Daily Report

Project Name: KBK Project


Project Code: 03 YG 00400 Report Date : 30-Jul-2017 Sunday No. of Day 730 Report No. DPR-424
Project Start Date 2015-8-1 Contract Period 458 Calendar Day AM PM Fine
Weather
Estimate Completion Date 2016-10-31 Remain Period (272) Calendar Day 6~8 8~10 10 ~12 13~15 15~17 17~19 Rain
Work Force
M&E Site Office General Crane Crane
Trades PM PE SAE Site Engr QA/QC QS Admin Safety Security Surveyor Geotech Welder Steel Worker
engineer Store Staff Workers Operator Helper
Today 1 1 1 6 7
Operator Helper Manson Steel
Trades M&E Manson Carpenter Smith Stud Bolt Total
(ACP) (ACP) worker Supervisior
Today 1 7 24
Machine & Equipments onsite
Description previous Today Cum. Remarks Description previous Today Cum. Remarks Description previous Today Cum. Remarks
25 Ton Crane 0 0 0 1.5 Hp Submer; pump 4 4 4 19KW Welding Box 6 6 6
Sheet pile machine 0 0 0 1 Hp Motor pump 1 1 1 60 KVA generator 1 1 1
3"x3" Air Compressor 1 1 1 1.5 Hp Motor pump 1 1 1 2Hp compressor 1 1 1
165 KVA Generator 1 1 1 2Hp Pressure pump 1 1 1
Material Delivery On Site
Quantity Quantity Quantity
Description Unit Description Unit Description Unit Remarks
Today Total Today Total Today Total
1 1/2" MS pipe , 6m No 100 100
360 GI pipe clip No 960 960
360 M.S pipe clip No 40 40

FO-OP-01 REV-00 Page: 1/2


Daily Report

Project Name: KBK Project


QC - Test Sampling
Item Remarks
Test
Sample
Taken

LTI Free Day UA,UC Near Miss FAI MTC LTA


Daily TBT
HSE Conducted By
Safety Officer

Works Carried out Details


Trades Of Work Location Remark

1 Secondary beam installation work at riser opening area , 3rd floor At grid (D-E)

2 Tie beam level change and install at passenger lift pit area , 3rd floor At grid (B-C)

3 Rebar fabricate , straight and install for 5th floor slab At grid (B-E)

4 Weld angle iron for perimeter slab at 6th and 5th floor At grid (1) &

5 Weld column joint at 5th floor At grid (A)

Special Event
Site
Visitors
Purpose Instructio
on site
n
Project Manager Project Engineer Prepare By: Site Engineer
Name U Khin Maung Myint Name Name Aye Wit Yee Soe
Signature Signature Signature

FO-OP-01 REV-00 Page: 2/2


KBK Project
Site Progress Photo
Date: 30.7.2017

Rebar fabrication and installation work at 5th floor slab

Insert H-beam for riser opening area


Welding work at column joint at 5th floor

Welding angle iron at 6th floor perimeter