Professional Documents
Culture Documents
1 Secondary beam installation work at riser opening area , 3rd floor At grid (D-E)
2 Tie beam level change and install at passenger lift pit area , 3rd floor At grid (B-C)
3 Rebar fabricate , straight and install for 5th floor slab At grid (B-E)
4 Weld angle iron for perimeter slab at 6th and 5th floor At grid (1) &