Bored cast-in-situ M35 grade R.C.C.

Pile excluding Reinforcement


complete as per Drawing and Technical Specifications and removal
of excavated earth with all lifts and lead upto 1000 m.

Pile diameter-750 mm
Unit = meter
Taking output = 15 m
a) Materials
PCC Grade M35 cum 6.62 #VALUE!

Rate for concrete may be adopted same as for bottom plug vide item no.
12.11( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and hour 6.00 input
complete accessories including shifting from one bore location to
another.
Hire and running charges of light crane for lowering reinforcement hour 0.50 input
cage
Hire and running charges of Bentonite pump hour 6.00 Rate
included in
piling rig
Loader I cum bucket capacity. hour 0.30 input
Tipper 5.5 cum capacity for disposal of muck from pile bore hole hour 0.30 input
Bentonite kg 300.00 input
c) Labour
Mate/Supervisor day 0.14 input
Mazdoor day 3.50 input
d) Overhead charges @ input on (b+c)
e) Contractor's profit @ input on (b+c+d)
Cost for 15 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/15
say
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement
complete as per Drawing and Technical Specifications and removal
of excavated earth with all lifts and lead upto 1000 m.

Pile diameter-1000 mm
Unit = meter
Taking output = 10 m
a) Materials
PCC Grade M35 cum 7.85 #VALUE!

Rate for concrete may be adopted same as for bottom plug vide item
no. 12.11( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and hour 6.00 input
complete accessories including shifting from one bore location to
another.
Hire and running charges of light crane for lowering reinforcement hour 0.50 input
cage
Hire and running charges of Bentonite pump hour 6.00 Rate
included in
piling rig
Loader I cum bucket capacity. hour 0.40 input
Tipper 5.5 cum capacity for disposal of muck from pile bore hole hour 0.40 input
Bentonite kg 350.00 input
c) Labour
Mate/Supervisor day 0.16 input
Mazdoor day 4.00 input
d) Overhead charges @ input on (b+c)
e) Contractor's profit @ input on (b+c+d)
Cost for 10 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/10
say
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement
complete as per Drawing and Technical Specifications and removal
of excavated earth with all lifts and lead upto 1000 m.

Pile diameter-1200 mm
Unit = meter
Taking output = 9 m
a) Materials
PCC Grade M35 cum 10.17 #VALUE!

Rate for concrete may be adopted same as for bottom plug vide item no.
12.11( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and hour 6.00 input
complete accessories including shifting from one bore location to
another.
Hire and running charges of light crane for lowering reinforcement hour 0.50 input
cage
Hire and running charges of Bentonite pump hour 6.00 Rate
included in
piling rig
Loader I cum bucket capacity. hour 0.50 input
Tipper 5.5 cum capacity for disposal of muck from pile bore hole hour 0.50 input
Bentonite kg 385.00 input
c) Labour
Mate/Supervisor day 0.18 input
Mazdoor day 4.50 input
d) Overhead charges @ input on (b+c)
e) Contractor's profit @ input on (b+c+d)
Cost for 9 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/9
say
Driven cast-in-place vertical M35 grade R.C.C. Pile excluding
Reinforcement complete as per Drawing and & Technical
Specification
Pile diameter - 750 mm
Unit = Running meter
Taking output = 40 metre
a) Materials
PCC Grade M35 cum 17.66 #VALUE!

Rate for concrete may be adopted same as for bottom plug vide item no.
12.11( C ) (IV)
b) Materials Pile shoes
i) C.I. shoes for the pile Kg 160.00 input
ii) M.S. clamps for shoe @ 35 Kg per pile of 15 m Kg 70.00 input
iii) Steel helmet and cushion block on top of casing head during Kg 50.00 input
driving
c) Machinery
Hire and running charges of piling rig Including double acting pile hour 6.00 input
driving hammer complete with power unit and accessories..
Hiring and running charges for light crane 5 tonnes lifting capacity for hour 0.50 input
lowering reinforcement and handling steel casing.
d) Labour
Mate/Supervisor day 0.12 input
Mazdoor day 3.00 input
e) Overhead charges @ input on (b+c+d)
f) Contractor's profit @ input on (b+c+d+e)
Cost for 40 m = a+b+c+d+e
Rate per metre (a+b+c+d+e)/40
say
Note 1.The quantity of concrete required to be removed above the designed top
level of concrete, if any, will be provided for in the rate analysis.
2.In case steel lining is included in the design for driven cast-in-situ pile and
is planned to be retained, the same may be included in the rate analysis. In
case the temporary steel casing used during casting is planned to be
removed, an additional cost @ 0.50 per cent of cost of concrete may be
provided to cover its usage.
Driven cast-in-place vertical M35 grade R.C.C. Pile excluding
Reinforcement complete as per Drawing and & Technical
Specification
Pile diameter - 1000 mm
Unit = Running meter
Taking output = 30 metre
a) Materials
PCC Grade M35 cum 23.55 #VALUE!
Rate for concrete may be adopted same as for bottom plug vide item
no. 12.11( C ) (IV)
b) Materials Pile shoes
i) C.I. shoes for the pile Kg 160.00 input
ii) M.S. clamps for shoe @ 35 Kg per pile of 15 m Kg 70.00 input
iii) Steel helmet and cushion block on top of casing head during Kg 50.00 input
driving
c) Machinery
Hire and running charges of piling rig Including double acting pile hour 6.00 input
driving hammer complete with power unit and accessories.
Hiring and running charges for light crane 5 tonnes lifting capacity for hour 0.50 input
lowering reinforcement and handling steel casing.
Hire and running charges for light crane for lowering reinforcement hour 0.50 input
cage.
d) Labour
Mate/Supervisor day 0.16 input
Mazdoor day 4.00 input
e) Overhead charges @ input on (b+c+d)
f) Contractor's profit @ input on (b+c+d+e)
Cost for 30 m = a+b+c+d+e
Rate per metre (a+b+c+d+e)/30
say
Note 1.The quantity of concrete required to be removed above the designed top
level of concrete, if any, will be provided for in the rate analysis.
2.In case steel lining is included in the design for driven cast-in-situ pile and
is planned to be retained, the same may be included in the rate analysis. In
case the temporary steel casing used during casting is planned to be
removed, an additional cost @ 0.50 per cent of cost of concrete may be
provided to cover its usage.
Driven cast-in-place vertical M35 grade R.C.C. Pile excluding
Reinforcement complete as per Drawing and & Technical
Specification
Pile diameter - 1200 mm
Unit = Running meter
Taking output = 20 metre
a) Materials
PCC Grade M35 cum 22.61 #VALUE!

Rate for concrete may be adopted same as for bottom plug vide item
no. 12.11( C ) (IV)
b) Materials Pile shoes
i) C.I. shoes for the pile Kg 160.00 input
ii) M.S. clamps for shoe @ 35 Kg per pile of 15 m Kg 70.00 input
iii) Steel helmet on top of casing head during driving Kg 50.00 input
c) Machinery
Hire and running charges of piling rig Including double acting pile hour 6.00 input
driving hammer complete with power unit and accessories.
Hiring and running charges for light crane 5 tonnes lifting capacity for hour 0.50 input
lowering reinforcement and handling steel casing.
d) Labour
Mate/Supervisor day 0.18 input
Mazdoor day 4.50 input
e) Overhead charges @ input on (b+c+d)
f) Contractor's profit @ input on (b+c+d+e)
Cost for 20 m = a+b+c+d+e
Rate per metre (a+b+c+d+e)/20
say
Note 1.The quantity of concrete required to be removed above the designed top
level of concrete, if any, will be provided for in the rate analysis.
2.In case steel lining is included in the design for driven cast-in-situ pile and
is planned to be retained, the same may be included in the rate analysis. In
case the temporary steel casing used during casting is planned to be
removed, an additional cost @ 0.50 per cent of cost of concrete may be
provided to cover its usage.
Driven precast vertical M35 grade R.C.C. Piles excluding
Reinforcement complete as per Drawing and & Technical
Specification
Pile Diameter = 500 mm
Unit = Running Meter
Taking output = 60 m
a) Materials
RCC Grade M35 cum 11.78 #VALUE!

Rate for concrete may be adopted same as for bottom plug vide item
no. 12.11( F ) (IV)
b ) Material Pile shoes
a) C.I Shoes Kg 240.00 input
b) M.S. shoes Kg 105.00 input
c) Steel helmet and cushion block on top of pile head during driving. Kg 30.00 input
c) Machinery
Crane20 t capacity hour 6.00 input
Vibrating Pile driving hammer complete with power unit and hour 6.00 input
accessories.
d) Labour
Mate/Supervisor day 0.12 input
Mazdoor day 3.00 input
Add 1 per cent of (a+b+c) for carriage of piles from casting yard
to work site and stacking, and other imponderables during
e) installation.charges @ input on (b+c+d)
Overhead
f) Contractor's profit @ input on (b+c+d+e)
Cost for 60 m = a+b+c+d+e+f
Rate per metre (a+b+c+d+e+f)/60
say
Note The quantity of concrete required to be removed above the designed top
level of concrete, if any, will be provided for in the rate analysis.
Driven precast vertical M35 grade R.C.C. Piles excluding
Reinforcement complete as per Drawing and & Technical
Specification
Pile Diameter = 750 mm
Unit = Running Meter
Taking output = 50 m
a) Materials
RCC Grade M35 cum 22.08 #VALUE!

Rate for concrete may be adopted same as for bottom plug vide item
no. 12.11( F ) (IV)
b ) Material Pile shoes
a) C.I. shoes Kg 160.00 input
b) M.S. shoes Kg 70.00 input
c) Steel helmet and cushion block on top of pile head during driving. Kg 40.00 input
c) Machinery
Crane 40 T capacity hour 6.00 input
Vibrating Pile driving hammer complete with power unit and hour 6.00 input
accessories.
d) Labour
Mate/Supervisor day 0.16 input
Mazdoor day 4.00 input
Add 1 per cent of (a+b+c) for carriage of piles from casting yard
to work site and stacking, and other imponderables during
e) installation.charges @ input on (b+c+d)
Overhead
f) Contractor's profit @ input on (b+c+d+e)
Cost for 50 m = a+b+c+d+e+f
Rate per metre (a+b+c+d+e+f)/50
say
Note The quantity of concrete required to be removed above the designed top
level of concrete, if any, will be provided for in the rate analysis.
Driven precast vertical M35 grade R.C.C. Piles excluding
Reinforcement complete as per Drawing and & Technical
Specification
Pile Diameter = 1000 mm
Unit = Running Meter
Taking output = 40 m
a) Materials
RCC Grade M35 cum 31.40 #VALUE!

Rate for concrete may be adopted same as for bottom plug vide item
no. 12.11( F ) (IV)
b ) Material Pile shoes
a) C.I. shoes for the pile Kg 160.00 input
b) M.S. shoes @ 35 Kg per pile of 15 m Kg 70.00 input
c) Steel helmet and cushion block on top of pile head during driving. Kg 50.00 input
c) Machinery
Crane 50 t capacity. hour 6.00 input
Vibrating Pile driving hammer complete with power unit and hour 6.00 input
accessories.
d) Labour
Mate/Supervisor day 0.20 input
Mazdoor day 5.00 input
Add 1 per cent of (a+b+c) for carriage of piles from casting yard
to work site and stacking, and other imponderables during
e) installation.charges @ input on (b+c+d)
Overhead
f) Contractor's profit @ input on (b+c+d+e)
Cost for 40 m = a+b+c+d+e+f
Rate per metre (a+b+c+d+e+f)/40
say
Note The quantity of concrete required to be removed above the designed top
level of concrete, if any, will be provided for in the rate analysis.
Driven precast vertical M35 grade R.C.C. Piles excluding
Reinforcement complete as per Drawing and & Technical
Specification
Size of pile - 300 mm x 300 mm
Unit = Running Meter
Taking output = 60 m
a) Materials
RCC Grade M-35
Rate for concrete may be adopted same as for bottom plug vide item cum 5.40 #VALUE!
no. 12.11( F ) (IV)
b ) Material Pile shoes
a) C I shoes kg 240.00 input
b) M. S shoes kg 105.00 input
c) Steel helmet and cushion block on top of pile head during driving. Kg 30.00 input
c) Machinery
Crane 10 tonne capacity hour 6.00 input
Vibrating Pile driving hammer complete with power unit and hour 6.00 input
accessories.
d ) Labour
Mate/Supervisor day 0.12 input
Mazdoor day 3.00 input
Add 1 per cent of (a+b+c) for carriage of piles from casting yard
to work site and stacking, and other imponderables during
e) installation.charges @ input on (b+c+d)
Overhead
f) Contractor's profit @ input on (b+c+d+e)
Cost for 60 m = a+b+c+d+e+f
Rate per metre (a+b+c+d+e+f)/60
say
Note The quantity of concrete required to be removed above the designed top
level of concrete, if any, will be provided for in the rate analysis.
Driven precast vertical M35 grade R.C.C. Piles excluding
Reinforcement complete as per Drawing and & Technical
Specification
Size of pile - 500 mm x 500 mm
Unit = Running Meter
Taking output = 50 m
a) Materials
RCC Grade M-35
Rate for concrete may be adopted same as for bottom plug vide item cum 12.50 #VALUE!
no. 12.11( F ) (IV)
b ) Material Pile shoes
a) C I shoes kg 160.00 input
b) M. S shoes kg 70.00 input
c) Steel helmet and cushion block on top of pile head during driving. Kg 30.00 input
c) Machinery
Crane 20 tonne capacity hour 6.00 input
Vibrating Pile driving hammer complete with power unit and hour 6.00 input
accessories.
d ) Labour
Mate/Supervisor day 0.16 input
Mazdoor day 4.00 input
Add 1 per cent of (a+b+c) for carriage of piles from casting yard
to work site and stacking, and other imponderables during
e) installation.charges @ input on (b+c+d)
Overhead
f) Contractor's profit @ input on (b+c+d+e)
Cost for 50 m = a+b+c+d+e+f
Rate per metre (a+b+c+d+e+f)/50
say
Note The quantity of concrete required to be removed above the designed top
level of concrete, if any, will be provided for in the rate analysis.
Driven precast vertical M35 grade R.C.C. Piles excluding
Reinforcement complete as per Drawing and & Technical
Specification
Size of pile - 750 mm x 750 mm
Unit = Running Meter
Taking output = 40 m
a) Materials
RCC Grade M-35
Rate for concrete may be adopted same as for bottom plug vide item cum 22.50 #VALUE!
no. 13.11( F ) (IV)
b ) Material
Pile shoes
a) C I shoes kg 160.00 input
b) M. S shoes kg 70.00 input
c) Steel helmet and cushion block on top of pile head during driving. Kg 30.00 input
c) Machinery
Crane 20 tonne capacity hour 6.00 input
Vibrating Pile driving hammer complete with power unit and hour 6.00 input
accessories.
d ) Labour
Mate/Supervisor day 0.18 input
Mazdoor day 4.50 input
Add 1 per cent of (a+b+c) for carriage of piles from casting yard
to work site and stacking, and other imponderables during
e) installation.charges @ input on (b+c+d)
Overhead
f) Contractor's profit @ input on (b+c+d+e)
Cost for 40 m = a+b+c+d+e+f
Rate per metre (a+b+c+d+e+f)/40
say
Note The quantity of concrete required to be removed above the designed top
level of concrete, if any, will be provided for in the rate analysis.
Driven Vertical Steel Piles complete as per Drawing and & Technical
Specification
Section of the pile - H Section steel column 400 x 250 mm (ISHB Series)
Unit = Running Meter
Taking output = 70 m
a) Materials
Structural steel including 5 per cent wastage @ 82.20 kg/m tonnes 6.04 input
b) Machinery
Crane 10 T capacity hour 6.00 input
Vibrating Pile driving hammer complete with power unit and other hour 6.00 input
accessories.
c) Labour
Mate/Supervisor day 0.12 input
Mazdoor day 3.00 input
Add 0.5 per cent of (a+b+c) for providing steel helmet on top of
pile head during driving, stacking of piles at site, providing anti-
corrosion treatment and other imponderables during installation.
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 70 m = a+b+c+d+e
Rate per metre (a+b+c+d+e)/70
say
Driven Vertical Steel Piles complete as per Drawing and & Technical
Specification
Section of the pile - H Section steel column 450 x 250 mm (ISHB Series)
Unit = Running Meter
Taking output = 60 m
a) Materials
Structural steel including 5 per cent wastage @92.50 kg/m tonnes 5.83 input
b) Machinery
Crane 10 T capacity hour 6.00 input
Vibrating Pile driving hammer complete with power unit and hour 6.00 input
accessories.
c) Labour
Mate/Supervisor day 0.14 input
Mazdoor day 3.50 input
Add 0.5 per cent of (a+b+c) for providing steel helmet and
cushion block on top of pile head during driving, stacking of piles at
site, providing anti-corrosive treatment and other imponderables
during installation.
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 60 m = a+b+c+d+e
Rate per metre (a+b+c+d+e)/60
say
Pile Load Test on single Vertical Pile in accordance with
IS:2911(Part-IV)
Unit = 1 MT
Taking output = 1 MT
a) Initial and routine load test tonne 1.00 300.00
b) Lateral load test tonne 1.00 5000.00
Note Although, this item is incidental to work and is not required to be included in
BOQ of contract, the same is required to be added in the estimate to assess
cost of work.
Cement Concrete for Reinforced Concrete in Pile Cap complete as
per Drawing and Technical Specification
A RCC Grade M20
Unit = cum
Taking output = 15 cum
(i) Using Concrete Mixer
a) Material
Cement tonne 5.12 input
Coarse sand cum 6.75 input
20 mm Aggregate cum 8.10 input
10 mm Aggregate cum 5.40 input
b) Labour
Mate day 0.90 input
Mason day 1.50 input
Mazdoor for concreting day 20.00 input
Mazdoor for breaking pile head, bending bars, cleaning etc. day 1.00 input
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 input
Generator (capacity 33 KVA) hour 6.00 input
Formwork @ 4 per cent on cost of concrete i.e. cost of a)
Material, b) Labour and c) Machinery
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
say
(ii) Using Batching Plant, Transit Mixer and Concrete Pump
a) Material
Cement tonne 5.12 input
Coarse sand cum 6.75 input
20 mm Aggregate cum 8.10 input
10 mm Aggregate cum 5.40 input
b) Labour
Mate day 0.16 input
Mason day 0.38 input
Mazdoor for concreting day 2.50 input
Mazdoor for breaking pile head, bending bars, cleaning etc. day 1.00 input
c) Machinery
Batching Plant @ 20 cum/hour hour 0.75 input
Generator 100 KVA hour 0.75 input
Loader (capacity 1 cum) hour 0.75 input
Transit Mixer ( capacity 4.0 cu.m )
Lead upto 1 Km hour 2.00 input
Lead beyond 1 Km, L - lead in Kilometer tonne.km 37.5L input

Concrete Pump hour 0.75 input


Formwork @ 4 per cent on cost of concrete i.e. cost of a)
Material, b) Labour and c) Machinery
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
say
Note The value of a, b and c may be taken as applicable i.e. either using concrete
mixer or batching plant.
B RCC Grade M25
Unit = cum
Taking output = 15 cum
(i) Using Concrete Mixer
a) Material
Cement tonne 5.99 input
Coarse sand cum 6.75 input
20 mm Aggregate cum 8.10 input
10 mm Aggregate cum 5.40 input
b) Labour
Mate day 0.90 input
Mason day 1.50 input
Mazdoor for concreting day 20.00 input
Mazdoor for breaking pile head, bending bars, cleaning etc. day 1.00 input
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 input
Generator (capacity 33 KVA) hour 6.00 input
Formwork @ 4 per cent on cost of concrete i.e. cost of a)
Material, b) Labour and c) Machinery
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
say
(ii) Using Batching Plant, Transit Mixer and Concrete Pump
a) Material
Cement tonne 5.99 input
Coarse sand cum 6.75 input
20 mm Aggregate cum 8.10 input
10 mm Aggregate cum 5.40 input
b) Labour
Mate day 0.16 input
Mason day 0.38 input
Mazdoor for concreting day 2.50 input
Mazdoor for breaking pile head, bending bars, cleaning etc. day 1.00 input
c) Machinery
Batching Plant @ 20 cum/hour hour 0.75 input
Generator 125 KVA hour 0.75 input
Loader (capacity 1 cum) hour 0.75 input
Transit Mixer ( capacity 4.0 cu.m )
Lead upto 1 Km hour 2.00 input
Lead beyond 1 Km, L - lead in Kilometer tonne.km 37.5L input

Concrete Pump hour 0.75 input


Formwork @ 4 per cent on cost of concrete i.e. cost of a)
Material, b) Labour and c) Machinery
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
say
Note The value of a, b and c may be taken as applicable i.e. either using concrete
mixer or batching plant.
C RCC Grade M30
Unit = cum
Taking output = 15 cum
(i) Using Concrete Mixer
a) Material
Cement tonne 6.10 input
Coarse sand cum 6.75 input
20 mm Aggregate cum 8.10 input
10 mm Aggregate cum 5.40 input
b) Labour
Mate day 0.90 input
Mason day 1.50 input
Mazdoor for concreting day 20.00 input
Mazdoor for breaking pile head, bending bars, cleaning etc. day 1.00 input
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 input
Generator (capacity 33 KVA) hour 6.00 input
Formwork @ 4 per cent on cost of concrete i.e. cost of a)
Material, b) Labour and c) Machinery
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
say
(ii) Using Batching Plant, Transit Mixer and Concrete Pump
a) Material
Cement tonne 6.10 input
Coarse sand cum 6.75 input
20 mm Aggregate cum 8.10 input
10 mm Aggregate cum 5.40 input
b) Labour
Mate day 0.16 input
Mason day 0.38 input
Mazdoor for concreting day 2.50 input
Mazdoor for breaking pile head, bending bars, cleaning etc. day 1.00 input
c) Machinery
Batching Plant @ 20 cum/hour hour 0.75 input
Generator 100 KVA hour 0.75 input
Loader (capacity 1 cum) hour 0.75 input
Transit Mixer ( capacity 4.0 cu.m )
Lead upto 1 Km hour 2.00 input
Lead beyond 1 Km, L - lead in Kilometer tonne.km 37.5L input

Concrete Pump hour 0.75 input


Formwork @ 4 per cent on cost of concrete i.e. cost of a)
Material, b) Labour and c) Machinery
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
say
Note The value of a, b and c may be taken as applicable i.e. either using concrete
mixer or batching plant.
D RCC Grade M35
Unit = cum
Taking output = 15 cum
(i) Using Concrete Mixer
a) Material
Cement tonne 6.33 input
Coarse sand cum 6.75 input
20 mm Aggregate cum 8.10 input
10 mm Aggregate cum 5.40 input
b) Labour
Mate day 0.90 input
Mason day 1.50 input
Mazdoor day 20.00 input
Mazdoor for breaking pile head, bending bars, cleaning etc. day 1.00 input
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 input
Generator (capacity 33 KVA) hour 6.00 input
Formwork @ 4 per cent on cost of concrete i.e. cost of a)
Material, b) Labour and c) Machinery
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
say
(ii) Using Batching Plant, Transit Mixer and Concrete Pump
a) Material
Cement tonne 6.33 input
Coarse sand cum 6.75 input
20 mm Aggregate cum 8.10 input
10 mm Aggregate cum 5.40 input
b) Labour
Mate day 0.16 input
Mason day 0.38 input
Mazdoor for concreting day 2.50 input
Mazdoor for breaking pile head, bending bars, cleaning etc. day 1.00 input
c) Machinery
Batching Plant @ 20 cum/hour hour 0.75 input
Generator 125 KVA hour 0.75 input
Loader (capacity 1 cum) hour 0.75 input
Transit Mixer ( capacity 4.0 cu.m )
Lead upto 1 Km hour 2.00 input
Lead beyond 1 Km, L - lead in Kilometer tonne.km 37.5L input

Concrete Pump hour 0.75 input


Formwork @ 4 per cent on cost of concrete i.e. cost of a) Material,
b) Labour and c) Machinery
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
say
Levelling Course for Pile cap
#VALUE! Item 12.11
(C) iv

#VALUE! P&M-036

#VALUE! P&M-013

#VALUE! P&M-017
#VALUE! P&M-048
#VALUE! M-071

#VALUE! L-12
#VALUE! L-13
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! Item 12.11


(C) iv
#VALUE! P&M-036

#VALUE! P&M-013

#VALUE! P&M-017
#VALUE! P&M-048
#VALUE! M-071

#VALUE! L-12
#VALUE! L-13
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! Item 12.11


(C) iv

#VALUE! P&M-036

#VALUE! P&M-013

#VALUE! P&M-017
#VALUE! P&M-048
#VALUE! M-071

#VALUE! L-12
#VALUE! L-13
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! Item 12.11


(C) iv

#VALUE! M-080
#VALUE! M-124
#VALUE! M-173

#VALUE! P&M-085

#VALUE! P&M-070

#VALUE! L-12
#VALUE! L-13
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! Item 12.11


(C) iv
#VALUE! M-080
#VALUE! M-124
#VALUE! M-173

#VALUE! P&M-085

#VALUE! P&M-070

#VALUE! P&M-013

#VALUE! L-12
#VALUE! L-13
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! Item 12.11


(C) iv

#VALUE! M-080
#VALUE! M-124
#VALUE! M-173

#VALUE! P&M-085

#VALUE! P&M-070
#VALUE! L-12
#VALUE! L-13
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! Item 12.11


(F) iv

#VALUE! M-080
#VALUE! M-125
#VALUE! M-173

#VALUE! P&M-073
#VALUE! P&M-092

#VALUE! L-12
#VALUE! L-13
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE! Item 12.11
(F) iv

#VALUE! M-080
#VALUE! M-125
#VALUE! M-173

#VALUE! P&M-074
#VALUE! P&M-092

#VALUE! L-12
#VALUE! L-13
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! Item 12.11


(F) iv

#VALUE! M-080
#VALUE! M-125
#VALUE! M-173

#VALUE! P&M-011
#VALUE! P&M-092
#VALUE! L-12
#VALUE! L-13
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! Item 12.11


(F) iv

#VALUE! M-080
#VALUE! M-125
#VALUE! M-173

#VALUE! P&M-071
#VALUE! P&M-092

#VALUE! L-12
#VALUE! L-13
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE! Item 12.11
(F) iv

#VALUE! M-080
#VALUE! M-125
#VALUE! M-173

#VALUE! P&M-073
#VALUE! P&M-092

#VALUE! L-12
#VALUE! L-13
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! Item 12.11


(F) iv

#VALUE! M-080
#VALUE! M-125
#VALUE! M-173

#VALUE! P&M-073
#VALUE! P&M-092

#VALUE! L-12
#VALUE! L-13
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! M-179

#VALUE! P&M-071
#VALUE! P&M-092

#VALUE! L-12
#VALUE! L-13
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! M-179

#VALUE! P&M-071
#VALUE! P&M-092

#VALUE! L-12
#VALUE! L-13
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! M-081
#VALUE! M-005
#VALUE! M-053
#VALUE! M-051

#VALUE! L-12
#VALUE! L-10
#VALUE! L-13
#VALUE! L-13

#VALUE! P&M-009
#VALUE! P&M-079
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! M-081
#VALUE! M-004
#VALUE! M-053
#VALUE! M-051

#VALUE! L-12
#VALUE! L-10
#VALUE! L-13
#VALUE! L-13

#VALUE! P&M-002
#VALUE! P&M-080
#VALUE! P&M-017

#VALUE! P&M-049
#VALUE! Lead =input
km & P&M-
050
#VALUE! P&M-007
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! M-081
#VALUE! M-005
#VALUE! M-053
#VALUE! M-051

#VALUE! L-12
#VALUE! L-10
#VALUE! L-13
#VALUE! L-13

#VALUE! P&M-009
#VALUE! P&M-079
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE! M-081
#VALUE! M-004
#VALUE! M-053
#VALUE! M-051

#VALUE! L-12
#VALUE! L-10
#VALUE! L-13
#VALUE! L-13

#VALUE! P&M-002
#VALUE! P&M-018
#VALUE! P&M-017

#VALUE! P&M-049
#VALUE! Lead =input
km & P&M-
050
#VALUE! P&M-007
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! M-081
#VALUE! M-005
#VALUE! M-053
#VALUE! M-051

#VALUE! L-12
#VALUE! L-10
#VALUE! L-13
#VALUE! L-13

#VALUE! P&M-009
#VALUE! P&M-079
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! M-081
#VALUE! M-004
#VALUE! M-053
#VALUE! M-051

#VALUE! L-12
#VALUE! L-10
#VALUE! L-13
#VALUE! L-13

#VALUE! P&M-002
#VALUE! P&M-080
#VALUE! P&M-017

#VALUE! P&M-049
#VALUE! Lead =input
km & P&M-
050
#VALUE! P&M-007
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! M-081
#VALUE! M-005
#VALUE! M-053
#VALUE! M-051

#VALUE! L-12
#VALUE! L-10
#VALUE! L-13
#VALUE! L-13

#VALUE! P&M-009
#VALUE! P&M-079
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE! M-081
#VALUE! M-004
#VALUE! M-053
#VALUE! M-051

#VALUE! L-12
#VALUE! L-10
#VALUE! L-13
#VALUE! L-13

#VALUE! P&M-002
#VALUE! P&M-018
#VALUE! P&M-017

#VALUE! P&M-049
#VALUE! Lead =input
km & P&M-
050
#VALUE! P&M-007
#VALUE!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!