1.

INGLIS DISCHARGE :

Q = 125*A/SQRT(A+10)
A = CATCHMENT AREA

Q = 2092.8947258124

2. MANNING'S DISCHARGE : @ c/s OF BRIDGE SITE

COMP MARKING CH. IN (mt)

91.1
95
1
100
105
109.6

2 A/L 109.6
110
115
P1 120
125
128.2
P2 130
135
140
P3 145
146.8
150
A/R 155
160
165
165.4

3 165.4
170
175
180
183.9

MANNING'S VELOCITY V
RUGOSITY COEFFICIENT n
LONGITUDINAL SLOPE = 1 : N
ANGLE OF SKEWNESS : :DEGREE

COMP 1 :-

Total Area A =
Total perimeter P =

R =
V =

Discharge Q =

COMP 2 :-

Total Area A =
Total perimeter P =

R =
V =

Discharge Q =

COMP 3 :-

Total Area A =
Total perimeter P =

R =
V =

Discharge Q =
Total Discharge in square direction Q =

3. SCOUR DEPTH CALCULATION : (PART 1-IRC:7-1998)

Assumed afflux =
Th. Of bearing =
Side slope for abutment =
Side slope for pier =
Ksf (CL:110.1.3-IRC:5-1998) =
Vertical clearance(CL:106-IRC:5-1998) =
Top width of pier =
Width of pier cap =
pier cap thickness =
Top width of abutment =
Width of abutment cap =

Scour depth calculation d =

Db = Qin/We
Qin = 1.3*Q

Qin = 2717.8727138684
We = 88
so, We = 82.48

Lacy's waterway (4.8 sqrt Qin) =

Db = 32.9519000227

Scour depth d =

4. OBSTRUCTION CALCULATION:

OBSTRUCTION DUE TO PIERS:

Nos. of column as pier =


Obsruction due to one pier =
Hence obstruction due to piers =

OBSTRUCTION DUE TO ABUTMENTS:

Obsruction due to one Abutment =


Hence obstruction due to Abutments =

OBSTRUCTION DUE TO SUPERSTRUCTURE:


Nos. of column as pier =
Obsruction due to one Girder =
Hence obstruction due to Girder =

OBSTRUCTION DUE TO SUPERSTRUCTURE:

Due to Pier and Abutment =


=
OBSTRUCTION DUE TO LEFT BANK: =
OBSTRUCTION DUE TO RIGHT BANK: =
TOTAL OBSTRUCTION DUE TO APPROACHES =

Hence Obstructed discharge =


Clear discharge =
% Obstruction =

5. AFFLUX CALCULATION:

AFFLUX :- H =

V =
Q (Skew / Square) =
q (Skew / Square) =
Hence afflux h =

6. OBSTRUCTED VELOCITY:

Obstructed velociity =

7. ROAD R.L. :

HFL RL =
Afflux =
AHFL =
V.C. =
Depth of Solid slab =
Th. Of wearing coat =
RT(A+10)
NT AREA = 290

cumecs

AT MAIN c/s H.F.L. = 48.414

G.L. IN (mt) DEPTH IN (mt) MEAN DEPTH IN (mt)

45.5952 2.8188
45.689 2.725 2.7719
45.654 2.76 2.7425
45.62 2.794 2.777
45.7482 2.6658 2.7299

45.7582 2.6558 2.7299


45.759 2.655 2.6554
45.377 3.037 2.846
45.166 3.248 3.1425
43.154 5.26 4.254
42.705 5.709 5.4845
42.452 5.962 5.8355
42.633 5.781 5.8715
42.453 5.961 5.871
42.695 5.719 5.84
42.7928 5.6212 5.6701
42.967 5.447 5.5341
44.743 3.671 4.559
44.912 3.502 3.5865
45.249 3.165 3.3335
45.2542 3.1598 3.1624

45.2542 3.1598 3.4154


45.319 3.095 3.1274
45.514 2.9 2.9975
45.768 2.646 2.773
46.0675 2.3465 2.49625

COMP
SUM 1
2
3

= 1/n*(R)2/3*(S)1/2
= 0.025
500 = 0.002
0 = 0

50.96545 Sq. mt
13.9013659392 mt

3.666218861 mt
4.2532467685 m/sec

216.7686355171 Cumecs

267.37426 Sq. mt
50.7855813561 mt

5.2647671418 mt
5.4137030957 m/sec

1447.4848590707 Cumecs

88.494075 Sq. mt
20.0168135934 mt

4.420987116 mt
4.818603096 m/sec

426.4178237725 Cumecs
2090.6713183603 Cumecs (Must be approximately equal to)

0.35 Dirt wall thickness


0.3 Abutment cap thickness
0 Clear width of abutment cap
0 Clear top width of abutment cap
2 RL of soffit of super structure
1.2 RL of top of abutment
1.3 RL of top of pier
1.8 Pier width at avg. GL
1.2 Abutment width at avg. GL
1.2 Obstructed width of abutment at top
1.3 Obstructed width of pier at top

1.34[Db2/Ksf]1/3

Cumecs
3.9 1.62

250.2394599729

Cumecs/m

10.9315507162 m

2 Nos.
7.8896 Sq. m
15.7792 Sq. m

3.9738 Sq. m
7.9476 Sq. m
Nos.
Sq. m
Sq. m

23.7268 Sq. m
128.4498506109 Cumecs
123.8754 Cumecs
77.6425 Cumecs
201.5179 Cumecs

329.9677506109 Cumecs
1760.7035677494 Cumecs
15.782861118 %

[V2/17.88+0.015][(Q/q)2-1]

5.4137030957 m/sec
2090.6713183603 Cumecs
1760.7035677494 Cumecs
0.67809778 m say

m/sec

m
m
m
m
m
m
INPUT
OUTPUT

SQ. KM

MT

LENGTH IN (mt) AREA IN (sq. mt) DIFF G.L. IN (mt)

3.9 10.81041 0.0938


5 13.7125 0.035
5 13.885 0.034
4.6 12.55754 0.1282

4.6 12.55754 0.1382


0.4 1.06216 0.0008
5 14.23 0.382
5 15.7125 0.211
5 21.27 2.012
3.2 17.5504 0.449
1.8 10.5039 0.253
5 29.3575 0.181
5 29.355 0.18
5 29.2 0.242
1.8 10.20618 0.0978
3.2 17.70912 0.1742
5 22.795 1.776
5 17.9325 0.169
5 16.6675 0.337
0.4 1.26496 0.0052

10.4 35.52016 0.5112


4.6 14.38604 0.0648
5 14.9875 0.195
5 13.865 0.254
3.9 9.735375 0.2995

AREA IN (sq. mt) WETTED PERIMETER IN (mt)


50.96545 13.9013659392
267.37426 50.7855813561
88.494075 20.0168135934

Radians
2092.8947258124 Cumecs

= 0.39
= 0.6
ap = 0.91
nt cap = 0.81
ure = 99.5
= 98.6
= 98
= 1.3
L = 0.81
ment at top = 0.81
t top = 1.3

Item For Pier For Abutment


Maximun scour depth D 2*d 1.27*d
21.8631014323 13.8830694095
Maximum SRL= HFL - D 26.5508985677 34.5309305905

Foundation depth Fd= 1.33*D 29.077924905 18.4644823147

Item F.R.L.= HFL - Fd


FRL of PIER = 19.336075095

FRL of ABUTMENT = 29.9495176853


WETTED PERIMETER IN (mt)

3.901128
5.000122
5.000116

4.602076
0.400001
5.014571
5.00445
5.389633
3.231347
1.817693
5.003275
5.003239
5.005853
1.802655
3.204738
5.306051

10.41256
4.600456
5.003801