Start-up procedure
1. The valves HV231, HV234, HV235, HV236, HV241, HV243, HV244, HV245, HV241
were opened and the valves HV232, HV233, HV240, HV242, HV248, HV249, HV246,
HV250, HV251, HV252, HV253, HV237, HV238 and HV 239 were closed.
2. The Cold Water Tank T-201 and Hot Water Tank T-203 were filled in with water.
3. The instrument air regulator RG1 was set to 2.8 bar.
4. The main panel was switched on.
5. The hot water temperature T-203 was allowed to reach approximately 45C
6. The pump P211 was switched on and FI201 was adjusted to 10LPM by using HV240.
7. The pump P213 was switched on.