PEKERJAAN : PERAPIAN MESS DAN PEMBUATAN RUANGAN BARU

LOKASI : MESS PT. FINDOMUDA KOTA TEGAL


TAHUN ANGGARAN : 2016

URAIAN PEMAKAIAN UANG UNTUK BAHAN BANGUNAN DAN ALAT

No. TANGGAL URAIAN JUMLAH SATUAN HARGA SATUAN JUMLAH HARGA

A 3 Mei 2016
1 Kaso 4/6 panjang 2 m 3 Ikat 45,000.00 135,000.00
2 Papan 2/20 panjang 2 m 25 Lbr 13,000.00 325,000.00
3 Ongkos Angkut kayu 30,000.00 30,000.00
4 Batu Bata 2000 bh 800.00 1,600,000.00
5 Split 1 rit (3,5 m3 ) 850,000.00 850,000.00
6 Pasir 1 rit (3,5 m3 ) 450,000.00 450,000.00
7 Semen Bima 50 kg 10 sak 62,000.00 620,000.00
8 Paku 3 cm 1 kg 18,000.00 18,000.00
9 Paku 5 cm 2 kg 12,000.00 24,000.00
10 Paku 7 cm 2 kg 12,000.00 24,000.00
12 Kabel 2 x 1,5 merk kitani 20 m 8,500.00 170,000.00
13 Lampu philips 23 wat 1 bh 35,000.00 35,000.00
14 Benang 3 bh 2,500.00 7,500.00
15 Ember besar 3 bh 7,500.00 22,500.00
16 Ember kecil 5 bh 5,000.00 25,000.00
No. TANGGAL URAIAN JUMLAH SATUAN HARGA SATUAN JUMLAH HARGA

17 Fiting 1 bh 5,000.00 5,000.00


18 Jack 1 bh 4,000.00 4,000.00
19 Bambu 8 btg 27,500.00 220,000.00
20 Pilox 1 bh 23,000.00 23,000.00
21 gergaji besi 1 bh 11,000.00 11,000.00
JUMLAH UANG KELUAR UNTUK MATERIAL MESS BARU TGL 3 MEI 2016 4,599,000.00
B 4 Mei 2016
1 DP pembelian Besi 200,000.00 200,000.00
2 Pelunasan pembelian besi 170 kg 8,500.00 1,245,000.00
3 Hollo 4/4 panjang 4 m tbl 0.4 mm 3 btg 27,500.00 82,500.00
4 Ayakan Pasir 1 cm 1 m2 10,000.00 10,000.00
5 Bendrat 1 kg 16,000.00 16,000.00
6 Gergaji kayu 2 bh 21,250.00 42,500.00
7 Kikir 1 bh 12,500.00 12,500.00
8 Batu kali 1 rit (0.8 m3) 190,000.00 190,000.00
9 Gergaji besi 1 bh 11,000.00 11,000.00
10 Meteran 7,5 m 1 bh 25,000.00 25,000.00
11 Galon kosong 1 bh 35,000.00 35,000.00
12 Garan gergaji 2 bh 17,500.00 35,000.00
13 Pasir 1 rit (3,5 m3 ) 450,000.00 450,000.00
JUMLAH UANG KELUAR UNTUK MATERIAL MESS BARU 2,354,500.00
C 5 Mei 2016
No. TANGGAL URAIAN JUMLAH SATUAN HARGA SATUAN JUMLAH HARGA

1 Semen Tiga Roda 50 kg 10 sak 64,000.00 640,000.00


2 Pasir 1 rit (3,5 m3 ) 450,000.00 450,000.00
3 Batu Bata 1500 bh 800.00 1,200,000.00

JUMLAH UANG KELUAR UNTUK MATERIAL MESS BARU 2,290,000.00


D 6 Mei 2016
1 Pasir 1 rit ( 6 m3) 1,200,000.00 1,200,000.00
2 Koas 4" 3 bh 15,000.00 45,000.00
3 Roll cat ACE Prima 1 bh 25,000.00 25,000.00
4 Roll cat DanaPaint 1 bh 15,000.00 15,000.00
5 Amplas 120 mm 2 m 7,500.00 15,000.00
6 Bak cat prima 1 bh 14,000.00 14,000.00
7 Cat Kayu Avian no.331 1 galon kecil 1 kg 51,000.00 51,000.00
8 Cat dinding Decolith SW 1 pile (25kg) 480,000.00 480,000.00
9 Cat dinding Aries Gold SW 1 pile (25kg) 200,000.00 200,000.00
10 Bendrat 1 kg 16,000.00 16,000.00
11 Compound 5 kg 3,500.00 17,500.00
12 Sekrap besar 2 bh 5,000.00 10,000.00
13 Pengki ( Serok Plastik) 1 bh 25,000.00 25,000.00
14 Ember kecil 2 bh 5,000.00 10,000.00
15 Ember besar 1 bh 7,500.00 7,500.00
16 Glass block 6 bh (1dus) 22,500.00 135,000.00
No. TANGGAL URAIAN JUMLAH SATUAN HARGA SATUAN JUMLAH HARGA

17 Semen merk bima 10 sak 62,000.00 620,000.00


18 Ayakan Pasir 0,5 cm 1 m2 17,500.00 17,500.00
19 Semen putih 5 kg 3,000.00 15,000.00
20 Sekrap kecil 1 bh 3,000.00 3,000.00
21 Lem Fox 2 11000 11,000.00 22,000.00
22 Kusen pintu 90 x 2,05 m kayu Bangkirai 1 unit 500,000.00 500,000.00
23 Kusen jendela 55 x 70 m Kayu bangkirai 2 unit 250,000.00 500,000.00
24 Amplas halus 3 m 3,000.00 9,000.00
25 Kabel biasa 5 m 3,500.00 17,500.00
26 Fiting gantung 1 bh 4,000.00 4,000.00
27 Jeck broco 1 bh 4,000.00 4,000.00
28 Tespen Kecil 1 bh 2,000.00 2,000.00
29 Lampu philips 14 wat 1 bh 30,000.00 30,000.00
30 Lampu philips 18 wat 1 bh 31,500.00 31,500.00
31 Asbes 1 x 1.88 9 lbr 66,500.00 598,500.00
32 Asbes 1 x 1.5 9 lbr 53,500.00 481,500.00
33 Keramik merk Asia warna putih polos 38 dos 40,000.00 1,520,000.00
34 Semen merk gresik 50 kg 20 sak 60,000.00 1,200,000.00
JUMLAH UANG KELUAR UNTUK MATERIAL MESS BARU 7,841,500.00
E 7 Mei 2016
1 Kayu kruing 5/10 panjang 4 m 2 btg 115,000.00 230,000.00
2 Paku payung 7 cm 1 kg 25,000.00 25,000.00
No. TANGGAL URAIAN JUMLAH SATUAN HARGA SATUAN JUMLAH HARGA

3 Cat Avian 1 kaleng (0,5kg) 29,000.00 29,000.00


4 Paku payung 10 cm 1 kg 35,000.00 35,000.00
5 Karet paku payung 1 pcs 5,000.00 5,000.00
6 Karet paku payung 2 pcs 3,500.00 7,000.00
7 Kusen jendela 0.7 x 1 m kayu jawa 1 unit 200,000.00 200,000.00
8 Thinner merk Impala 1 kaleng 23,500.00 23,500.00
9 Meni besi 2 kaleng 38,000.00 76,000.00
10 Terpentin 2 botol 16,000.00 32,000.00
11 Kuas 1/2 " 2 bh 10,000.00 20,000.00
JUMLAH UANG KELUAR UNTUK MATERIAL MESS BARU 682,500.00
F 8 Mei 2016
1 Thinner merk Impala 2 bh 23,500.00 47,000.00
2 Cat Avian besi waran hijau 1 kaleng (1kg) 51,000.00 51,000.00
3 Saklar 5/5 1 bh 11,500.00 11,500.00
4 Saklar engkel 1 bh 8,750.00 8,750.00
5 Saklar scop 3 bh 9,750.00 29,250.00
6 Fiting lampu 3 bh 1,800.00 5,400.00
7 Peralon 5 m 2,000.00 10,000.00
8 Klem pralon 1 bh 4,500.00 4,500.00
9 Isolasi 1 bh 4,500.00 4,500.00
10 Kabel NYA 1.5 100 m 1,370.00 137,000.00
11 Perlengkapan (muc + dos+keni) 25 unit 350.00 8,750.00
No. TANGGAL URAIAN JUMLAH SATUAN HARGA SATUAN JUMLAH HARGA

12 Lampu 14 wat philips 3 bh 31,500.00 94,500.00


JUMLAH UANG KELUAR UNTUK MATERIAL MESS BARU 412,150.00
F 9 Mei 2016
1 Cat besi Avian 2 kg 51,000.00 102,000.00
2 Thinner Impala 1 kaleng 23,000.00 23,000.00
3 Lampu philips 14 wat 1 bh 30,000.00 30,000.00
4 Fiting duduk 1 bh 5,000.00 5,000.00
Jeck broco 1 bh 11,000.00 11,000.00
JUMLAH UANG KELUAR UNTUK MATERIAL MESS BARU 171,000.00
G 10 Mei 2016
1 Cat Decolith SW 1 pile (25kg) 480,000.00 480,000.00
2 Cat Aries gold SW 1 pile (25kg) 200,000.00 200,000.00
3 Kayu kruing 4/6 panjang 4 m 1 btg 50,000.00 50,000.00
JUMLAH UANG KELUAR UNTUK MATERIAL MESS BARU 730,000.00
H 11 Mei 2016
1 Pasir 1 rit ( 6 m3) 1,000,000.00 1,000,000.00
2 lampu philips 14 wat 3 bh 27,500.00 82,500.00
3 Fiting lampu 3 bh 5,000.00 15,000.00
4 Engsel jendela 3" 3 doz 8,000.00 24,000.00
5 Engsel pintu 4" 3 doz 9,000.00 27,000.00
6 Hollow 4/4 tbl 0.3 25 btg 24,500.00 612,500.00
7 Gypsum starband 9mm 8 lbr 59,000.00 472,000.00
No. TANGGAL URAIAN JUMLAH SATUAN HARGA SATUAN JUMLAH HARGA

8 list polos gypsum 11 btg 7,000.00 77,000.00


9 compound merk A + 1 sak 60,000.00 60,000.00
10 Strimin lem 2 bh 12,000.00 24,000.00
11 Sekrup hollow A+ 1 doz 40,000.00 40,000.00
12 Sekrap plastik 1 bh 4,000.00 4,000.00
JUMLAH UANG KELUAR UNTUK MATERIAL MESS BARU 2,438,000.00

JUMLAH TOTAL UANG KELUAR SEMENTARA UNTUK BAHAN DAN ALAT 21,518,650.00
No Tanggal Pembelian Nama Lampu Jumlah Satuan

1 3 Mei 2016 Lampu philips 23 wat 1 bh


2 6 Mei 2016 Lampu philips 14 wat 1 bh
3 Lampu philips 18 wat 1 bh
4 8 Mei 2016 Lampu 14 wat philips 3 bh
5 9 Mei 2016 Lampu philips 14 wat 1 bh
6 11 Mei 2016 Lampu philips 14 wat 3 bh
10
Harga Jumlah Harga

35,000.00 35,000.00
30,000.00 30,000.00
31,500.00 31,500.00
31,500.00 94,500.00
30,000.00 30,000.00
27,500.00 82,500.00
PEKERJAAN : PERAPIAN MESS DAN PEMBUATAN RUANGAN BARU
LOKASI : MESS PT. FINDOMUDA KOTA TEGAL
TAHUN ANGGARAN : 2016

URAIAN PEMAKAIAN UANG TENAGA KERJA

No. TANGGAL MINGGU KE JUMLAH UANG

1 4 Mei 2016 I 500,000.00


2 6 Mei 2016 I 500,000.00
3 6 Mei 2016 I 300,000.00
4 7 Mei 2016 I 500,000.00
5 9 Mei 2016 II 6,100,000.00
6 9 Mei 2016 II 300,000.00
7 11 Mei 2016 II 500,000.00

8,700,000.00

JUMLAH TOTAL UANG KELUAR SEMENTARA UNTUK TENAGA KERJA


AN PEMBUATAN RUANGAN BARU
UDA KOTA TEGAL

G TENAGA KERJA

KETERANGAN

Pembuatan Kamar tidur


Pembuatan Kamar tidur
Pengecatan Mess
Pembuatan Kamar tidur
Pelunasan Pembuatan Kamar tidur
Pengecatan Mess
Kas bon Perapian Dapur

8,700,000.00