You are on page 1of 2
eannron or201s Handing Over Certificate Reference: UFT/EMQLIS6.01/Hm/SR/MNNYAMY ContractNo. = UFT/INGSIA8/GKN-REV.03 From M/s. Electromec Technical Associates Post Box 6320 Doha, datar Tel 44328309) Fax: 44321746 ‘We have examined and handed over 0% no. Mitsui levator (Pt 0 installed 2 Vila or_M/s. Khalid Cemant Company at Al-Laga, Doha, Qatar under the contact apreemant LMET/LNGEL4#/GV-REV.03 ted 1605-2015. Yas have npotculr, examined the cabin tng et, and found them tbe in ores “The re maintenance arog ofS years stants from, sper terms ofthe contact, wi ervce the elevator once Ina month and alo aterd to any emergency breakdown calls 24 hours» day onal the 365 days ofthe yea. ‘This elevator are examined by us and found to be satisfactory ia accordance wth the specications of| the contract, requirement of ehedule and thereby absolve us fom any penalties & contra charges that ‘might be levied onus by youn ute, For lactromec Technical Associates Accepted ae Taken over by Fa [Chen/Contractor Name) Sened Senedy CornpanyNameSeat Company Namelseal ae Dae REF: LIFT/EMQUS6-OUMHIN'SAL/AMY 29.08.2016 ‘Mis. Khalid Cement Industries Complex Post Box #3246 Doha, Qatar Tel = 44501111 Fax: 44501777 WARRANTY Sub: Mitsubishi Elevator for Villa for Mis. Khalid Cement Company at Al Lagta, Doha, Qatar. —_——= SS We hereby offer 5 years Warranty for One [01] No. Mitsubishi Elevator installed inthe subject project, commencing from the date of handing over against any defeets whatsoever arising ftom faulty manufactured materials or components, excluding far wear and tear; and that we shall undertake to repair or replace the defective pars including all necessary transport cost, custom duties and labour cos, fe of charge during the above warranty period Youre faithful For ETA MELCO Elevator Doha Co, W.1-1. Haroon Mallick (General Manager

You might also like