MOVIMIENTO DE TIERRAS
2.1 EXCAVACION ZANJA CIMIENTO 20.913 3

NPT 0.10

NT 0.10

0.150

1.05 0.8

0.1
Cimiento
Cimiento Eje Tramo
Longitud(m) Ancho(m) rea(m2)
4-4. A-F. 8.3 0.45 3.735
CC-1
A-A. 1-4. 6.87 0.45 3.092
1-1. A-F. 8.3 0.45 3.735
F-F. 1-4. 6.87 0.45 3.092
3-3. B-F. 6.2 0.45 2.790
CC-2
B-B. 3-4. 2.70 0.45 1.215
2-2. A-C. 2.55 0.45 1.148
C-C. 1-2. 2.47 0.45 1.112
= 19.917

= . . = .

2.2 EXCAVACION ZANJA CIMIENTO ESCALERA 0.423

. . = .
2.3 EXCAVACION FONDO PISOS e=0.05m 44.174 2

A3
A1

A2

A5
A4
Aesc

. = + + + + .
= . . = .
= . . = .
= . . = .
= . . = .
= . . = .
. = .
. = .