 1 2 0.56 1.12
area del peldao 2 18 0.071 1.278
total 2.398

metrado de escalera
ecalera longitud ecalera longitud
largo 2.655 largo 2.655
ancho 0.13 ancho 0.3
contrapaso 10 paso 9
total 3.45 total 7.17

area total
305.06
m. lineal zocalo 1.17
0.86 0.15
1.43 0.067
5.96 2.475
0.665 0.705
0.64 0.21
0.57 1.44
0.317 0.21
0.8 0.21
0.295 1.35
0.295 0.21
0.72 0.21
1.965 1.02
0.63 7.77
1.99 1.084
1.04 0.31
0.283 1.91
3.047 6.035
6.91 4.8
6.77 5.08
6.77 2.66
0.72 20.05
1.17 1.03
1.602 11.346
2.15 38.332
Total 157.433 m

area total de socalo 23.61