SALDO DE OBRA: INSTALACION DEL SISTEMA DE AGUA POTABLE Y AMPLIACION DEL SISTEMA DE

ALCANTARILLADO PARA LA LOCALIDAD DE MANZANARES - HUACHO

RESUMEN GENERAL DE PRESUPUESTO - PAQUETE N 1: SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE

Gastos
ITEM Descripcin Costo Directo Utilidad Sub total IGV Costo Total
Generales

1.00 RESERVORIO APOYADO V=500 M3 - CASETA DE VALVULAS - MANZANARES 302,977.01 9,089.31 6,059.54 318,125.86 60,443.91 378,569.77

2.00 CERCO PERIMETRICO 40,301.60 1,209.05 806.03 42,316.68 8,040.17 50,356.85

3.00 INSTALACIONES HIDRAULICAS CASETA DE VALVULAS - RESERVORIO 500M3 42,689.44 1,280.68 853.79 44,823.91 8,516.54 53,340.46

4.00 SISTEMA DE AGUA POTABLE 1,210,824.26 36,324.73 24,216.49 1,271,365.47 241,559.44 1,512,924.91

5.00 LINEA DE IMPULSION 130,405.63 3,912.17 2,608.11 136,925.91 26,015.92 162,941.83

6.00 PERFORACION POZO TUBULAR P=45MT SECTOR MANZANARES 99,784.63 2,993.54 1,995.69 104,773.86 19,907.03 124,680.90

7.00 CONSTRUCCION DE ESTRUCTURA PARA CASETA DE POZO TUBULAR 56,243.82 1,687.31 1,124.88 59,056.01 11,220.64 70,276.65

8.00 INSTALACIONES ELECTROMECANICAS POZO TUBULAR 186,101.86 5,583.06 3,722.04 195,406.95 37,127.32 232,534.27

COSTO TOTAL PAQUETE N 1 2,069,328.25 62,079.85 41,386.57 2,172,794.66 412,830.99 2,585,625.65

RESUMEN GENERAL DE PRESUPUESTO - PAQUETE N 2: SISTEMA DE ALCANTARILLADO

Gastos
ITEM Descripcin Costo Directo Utilidad Sub total IGV Costo Total
Generales

1.00 SISTEMA DE ALCANTARILLADO 779,625.14 23,388.75 15,592.50 818,606.40 155,535.22 974,141.62

COSTO TOTAL PAQUETE N 2 779,625.14 23,388.75 15,592.50 818,606.40 155,535.22 974,141.62


ITEM Descripcin Costo Total
1.00 RESERVORIO APOYADO V=500 M3 - CASETA DE VALVULAS - MANZANARES 378,569.77
2.00 CERCO PERIMETRICO 50,356.85
3.00 INSTALACIONES HIDRAULICAS CASETA DE VALVULAS - RESERVORIO 500M3 53,340.46
4.00 SISTEMA DE AGUA POTABLE 1,512,924.91
5.00 SISTEMA DE ALCANTARILLADO 1,502,075.28
6.00 LINEA DE IMPULSION 146,538.02
7.00 PERFORACION POZO TUBULAR P=45MT SECTOR MANZANARES 124,680.90
8.00 CONSTRUCCION DE ESTRUCTURA PARA CASETA DE POZO TUBULAR 70,276.65
9.00 INSTALACIONES ELECTROMECANICAS POZO TUBULAR 248,938.08

COSTO TOTAL EN EJECUCION DE OBRAS 4,087,700.93