Project Spreadsheets to BS 8110 The Concrete Centre

Client Advisory Group Made by Date Page


Location 3rd Floor slab, from 1 to 5a rmw Aug-2017 /55
RIBBED SLABS to BS 8110:2005 (Analysis & Design) Checked Revision Job No
Originated from RCC32.xls v4.0 on CD 2006 TCC chg - R68

APPROXIMATE WEIGHT of REINFORCEMENT

TOP STEEL No Type Dia Length Unit Wt Weight


Support 1 2 H 12 1025 0.888 1.8
5 H 8 1025 0.395 2.0
Span 1 1 H 16 2225 1.578 3.5
Support 2 2 H 20 2250 2.466 11.1
4 H 8 2250 0.395 3.6
Span 2 4 H 12 4425 0.888 15.7
Support 3 2 H 20 3625 2.466 17.9
4 H 8 3625 0.395 5.7
Span 3 3 H 12 4675 0.888 12.5
Support 4 2 H 20 2400 2.466 11.8
4 H 8 2400 0.395 3.8

BOTTOM STEE Support 1 1 H 16 1150 1.578 1.8


Span 1 1 H 20 400 2.466 1.0
Support 2 1 H 16 3475 1.578 5.5
Span 2 2 H 25 4750 3.853 36.6
Support 3 2 H 16 3475 1.578 11.0
Span 3 2 H 25 5900 3.853 45.5
Support 4 3 H 16 1725 1.578 8.2

LINKS Span 1 1 H 6 800 0.222 0.2


Span 2 9 H 6 800 0.222 1.6
Span 3 9 H 6 800 0.222 1.6

SUMMARY All figures approximate - see User Guide.


Reinforcement density (kg/m) 12.92 Total rebar per rib, excluding mesh (kg) 202.3