PROJECT 613-PROPOSED ELECTRONIC SECURITY SYSTEMS BUILDING

PLOT NO Plot No. 2641019


LOCATION Muhaisanah Second, DUBAI
MAIN CONTRACTOR
CONSULTANT BEL YOAHAH
CLIENT DUBAI POLICE HEAD QUARTERS
AREA
SUMMARY
Sl. Description Material Cost Material Cost @ 1.65 %
1 HVAC 6,704,918 11,063,114 73%
2 Fire Protection 1,398,090 2,306,849 15%
3 Drainage 288,430 475,909 3%
4 Water supply 773,077 1,275,577 8%
5 LPG N/A
6 BMS
TOTAL MATERIAL COST 9,164,515 15,121,449
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEM
LOCATION: Plot No. 2641019, Muhaisanah Second
CONSULTANT: BEL YOAHAH
HVAC
S.No Description Te
1 CHILLER Specifications Vendors list KW
R-134 a COI- Trane/
Air cooled screw chiller with CPM France/Italy
Single skin, 1 York/Carrier
mm GI casing,
Controls for Chiller Horizontal
base factory
Thermostat for FCU's installed GI
steel plenum
section & Euroclima/Mekar-
2 FAN COIL UNITS washable
filter. 13 mm Italy
Foam CC PU
DX units foam blankert. O general
Drain pan-GI,
shudbe
insulated
foiled PU
Euroclima/Trosten KW
3 FAHU With HRW & HP - 2 No's - 230 TR /Mekar
FAHU -1 - SA - 4615 L/S & EA - 3455 L/S (50TR) 175.15
FAHU -2- SA - 6875 L/S & EA - 5835 L/S (67 TR) 240.97
FAHU With HP& Cooling Coil - 01 nos
HVAC
S.No Description Te
FAHU -3- SA - 900 L/S & EA - 800 L/S (8.4 TR) Contractor to 29.58
Controls, VFD for 1 FAHU provide fan Pa
as per site
requirement
4 AHU"s for approval.
AHU-01 Units to be 52.5
mounted on
AHU-02 Steel spring
57.9
AHU-03 Vib isolatr 31.2
AHU-04 26
AHU-05 43.9
AHU-06 61.3
AHU-14 with VFD 31.2
AHU-15 49.3

Controls, VFD for 1 AHU

5 CLOSED CONTROL UNITS Air dale/Stulz


CCU-1 Server Room 10
CCU-2 Server Room 13

6 CHW Pump - KW
HVAC
S.No Description Te

PCHWP -01 TO 4 - constant speed - 30.71 l/s @ 150 Kpa - 1.5 SPP/ B& G
Bar - ( 3 Duty & 1 Stand By) /Flowserve

SCHWP -01 TO 4 - With VFD - 30.71 l/s @ 400 Kpa - 4.0 Bar ( 3
Duty & 1 Stand By)

7 CHW Chemical Dosing Unit KW


Ground
Chemical Dosing Unit ( 1 No Automatic, 1 No Manual )

8 CHW Pressurization Unit KW


Ground
PF 1 -Pressurization Unit ( 1 No Duty, 1 No Stand By)

9 CHW - Air Seperator KW


Ground
AS - 1
HVAC
S.No Description Te
10 Fans - 11 No's
Corridor Smoke Extract Fan ( Inline Ducted) 2 hrs Fire rated
CSEF-01
Weatherproof
CSEF-02 housing of Al
CSEF-03 & 100 %
CSEF-04 gasket panel
CSEF-05 to permit
access to
CSEF-06 interior. Anti
Corridor Smoke Make up air fan-(Inline ducted) 2 hrs Fire rated corr
CSVF-01 protection to
be provided
CSVF-02
CSVF-03

Staircase Pressurization fan (Axial)


SVF-01
SVF-02

Exhaust Fan ( Inline Ducted)


EXF-01
EXF-02
EXF-04
EXF-05
HVAC
S.No Description Te
EXF-06
EXF-07
EXF-08

Fans - Control Panel, VFD

11 ESP - Electro Static Precipator


ESP - 1 -500 l/s 550 mmx250 mm Trion/purified
air/Envitech

12 Ducting GI as per DW Jindal/Hadeed/Nis


Supply Air Duct with Fibre Glass insulation, canvas cloth & 144 stds hin
Foster
Return Air Duct with Fibre Glass insulation, canvas cloth &
Foster
Fresh Air Duct with Fibre Glass insulation, canvas cloth & Foster
Exhaust Air Duct with Fibre Glass insulation, canvas cloth &
Foster

GI Fire rated Ducting


Corridor Smoke Extract Duct
Corridor Make up air Duct
Smoke extract Duct
Staircase Pressurization Duct

Aluminium Cladding
HVAC
S.No Description Te
Ducting
Piping
Acoustic Lining

VAV Box

13 Air Outlets
SAD - Supply Air Diffuser

RAD - Return Air Diffuser


HVAC
S.No Description Te
SLD-Supply air slot Diffuser
3 Slot 1100 mm
3 Slot 1000 mm
3 Slot 1300 mm
3 Slot 4300 mm
3 Slot 1200 mm

RLD-Return air slot Diffuser


3 Slot 1100 mm
3 Slot 1300 mm
3 Slot 4300 mm

EAD-Exhast Air Diffuser

SAG - Supply Air Grill


HVAC
S.No Description Te

FAG-Fresh Air Grill with Wire mesh & Bell mouth

RAG-Return air Grill

EAG-Exhaust air Grill with Bellmouth & Wiremesh


HVAC
S.No Description Te
Fexible Duct

Hangers & supports

14 Dampers
VCD
HVAC
S.No Description Te

FD
HVAC
S.No Description Te
MSFD

NRD
HVAC
S.No Description Te
15 SA - Sound Attenuator

16 Louvers
EAL - Exhaust Air Louver

FAL - Fresh Air Louver

SMEL-Smoke Exhaust Louver


HVAC
S.No Description Te

17 CO Sensor
Control Panel

CO2 Sensor

18 CHW Pipe - Supply Sch 40 Black


( Black Steel Schedule 40) Steel
HVAC
S.No Description Te

CHW Pipe - Return


( Black Steel Schedule 40)

70% Fittings
HVAC
S.No Description Te
CHW Pipe Insulation - Supply Fibre Glass
19 insulation

CHW Pipe Insulation - Return


HVAC
S.No Description Te

50% Fittings

20 CHW Valve Packages


FCU Valve Package
PICV & Dielectric union

For AHU & FAHU


HVAC
S.No Description Te
CHW Primary Pump ( 3 Duty & 1 Stand By )
CHW Secondary Pump ( 3 Duty & 1 Stand By )
CHW Chemical Dosing& Pressurization unit
CHILLER

20 CHW Riser Valves


IV - Isolating Valve Econosto
T&A

DRV - Double Regulating Valve

21 Refrigerant Copper Piping - Average Size Consider


Vapour 5/8" & Liquid 1 1/8"
Indoor - Copper Pipe, Insulation
HVAC
S.No Description Te

22 Testing & Commissioning

HVAC- Total Material Cost

HVAC- Total Material Cost @ 1.65


C SECURIY SYSTEMS BUILDING
uhaisanah Second, DUBAI
L YOAHAH
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
TR L/S CFM Total Tr

203.5 3 No's 305,250.00 915,750.00

50,000.00

136 No's 250.00 34,000.00

328 136 No's 2,500.00 340,000.00

23.5 10 No's 63,000.00

TR L/S CFM Total Tr


50 4,615 9,779 1 No's 200,000.00 200,000.00
69 6,875 14,568 1 No's 250,000.00 250,000.00
Item 50,000.00
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
8 900 1,907 8.43 1 No's 60,000.00 60,000.00

15 3733 7910 1 No's 65,000.00 65,000.00


17 4147 8787 1 No's 70,000.00 70,000.00
9 2201 4664 1 No's 40,000.00 40,000.00
7 1972 4179 1 No's 35,000.00 35,000.00
13 2728 5781 1 No's 48,000.00 48,000.00
17 3665 7766 1 No's 63,000.00 63,000.00
9 1972 4179 1 No's 35,000.00 35,000.00
14 2993 6342 1 No's 50,000.00 50,000.00

1 Item 45,000.00

2.85 1176 335


3.71 1534 437 1 No's 140,000.00 140,000.00
1 No's 180,000.00 180,000.00
TR L/S CFM Total Tr
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED

4 No's 27,500.00 110,000.00

4 No's 27,500.00 110,000.00

TR L/S CFM Total Tr

1 SET 20,000.00 20,000.00

TR L/S CFM Total Tr

1 SET 15,000.00 15,000.00

TR L/S GPM Total Tr

1 SET 20,000.00 20,000.00


Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED

1100 2,331 1 No's 9,500.00 9,500.00


1900 4,026 1 No's 12,000.00 12,000.00
1550 3,284 1 No's 11,000.00 11,000.00
4000 8,476 1 No's 12,000.00 12,000.00
4000 8,476 1 No's 12,000.00 12,000.00
750 1,589 1 No's 8,000.00 8,000.00
-
3250 6,887 1 No's 9,000.00 9,000.00
3250 6,887 1 No's 9,000.00 9,000.00
500 1,060 1 No's 8,000.00 8,000.00

7000 14,833 1 No's 15,000.00 15,000.00


900 1,907 1 No's 8,000.00 8,000.00

150 318 1 No's 1,500.00 1,500.00


100 212 1 No's 1,200.00 1,200.00
75 159 1 No's 1,000.00 1,000.00
50 106 1 No's 1,000.00 1,000.00
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
50 106 1 No's 1,000.00 1,000.00
75 159 1 No's 1,000.00 1,000.00
150 318 1 No's 1,500.00 1,500.00

1 Lot 50,000.00 50,000.00

1 No's 35,000.00 35,000.00

4674 Sq.M 130.00 607,675.50


352 Sq.M 130.00 45,799.33
2010 Sq.M 130.00 261,361.39
1672 Sq.M 150.00 250,852.80

607 Sq.M 200.00 121,473.44


292 Sq.M 200.00 58,424.96
216 Sq.M 200.00 43,107.46
133 Sq.M 16.00 2,123.72
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
1463 Sq.M 130.00 190,134.37
600 Sq.M 130.00 78,000.00

400x250 4 No's 4,000.00 16,000.00


700x400 2 No's 4,000.00 8,000.00

Size in MM
150 x 150 2 No's 50.00 100.00
225 x 225 13 No's 60.00 780.00
250X100 1 No's 60.00 60.00
300 x 300 57 No's 80.00 4,560.00
350X350 3 No's 100.00 300.00
450X450 78 No's 100.00 7,800.00
-
225 x 225 12 No's 45.00 540.00
300 x 300 53 No's 55.00 2,915.00
350X350 3 No's 75.00 225.00
450X450 120 No's 100.00 12,000.00
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
20 No's 110.00 2,200.00
28 No's 100.00 2,800.00
8 No's 110.00 880.00
1 No's 320.00 320.00
4 No's 110.00 440.00

4 No's 100.00 400.00


2 No's 100.00 200.00
4 No's 300.00 1,200.00

150x150 75 No's 30.00 2,250.00

200 x 150 1 No's 40.00 40.00


250 x 150 4 No's 40.00 160.00
300 x 150 5 No's 50.00 250.00
300 x 200 4 No's 50.00 200.00
400 x 150 4 No's 60.00 240.00
400 x 200 5 No's 65.00 325.00
550x300 1 No's 80.00 80.00
800x100 72 No's 180.00 12,960.00
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
1100x100 99 No's 220.00 21,780.00
1500x100 9 No's 250.00 2,250.00
-
200 x 150 26 No's 30.00 780.00
250 x 150 12 No's 30.00 360.00
250 x 200 6 No's 30.00 180.00
300 x 200 30 No's 35.00 1,050.00
300 x 250 6 No's 35.00 210.00
350 x 250 3 No's 35.00 105.00
400 x 250 2 No's 45.00 90.00
450 x 250 2 No's 45.00 90.00
500 x 250 2 No's 60.00 120.00
-
400x100 4 No's 40.00 160.00
450x450 12 No's 40.00 480.00
500x750 1 No's 55.00 55.00
800x100 72 No's 80.00 5,760.00
1100x100 79 No's 120.00 9,480.00
1500x100 3 No's 180.00 540.00

200x150 11 No's 30.00 330.00


Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
200 mm dia 172 No's 40.00 6,880.00

1 Item 250,000.00
-
Dia 200 122 No's 30.00
150 x 100 122 No's 40.00 4,880.00
250 x 150 28 No's 50.00 1,400.00
250 x 200 6 No's 55.00 330.00
300 x 200 18 No's 70.00 1,260.00
300 x 250 12 No's 70.00 840.00
350 x 250 19 No's 70.00 1,330.00
400 x 200 46 No's 80.00 3,680.00
400 x 250 14 No's 80.00 1,120.00
450 x 250 3 No's 80.00 240.00
500 x 250 120 No's 120.00 14,400.00
500 x 300 2 No's 120.00 240.00
550 x 350 17 No's 120.00 2,040.00
600x300 7 No's 140.00 980.00
650x300 4 No's 140.00 560.00
650x350 2 No's 140.00 280.00
700x350 1 No's 160.00 160.00
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
700x400 3 No's 160.00 480.00
700x350 1 No's 160.00 160.00
750x500 1 No's 160.00 160.00
900 x 500 1 No's 250.00 250.00
1000 x 550 1 No's 300.00 300.00
1100 x 500 1 No's 320.00 320.00
1650 x 500 1 No's 550.00 550.00
1900x500 1 No's 600.00 600.00
-
200 x 150 41 No's 100.00 4,100.00
300 x 200 18 No's 100.00 1,800.00
300 x 250 13 No's 100.00 1,300.00
400 x 200 48 No's 120.00 5,760.00
400 x 250 1 No's 120.00 120.00
500 x 300 9 No's 150.00 1,350.00
600x550 7 No's 180.00 1,260.00
750x450 3 No's 180.00 540.00
800 x 450 3 No's 200.00 600.00
900 x500 2 No's 320.00 640.00
1000 x 550 5 No's 350.00 1,750.00
1400x650 8 No's 380.00 3,040.00
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
350x200 1 No's 100.00 100.00
400x250 4 No's 120.00 480.00
450x250 1 No's 120.00 120.00
500x250 8 No's 180.00 1,440.00
550x250 4 No's 180.00 720.00
500x400 5 No's 180.00 900.00
600x250 1 No's 200.00 200.00
650x350 1 No's 200.00 200.00
700x350 4 No's 200.00 800.00
700x400 4 No's 200.00 800.00
900 x 350 1 No's 1,200.00 1,200.00
900 x 500 2 No's 1,500.00 3,000.00
950x950 1 No's 1,500.00 1,500.00
1150x500 3 No's 1,800.00 5,400.00
-
500x400 1 No's 400.00 400.00
650x350 1 No's 700.00 700.00
900x500 1 No's 900.00 900.00
1150x500 1 No's 700.00 700.00
1200x550 2 No's 700.00 1,400.00

-
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
2100X500 1 No's 2,500.00 2,500.00
1200X500 1 No's 1,800.00 1,800.00
1500X800 1 No's 1,800.00 1,800.00
600X300 5 No's 1,000.00 5,000.00
-
-
250x250 11 No's 80.00 880.00
2100X500 1 No's 2,300.00 2,300.00
1200X500 1 No's 1,100.00 1,100.00
1500X800 1 No's 1,300.00 1,300.00

2100X500 1 No's 5,200.00 5,200.00


1200X500 1 No's 2,700.00 2,700.00
1500X800 1 No's 2,800.00 2,800.00

200x1400 1 No's 1,600.00 1,600.00


500x500 1 No's 1,000.00 1,000.00
750x750 1 No's 1,300.00 1,300.00
950x950 1 No's 1,500.00 1,500.00
1000x750 1 No's 3,000.00 3,000.00
1200x700 1 No's 1,300.00 1,300.00
2000x1000 2 No's 2,500.00 5,000.00
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
2100x1000 2 No's 2,600.00 5,200.00

1 No's 800.00 800.00


1 Lot 500.00 500.00

1 No's 1,000.00 1,000.00

15 mm 29 Rmt
20 mm 131 Rmt 14.00 1,827.83
25 mm 388 Rmt 20.00 7,757.42
32 mm 711 Rmt 26.00 18,485.90
40 mm 392 Rmt 30.00 11,760.21
50 mm 277 Rmt 40.00 11,093.72
65 mm 209 Rmt 80.00 16,713.84
80 mm 10 Rmt 115.00 1,203.02
100 mm 96 Rmt 155.00 14,937.51
125 mm 52 Rmt 200.00 10,381.80
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
150 mm 85 Rmt 300.00 25,538.70
200 mm 142 Rmt 450.00 63,800.55

15 mm 29 Rmt
20 mm 131 Rmt 14.00 1,827.83
25 mm 388 Rmt 20.00 7,757.42
32 mm 711 Rmt 26.00 18,485.90
40 mm 392 Rmt 30.00 11,760.21
50 mm 277 Rmt 40.00 11,093.72
65 mm 209 Rmt 80.00 16,713.84
80 mm 10 Rmt 115.00 1,203.02
100 mm 96 Rmt 155.00 14,937.51
125 mm 52 Rmt 200.00 10,381.80
150 mm 85 Rmt 300.00 25,538.70
200 mm 142 Rmt 450.00 63,800.55
Item 119,699.93
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
15 mm 29 Rmt 4.00
20 mm 131 Rmt 4.00 522.24
25 mm 388 Rmt 5.00 1,939.36
32 mm 711 Rmt 5.00 3,554.98
40 mm 392 Rmt 6.00 2,352.04
50 mm 277 Rmt 7.00 1,941.40
65 mm 209 Rmt 10.00 2,089.23
80 mm 10 Rmt 13.00 135.99
100 mm 96 Rmt 20.00 1,927.42
125 mm 52 Rmt 30.00 1,557.27
150 mm 85 Rmt 35.00 2,979.52
200 mm 142 Rmt 45.00 6,380.06
164,000.00

15 mm 29 Rmt 4.00
20 mm 131 Rmt 4.00 522.24
25 mm 388 Rmt 5.00 1,939.36
32 mm 711 Rmt 5.00 3,554.98
40 mm 392 Rmt 6.00 2,352.04
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
50 mm 277 Rmt 7.00 1,941.40
65 mm 209 Rmt 10.00 2,089.23
80 mm 10 Rmt 13.00 135.99
100 mm 96 Rmt 20.00 1,927.42
125 mm 52 Rmt 30.00 1,557.27
150 mm 85 Rmt 35.00 2,979.52
200 mm 142 Rmt 45.00 6,380.06
105,000.00

-
15 mm 6 No's 600.00 3,600.00
20 mm 8 No's 700.00 5,600.00
25 mm 49 No's 800.00 39,200.00
32 mm 72 No's 1,200.00 86,400.00
40 mm 2 No's 1,500.00 3,000.00

50 mm 3 No's 4,500.00 13,500.00


65 mm 7 No's 5,000.00 35,000.00
100 mm 1 No's 13,500.00 13,500.00
Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
150 mm 4 SET 13,500.00 54,000.00
150 mm 4 SET 13,500.00 54,000.00
80 mm 1 SET 5,000.00 5,000.00
200 mm 3 SET 14,000.00 42,000.00

-
40 mm 1 No's 100.00 100.00
50 mm 1 No's 140.00 140.00
65 mm 9 No's 200.00 1,800.00
100 mm 1 No's 300.00 300.00

20 mm No's 120.00 -
40 mm 1 No's 180.00 180.00
50 mm 1 No's 350.00 350.00
65 mm 9 No's 400.00 3,600.00
100 mm 1 No's 1,000.00 1,000.00

50 Rmt 70.00 3,500.00


Unit Rate in Total Amount in
Technical Data's Qty Unit AED AED
1 Item 150,000.00

Total Material Dry


Cost in AED 6,704,917.85

OH @1.65 11,063,114.46
Equipment Schedule (Chilled Water FCU)
Floor FCU nos QTY TKW per Unit TR per Unit Total TKW Total TR
GROUND FLOOR Round off
1 1 7.5 2.1 2.14 2.14 2
2 1 4.3 1.2 1.23 1.23 1.5
3 1 2.7 0.8 0.77 0.77 1
4 1 0.6 0.2 0.17 0.17 0.5
5 1 0.5 0.1 0.14 0.14 0.5
6 1 1.3 0.4 0.37 0.37 0.5
7 1 1.3 0.4 0.37 0.37 0.5
8 1 10.2 2.9 2.91 2.91 3
9 1 10.2 2.9 2.91 2.91 3
10 1 5.2 1.5 1.48 1.48 1.5
11 1 0.5 0.1 0.14 0.14 0.5
FIRST FLOOR - - -
Office-01 1 1 9.22 2.6 2.63 2.63 3
Office-01 2 1 9.22 2.6 2.63 2.63 3
Office-01 3 1 9.22 2.6 2.63 2.63 3
Office-01 4 1 9.22 2.6 2.63 2.63 3
Office-01 5 1 9.22 2.6 2.63 2.63 3
Office-01 6 1 9.22 2.6 2.63 2.63 3
Office-01 7 1 9.22 2.6 2.63 2.63 3
Office-01 8 1 9.22 2.6 2.63 2.63 3
Office-01 9 1 9.22 2.6 2.63 2.63 3
Meeting Room 10 1 3.2 0.9 0.91 0.91 1
Meeting Room 11 1 3.8 1.1 1.08 1.08 1
DD office 12 1 8.8 2.5 2.51 2.51 3
Manager office 13 1 6.6 1.9 1.88 1.88 2
Manager office 14 1 6.6 1.9 1.88 1.88 2
Atrium corridor 15 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 16 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 17 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 18 1 7.48 2.1 2.13 2.13 2.5
Corr 19 1 10.1 2.9 2.88 2.88 3
Office-03 20 1 7.4 2.1 2.11 2.11 2.5
Secretary 21 1 4.6 1.3 1.31 1.31 1.5
Office-02 22 1 8 2.3 2.28 2.28 2.5
Office-02 23 1 8 2.3 2.28 2.28 2.5
Office-02 24 1 8 2.3 2.28 2.28 2.5
Office-02 25 1 8 2.3 2.28 2.28 2.5
Office-02 26 1 8 2.3 2.28 2.28 2.5
Office-02 27 1 8 2.3 2.28 2.28 2.5
Gents Lounge 28 1 6 1.7 1.71 1.71 2
Gents Lounge 29 1 6 1.7 1.71 1.71 2
prayer 30 1 8 2.3 2.28 2.28 2.5
toilets 31 1 8.7 2.5 2.48 2.48 2.5
- - -
SECOND FLOOR - - -
Office-01 1 1 9.22 2.6 2.63 2.63 3
Office-01 2 1 9.22 2.6 2.63 2.63 3
Office-01 3 1 9.22 2.6 2.63 2.63 3
Office-01 4 1 9.22 2.6 2.63 2.63 3
Office-01 5 1 9.22 2.6 2.63 2.63 3
Office-01 6 1 9.22 2.6 2.63 2.63 3
Office-01 7 1 9.22 2.6 2.63 2.63 3
Office-01 8 1 9.22 2.6 2.63 2.63 3
Office-01 9 1 9.22 2.6 2.63 2.63 3
Meeting Room 10 1 3.2 0.9 0.91 0.91 1
Meeting Room 11 1 3.8 1.1 1.08 1.08 1
DD office 12 1 8.8 2.5 2.51 2.51 3
Manager office 13 1 6.6 1.9 1.88 1.88 2
Manager office 14 1 6.6 1.9 1.88 1.88 2
Atrium corridor 15 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 16 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 17 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 18 1 7.48 2.1 2.13 2.13 2.5
Corr 19 1 10.1 2.9 2.88 2.88 3
Lift Lobby 20 1 4.9 1.4 1.40 1.40 1.5
Secretary 21 1 7.9 2.3 2.25 2.25 2.5
Office-02 22 1 8 2.3 2.28 2.28 2.5
Office-02 23 1 8 2.3 2.28 2.28 2.5
Office-02 24 1 8 2.3 2.28 2.28 2.5
Office-02 25 1 8 2.3 2.28 2.28 2.5
Office-02 26 1 8 2.3 2.28 2.28 2.5
Office-02 27 1 8 2.3 2.28 2.28 2.5
Gents Lounge 28 1 6 1.7 1.71 1.71 2
Gents Lounge 29 1 6 1.7 1.71 1.71 2
prayer 30 1 8 2.3 2.28 2.28 3
toilets 31 1 8.7 2.5 2.48 2.48 3
- - -
THIRD FLOOR - - -
Office-01 1 1 9.22 2.6 2.63 2.63 3
Office-01 2 1 9.22 2.6 2.63 2.63 3
Office-01 3 1 9.22 2.6 2.63 2.63 3
Office-01 4 1 9.22 2.6 2.63 2.63 3
Office-01 5 1 9.22 2.6 2.63 2.63 3
Office-01 6 1 9.22 2.6 2.63 2.63 3
Office-01 7 1 9.22 2.6 2.63 2.63 3
Office-01 8 1 9.22 2.6 2.63 2.63 3
Office-01 9 1 9.22 2.6 2.63 2.63 3
Meeting Room 10 1 3.2 0.9 0.91 0.91 1
Meeting Room 11 1 3.8 1.1 1.08 1.08 1
DD office 12 1 8.8 2.5 2.51 2.51 3
Manager office 13 1 6.6 1.9 1.88 1.88 2
Manager office 14 1 6.6 1.9 1.88 1.88 2
Atrium corridor 15 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 16 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 17 1 7.48 2.1 2.13 2.13 2.5
Atrium corridor 18 1 7.48 2.1 2.13 2.13 2.5
Corr 19 1 10.1 2.9 2.88 2.88 3
lift lobby 20 1 4.9 1.4 1.40 1.40 1.5
Secretary 21 1 7.9 2.3 2.25 2.25 2.5
Office-02 22 1 8 2.3 2.28 2.28 2.5
Office-02 23 1 8 2.3 2.28 2.28 2.5
Office-02 24 1 8 2.3 2.28 2.28 2.5
Office-02 25 1 8 2.3 2.28 2.28 2.5
Office-02 26 1 8 2.3 2.28 2.28 2.5
Office-02 27 1 8 2.3 2.28 2.28 2.5
Gents Lounge 28 1 6 1.7 1.71 1.71 2
Gents Lounge 29 1 6 1.7 1.71 1.71 2
prayer 30 1 8 2.3 2.28 2.28 3
toilets 31 1 8.7 2.5 2.48 2.48 3
- - -
FOURTH FLOOR - - -
Office-01 1 1 10.01 2.9 2.85 2.85 3
Office-01 2 1 10.01 2.9 2.85 2.85 3
Office-01 3 1 10.01 2.9 2.85 2.85 3
Office-01 4 1 10.01 2.9 2.85 2.85 3
Office-01 5 1 10.01 2.9 2.85 2.85 3
Office-01 6 1 10.01 2.9 2.85 2.85 3
Office-01 7 1 10.01 2.9 2.85 2.85 3
Office-01 8 1 10.01 2.9 2.85 2.85 3
Office-01 9 1 10.01 2.9 2.85 2.85 3
Meeting Room 10 1 2.3 0.7 0.66 0.66 1
Meeting Room 11 1 3.9 1.1 1.11 1.11 1
Stationary 12 1 1.2 0.3 0.34 0.34 0.5
Manager office 13 1 8.4 2.4 2.39 2.39 3
Manager office 14 1 9.35 2.7 2.66 2.66 3
Manager office 14 1 9.35 2.7 2.66 2.66 3
Atrium corridor 15 1 6.9 2.0 1.97 1.97 2.5
Atrium corridor 16 1 6.9 2.0 1.97 1.97 2.5
Atrium corridor 17 1 6.9 2.0 1.97 1.97 2.5
Atrium corridor 18 1 6.9 2.0 1.97 1.97 2
Corr 19 1 10.6 3.0 3.02 3.02 3.5
lift lobby 20 1 5.3 1.5 1.51 1.51 2
Secretary 21 1 5.3 1.5 1.51 1.51 2
Office-02 22 1 8.63 2.5 2.46 2.46 2.5
Office-02 23 1 8.63 2.5 2.46 2.46 2.5
Office-02 24 1 8.63 2.5 2.46 2.46 2.5
Office-02 25 1 8.63 2.5 2.46 2.46 2.5
Office-02 26 1 8.63 2.5 2.46 2.46 2.5
Office-02 27 1 8.63 2.5 2.46 2.46 2.5
Gents Lounge 28 1 6.15 1.8 1.75 1.75 2
Gents Lounge 29 1 6.15 1.8 1.75 1.75 2
prayer 30 1 8.3 2.4 2.37 2.37 3
toilets 31 1 9.2 2.6 2.62 2.62 3

TOTAL 136 1022.97 291.5 291.55 291.55 328

Equipment Schedule (DX units)


Floor FCU nos QTY TKW per Unit TR per Unit Total TKW Total TR Round off
GF 1 1 3 0.9 3 0.86 1
2 1 1.9 0.5 1.9 0.54 1
- -
FF 1 1 9.65 2.8 9.65 2.75 3
2 1 9.65 2.8 9.65 2.75 3
3 1 1.8 0.5 1.8 0.51 1
4 1 3.9 1.1 3.9 1.11 1.5
SERVICE BLOCK - -
1 1 5.8 1.7 5.8 1.65 2
2 1 5.8 1.7 5.8 1.65 2
3 1 6.9 2.0 6.9 1.97 2
4 1 7.5 2.1 7.5 2.14 2.5
5 1 5.1 1.5 5.1 1.45 2
6 1 4.8 1.4 4.8 1.37 1.5

TOTAL 10 60.9 17.4 60.9 17.36 22.5


2,500.00
3,000.00
3,000.00
3,000.00
-
9,000.00
9,000.00
3,000.00
4,500.00
-
6,000.00
6,000.00
6,000.00
7,500.00
6,000.00
4,500.00

67,500.00
TENDER NO. 613
PROJECT Proposed ELECTRONIC Security Sytems Building
LOCATION Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT BEL YOAHAH
CLIENT Dubai Head Quarters
Sl. No. A HVAC SYSTEM CAPACITY
1 Air Cooled Srew Chillers 203.50 TR
2 CHWPP-constant 30.71 l/s @ 1450 rpm
3 CHWSP-VFD 30.71 l/s @ 1450 rpm
4 FAHU-1 with HRW & HP S-4615 L/S & 3455 L/S
5 FAHU-2 with HRW & HP S-6875 L/S & 5835 L/S
6 FAHU-3 with HRW & HP S-900 L/S & 800 L/S
7 G-01-AHU 3733 L/S
8 G-02-AHU 4147 l/s
9 G-03-AHU 2201 l/s
10 G-04-AHU 1972 l/s
11 G-05-AHU 2728 l/s
12 G-06-AHU 3865 l/s
13 G-14-AHU 1972 l/s
14 G-15-AHU 2993 l/s
15 Chilled water FCU 546 TR
16 DX Units 20 TR
17 Closed Control units
18 CCU-01 10 KW
19 CCU-02 13 KW
20 CSEF-01 1100 l/s
21 CSEF-02 1900 l/s
22 CSEF-03 1550 l/s
23 CSEF-04 & 05 4000 l/s
24 CSEF-06 750l/s
25 CSVF 01 & 02 3250 l/s
26 CSVF 03 500 l/s
27 SVF-01 7000 l/s
28 SVF-02 900 l/s
29 EXF-01 150 l/s
30 EXF-02 100 l/s
31 EXF-04 75 l/s
32 EXF-05 50 l/s
33 EXF-06 50 l/s
34 EXF-07 75 l/s
35 EXF-08 150 l/s
B WATER SUPPLY & DRAINAGE
1 Water Tank 6000 Gallon
2 Solar Panel
3 Solar system circulation pumps (1D+1S)
4 solar Hot water storage tank 2000 ltr
5 BP 01 with pressure vessel 250 ltr 7 l/s @ 2.5 Bar
6 GRP hot pressed insulted tank (8x7x1.5) 70 m3
7 Hot water circulation pump set 2 l/s @1.5 bar
8
PHE- 40 kw chilled water system HE with
recirculation pumps
9 Transfer pump 6.5 l/s @ 500 Kpa
10 Booster pump-roof 7 l/s @ 250 Kpa
11 Booster pump - GR fire pump 1.8 l/s @ 250 Kpa
12 Irrigation booster pump 3 l/s @ 500 Kpa
13 Sump pump 2 l/s @ 200 Kpa
14
Hot water circulation pump (125 deg C rated) 2 l/s @150 Kpa

C DRAINAGE
1 Schedule of Manholes
D FIRE FIGHTING
1 Electric Driven pump 1000 GPM @ 11.5 Bar
2 Diesel Driven pump 1000 GPM @ 11.5 Bar
3 Jockey pumpset 25 GPM @ 11.5 Bar

E LPG SYSTEM N/A

F BMS- ALL equipments with FCU interfacing


QTY
3
3D+1S
3D+1S
1
1
1
1
1
1
1
1
1
1
1
136
12

2
1
1
1
1
2
1
2
1
1
1
1
2
1
2
1
2
1
1
16
1
2
1D+1S
1
1D+1S

1
1D+1S
1D+1S VFD
1D+1S
1D+1S
1D+1S

1D+1S

37

1
1
1
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING

LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI

CONSULTANT: BEL YOAHAH

CLIENT: DUBAI POLICE HEADQUARTERS

Fire Fighting Quantity

SL. No. Description SIZE

Fire Pump - Vertical Turbine Pump set

Electric Pump 1000 gpm @ 11.5 Bar

Diesel Pump 1000 gpm @ 11.5 Bar

Jockey pump 25 GPM @ 11.5 Bar

1 Sprinklers
Recessed pendant sprinkler head
Upright Sprinkler Head
Upright & Pendant sprinkler Head
Concealed Sprinkler Head
Side Wall Sprinkler Head
2 Fire Fighting Equipments
5 kg - CO2 Fire Extinguisher
6 KG - Dry Powder Fire Extinguisher
3 Valves
OS & Y Gate Valve 200 dia
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING

LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI

CONSULTANT: BEL YOAHAH

CLIENT: DUBAI POLICE HEADQUARTERS

Fire Fighting Quantity

SL. No. Description SIZE

Test Line Flow Meter 150 dia


PRV - Pressure Release Valve 200 dia
AAV - Automatic Air Release Valve 25 dia
ACV - Automatic Check Valve 150 dia
NRV -Non Return Valve 150 dia
Drain Valve 25 dia
Check Valve 250 dia
Gate Valve 250 dia

Zone control Valve Assembly 150 dia


(Butterfly Valve,PG,Water Flow Switch,Test & Drain Valve)

4 Way Breaching Inlet 150 Dia


PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING

LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI

CONSULTANT: BEL YOAHAH

CLIENT: DUBAI POLICE HEADQUARTERS

Fire Fighting Quantity

SL. No. Description SIZE

FHC - Recessed - Double Door


1) Automatic Swing Type Hose Reel - 25mm Dia x 30 Meter
2) 25 mm Dia - PRV,LSV
3) Combine 65 Dia - PRV &LV
6 4) 65 Dia Hose x 30 Meter with Nozzle
5) 6Kg Dry Powder Fire Extinguisher
6) 5 Kg CO2 Fire Extinguisher

Suction side & Delivery Side Valves

8 SYSTEM
FM 200 - Clean Agent System
Telephone room-GF 9.58
Server room-GF 25.29
Control Room-GF 18.07
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING

LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI

CONSULTANT: BEL YOAHAH

CLIENT: DUBAI POLICE HEADQUARTERS

Fire Fighting Quantity

SL. No. Description SIZE

CBS & UPS Room-GF 12.1


Reception-GF 22.74
GSM ROOM - Roof 10.49
LV Room 28.95

FOAM Spray System


GENERATOR ROOM - Service Block 7.82
Sub station room-Service Block 37.29
Lift Machine Pre Action System
Lift Machine Pre Action System 10.59
9.3
9
HDPE Wet Riser mains from Pump room to Main Building 200 mm
150 mm
65 mm
25 mm

Sprinkler Pipe for Sprinkler - ERW - GI above false ceiling


25 mm
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING

LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI

CONSULTANT: BEL YOAHAH

CLIENT: DUBAI POLICE HEADQUARTERS

Fire Fighting Quantity

SL. No. Description SIZE

32 mm
40 mm
50 mm
65 mm
80 mm
100 mm
125mm
150 mm

Sprinkler Pipe for Sprinkler - ERW - GI below false ceiling


25 mm
32 mm
40 mm
50 mm
65 mm
80 mm
100 mm
125mm
150 mm
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING

LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI

CONSULTANT: BEL YOAHAH

CLIENT: DUBAI POLICE HEADQUARTERS

Fire Fighting Quantity

SL. No. Description SIZE

Sprinkler riser Pipe F/B 150mm


Sprinkler drain riser 50 mm
Breeching pipe to sprinkler riser 50 mm
Breeching pipe to wet riser 150mm
Wet Riser pipe 150 mm
Pipe Fittings, Supports - 60%

11 Fire Fighting Water Tank Connection


STEMS BUILDING

ond, DUBAI

RTERS

TOTAL QUANTITY Unit Unit Price of Material Total Material Price

1 Nos 210,000.00 210,000.00

1 Nos incl

1 Nos incl

-
24 Nos 50.00 1,200.00
57 Nos 50.00 2,850.00
2376 Nos 50.00 118,800.00
0 Nos 50.00 -
19 Nos 60.00 1,140.00
-
12 Nos 350.00 4,200.00
12 Nos 350.00 4,200.00
-
4 Nos 4,000.00 16,000.00
STEMS BUILDING

ond, DUBAI

RTERS

TOTAL QUANTITY Unit Unit Price of Material Total Material Price

1 Nos 2,000.00 2,000.00


1 Nos 8,500.00 8,500.00
1 Nos 300.00 300.00
1 Nos 6,000.00 6,000.00
2 Nos 1,500.00 3,000.00
1 Nos 100.00 100.00
2 Nos 3,000.00 6,000.00
3 Nos 2,000.00 6,000.00

6 Nos 3,000.00 18,000.00

-
2 Nos 3,500.00 7,000.00
-
STEMS BUILDING

ond, DUBAI

RTERS

TOTAL QUANTITY Unit Unit Price of Material Total Material Price

22 Nos 4,500.00 99,000.00

-
0 Lot 30,000.00 -
-
-
-
10 sq mtr 1,300.00 13,000.00
26 sq mtr 1,300.00 33,800.00
20 sq mtr 1,300.00 26,000.00
STEMS BUILDING

ond, DUBAI

RTERS

TOTAL QUANTITY Unit Unit Price of Material Total Material Price

12 sq mtr 1,300.00 15,600.00


23 sq mtr 1,300.00 29,900.00
11 sq mtr 1,300.00 14,300.00
29 sq mtr 1,300.00 37,700.00
-
-
8 1,500.00 12,000.00

-
11 sq mtr 1,500.00 16,500.00
10 sq mtr 1,500.00 15,000.00

11.84 Mtrs 800.00 9,472.00


147.15 Mtrs 650.00 95,647.50
37.01 Mtrs 110.00 4,071.10
32.98 Mtrs 65.00 2,143.70

2265.08 Mtrs 11.00 24,915.88


STEMS BUILDING

ond, DUBAI

RTERS

TOTAL QUANTITY Unit Unit Price of Material Total Material Price

253.51 Mtrs 13.00 3,295.63


1546.18 Mtrs 15.00 23,192.70
2294.35 Mtrs 20.00 45,887.00
879.86 Mtrs 30.00 26,395.80
691.88 Mtrs 35.00 24,215.80
244.13 Mtrs 55.00 13,427.15
0 Mtrs 80.00 -
536.53 Mtrs 100.00 53,653.00

2265.08 Mtrs 11.00 24,915.88


253.51 Mtrs 13.00 3,295.63
1546.18 Mtrs 15.00 23,192.70
2294.35 Mtrs 20.00 45,887.00
879.86 Mtrs 30.00 26,395.80
691.88 Mtrs 35.00 24,215.80
244.13 Mtrs 55.00 13,427.15
0 Mtrs 80.00 -
536.53 Mtrs 100.00 53,653.00
STEMS BUILDING

ond, DUBAI

RTERS

TOTAL QUANTITY Unit Unit Price of Material Total Material Price

-
25 Mtrs 90.00 2,250.00
0 Mtrs 20.00 -
80 Mtrs 90.00 7,200.00
0 Mtrs 90.00 -
0 Mtrs 90.00 -
0 Lot 75,000.00 330,450.00

0 Lot 5,000.00 -
Total Material Dry Cost 1,398,090.22
in AED
OH @1.65 2,306,848.86
FCU GF FF 2F & 3F 4F RF SER BLOCK
FCU-duct 11 31 31 33
DX 5 6
AHU 6
FAHU 3

DUCTING SUMMARY:
DESC sq mtr 10%
SAD 4249 4674
RAD 320 352
FAD 1828 2010
EAD 1520 1672
SMED 196 216
CSMED 552 607
CSMAD 266 292
SPD 121 133
RF (Al Clad) 1330 1463

SUPPLY AIR DUCT:


GROUND FLOOR
W in mm H in mm L in mtr A in sq mtr A in sq mtr
TYPICAL FCU
GYM 2
600 300 10.13 18.234
500 250 2.54 3.81
300 250 7.56 8.316 60.72

Non typical
500 250 4.15 6.225
300 250 17.25 18.975
250 200 7.3 6.57
550 300 7.95 13.515
350 250 6.39 7.668 52.953
GF
From AHU RAD
1050 500 3.45 10.695 500 750 9.05
1000 450 17.44 50.576 1100 600 1.91
800 450 7.36 18.4 900 500 1.08
750 400 8.69 19.987 1050 500 2.06
650 350 18.25 36.5 1000 450 1.34
550 250 14.41 23.056 1150 500 4.47
400 200 62.37 74.844 1200 550 4.73
550 250 7.71 12.336 800 450 8.61
1150 500 4.51 14.883 750 400 16.29
650 300 2.97 5.643
550 200 3.2 4.8 GF-RAD
350 250 15.78 18.936
900 500 3.39 9.492
700 400 10.69 23.518
500 250 12.92 19.38
300 250 23.64 26.004
600 300 35.72 64.296
750 500 3.21 8.025
750 400 2.98 6.854
700 350 6.21 13.041
500 250 26.31 39.465
350 200 8.81 9.691
300 200 12.73 12.73
1200 550 8.92 31.22
1000 550 11.56 35.836
650 350 16.29 32.58
450 250 32.8 45.92
300 250 8.67 9.537
250 150 10.08 8.064
650 300 29.04 55.176
700 350 6.54 13.734
550 300 12.97 22.049
300 250 20.28 22.308
1200 550 12.45 43.575
750 400 4.46 10.258
450 250 5.26 7.364
500 250 23.13 34.695
300 200 26.71 26.71
350 250 8.97 10.764
200 150 9.18 6.426
800 450 8.56 21.4
DIA 350 11.77 1.099
DIA 300 2 0.942
DIA 400 2.16 1.256
200 550 2.6 3.9
200 150 4.87 3.409 971.374

FIRST FLOOR to FOURTH FLOOR


SAD typ nos typ flr
For Office -01 typ 9 4
600 300 3.48 6.264
500 200 10.29 14.406 744.12

For Office -02 typ 6 4


650 300 3.04 5.776
500 200 9.46 13.244 138.624

Atrium Corridor 4 4
650 300 1.74 3.306
500 250 9.05 13.575
300 250 5.1 5.61 359.856

Managers Office 2 4
550 300 4.68 7.956
450 250 2.01 2.814
300 200 2.7 2.7 107.76

Deputy Director Office 2 4


650 300 1.71 3.249
550 300 4.07 6.919
450 250 5.81 8.134
300 200 6.84 6.84 201.136

Meeting Room 1 4
FCU-F-01-K
400 200 3.03 3.636 14.544

Office-03 1 4
FCU-F-06-A
600 300 3.7 6.66
500 250 2.26 3.39
300 250 2.92 3.212 53.048

Secretary 1 4
FCU-F-06-B
600 300 5.55 9.99
450 250 2.7 3.78
350 250 3.11 3.732 70.008

Gents Lounge 2 4
500 250 2.21 3.315
400 200 9.8 11.76 120.6

Corridor 1 4
650 350 1.76 3.52
550 300 3.29 5.593
550 250 1.59 2.544
500 250 2.32 3.48
400 250 8.28 10.764
400 200 8.39 10.068 143.876

Gents Prayer 1 4
500 250 5.25 7.875
400 200 8.5 10.2 72.3

Meeting Room 2 4
350 250 3.01 3.612
250 200 3.46 3.114 53.808

Toilets 1 4
650 300 2.06 3.914
550 350 5.08 9.144
500 250 2.54 3.81
350 250 19.21 23.052
250 150 2.76 2.208 168.512

ROOF RF-RAD
1150 500 4.7 15.51 1150 500 16.31
900 500 3.96 11.088 900 500 14.07
750 500 10.76 26.9 750 500 9.65
1200 550 14.96 52.36 1100 600 10.98
1000 450 9.03 26.187 1000 450 11.34
1200 550 11.45 40.075 172.12
RF-RAD
TOTAL
106
11
6
3

22.625
6.494
3.024
6.386
3.886
14.751
16.555
21.525
37.467
132.713
53.823
39.396
24.125
37.332
32.886

187.562
FRESH AIR DUCT EXHAUST AIR DUCT
W in mm H in mm L in mtr A in sq mtr W in mm H in mm L in mtr A in sq mtr
GF GF
650 350 13.59 27.18 650 350 9.24 18.48
550 300 28.41 48.297 500 250 5.46 8.19
350 250 32.54 39.048 250 200 11.59 10.431
450 250 13.5 18.9 250 150 51.51 41.208
300 250 8.26 9.086 250 150 59.91 47.928
250 200 26.57 23.913 500 250 3.7 5.55
250 150 15.7 12.56 300 200 13.81 13.81
650 300 8.34 15.846 300 250 3.08 3.388
300 200 50.72 50.72 550 300 2.02 3.434
200 150 30.52 21.364 450 250 1.9 2.66
500 250 6.85 10.275 350 250 13.9 16.68
550 250 8.23 13.168 300 250 3.38 3.718
550 250 13.15 21.04
GF 290.357 400 250 24.37 31.681
250 150 24.94 19.952

GF 248.15

FF FF
700 350 1.96 4.116 450 250 4.06 5.684
550 300 11.6 19.72 350 250 5.48 6.576
450 250 8.86 12.404 300 200 3.5 3.5
300 200 16 16 250 150 26.49 21.192
350 250 11.99 14.388 500 250 6.13 9.195
250 200 17.88 16.092 200 150 30.4 21.28
250 150 9.82 7.856 550 250 7.48 11.968
200 150 8.2 5.74 450 250 2.97 4.158
1200 500 2.91 9.894 150 150 11.53 6.918
650 350 5.06 10.12 1500 800 13.23 60.858
600 300 7.16 12.888 350 250 1.76 2.112
500 250 6.87 10.305 300 200 9.55 9.55
400 250 7.47 9.711
200 150 14.3 10.01 FF 651.964
300 250 8.23 9.053
300 200 21.83 21.83
1500 800 16.01 73.646

FF 1055.092

RF RF
1200 500 11.07 37.638 1200 500 16.06 54.604
1400 650 20.63 84.583 1050 500 43.88 136.028
1500 700 19.4 85.36 550 300 33.86 57.562
1200 550 2.12 7.42 200 150 2.85 1.995
450 250 40.18 56.252 300 200 4.77 4.77
750 450 9.93 23.832
RF 271.253 600 550 33.44 76.912
1500 650 3.98 17.114
RISER 900 450 3.2 8.64
1000 500 25 75 800 450 1.93 4.825
1200 500 25 85 350 250 4.26 5.112
700 300 15 30
450 250 15 21 RF 391.394

FAD 211 SERVICE BLOCK


200 150 16.16 11.312

RISER
550 300 25 42.5
800 500 25 65
750 450 25 60
600 400 25 50

EAD 217.5
GRILLS GF FF 2F & 3F 4F RF SER BLOCTOTAL
SAG-Supply air Grill
200 150 1 1
250 100 1 2 1 4
300 150 1 1 2 1 5
300 200 1 2 1 4
400 200 5 5
800 100 18 36 18 72
1100 100 47 13 26 13 99
1500 100 9 9
400 100 1 2 1 4
550 300 1 1
FAG (with bell mouth & wiremesh)
200 150 6 5 10 5 26
250 200 6 6
250 150 3 6 3 12
300 200 10 5 10 5 30
300 250 2 1 2 1 6
350 250 3 3
400 250 2 2
450 250 1 1
500 250 2 2

EAG (with bell mouth & wiremesh)


200 150 11 11

RAG
400 100 1 2 1 4
450 450 12 12
500 750 1 1
800 100 18 36 18 72
1100 100 39 10 20 10 79
1500 100 3 3
TOTAL 474

FLEX DUCT GF FF 2F & 3F 4F RF SER BLOCTOTAL


DIA 200 72 25 50 25 172

DIFF GF FF 2F & 3F 4F RF SER BLOCTOTAL


SD
150 150 2 2
225 225 1 3 6 3 13
250 100 1 1
300 300 13 11 22 11 57
350 350 3 3
450 450 6 18 36 18 78
ED
150 150 15 15 30 15 75

RD
225 225 3 6 3 12
300 300 9 11 22 11 53
350 350 3 3
450 450 30 60 30 120
SLD
3 slot 1100 mm 20 20
3 slot 1000 mm 28 28
3 slot 1300 mm 2 4 2 8
3 slot 4300 mm 1 1
3 slot 1200 mm 4 4

RLD
3 slot 1100 mm 4 4
3 slot 1300 mm 2 4 2 8
3 slot 4300 mm 1 2 1 4
TOTAL 494

VCD GF FF 2F & 3F 4F RF SER BLOCTOTAL


DIA 200 34 22 44 22 122
150 150 11 22 11 44
200 150 2 2
200 150 1 1
200 150 17 14 28 14 73
250 150 24 1 2 1 28
250 200 6 6
300 250 10 2 12
300 200 5 2 4 2 13
300 200 3 3 6 3 15
350 250 4 8 4 16
350 250 3 3
400 200 6 6
400 250 3 6 3 12
400 200 10 20 10 40
400 250 2 2
450 250 3 3
500 250 16 16
500 200 30 60 30 120
500 250 1 1 2 1 5
550 250 1 1
550 300 2 2
600 300 7 7
650 300 4 4
650 350 2 2
700 400 3 3
700 350 1 1
750 500 1 1
900 500 1 1
1000 500 1 1
1000 500 1 1
1150 500 1 1
1200 550 1 1
1500 800 1 2 1 4
TOTAL 569

FD GF FF 2F & 3F 4F RF SER BLOCTOTAL


200 150 10 20 10 1 41
250 150 24 24
250 200 6 4 8 4 22
300 150 1 1
300 250 4 3 6 3 1 17
300 200 3 1 2 1 7
350 250 3 6 3 12
350 250 1 1
400 200 7 14 7 28
450 250 1 1
500 250 1 2 1 4
550 300 2 1 3
550 250 1 2 1 1 5
550 300 1 1
600 550 1 1
650 350 2 2
750 500 2 2
750 450 1 1
800 450 1 1
800 450 1 1
900 500 2 2
1000 500 2 2
1000 500 1 1
1000 450 1 1
1150 500 2 2
1200 550 1 1
1200 500 1 1
1400 650 1 1
TOTAL 186
VAV BOX GF FF 2F & 3F 4F RF SER BLOCTOTAL
BY pass typ
400 250 4 4

for Demand based ventilation


700 400 2 2

MSFD GF FF 2F & 3F 4F RF SER BLOCTOTAL


350 200 1 1
400 250 1 2 1 4
450 250 1 1
500 250 2 2
550 250 1 2 1 4
700 400 1 1
700 350 1 2 1 4
Riser for Smk ventilation
500 400 4 4
500 250 6 6
600 350 1 1
650 350 1 1
650 300 1 1
750 400 4 4
900 500 1 1
950 950 1 1
1150 500 1 1
1150 500 2 2
TOTAL 39

NRD GF FF 2F & 3F 4F RF SER BLOCTOTAL


1500 800 1 1
Riser for Smk ventilation
500 400 1 1
650 350 1 1
900 500 1 1
1150 500 1 1
1200 550 2 2
TOTAL 7

LOUVERS GF FF 2F & 3F 4F RF SER BLOCTOTAL


FAL with sand trap
1500 800 1 2 1 4
EAL
250 250 1 2 1 7 11
1500 800 1 2 1 4

SMEL
200 1400 1 1
500 500 1 1
750 750 1 1
950 950 1 1
1000 750 1 1
1200 700 1 1
2000 1000 2 2
2100 1000 2 2

ESP for FAHU-01


Dia in mm GF FF 2F & 3F 4F RF SER BLOCK RISER SUPPLY
15 26.08 26
20 2.53 38.72 38.72 38.72 119
25 9.92 114.23 114.23 114.23 353
32 9.88 212.16 212.16 212.16 646
40 8.34 114.01 114.01 114.01 6 356
50 24.27 65.11 65.11 65.11 8.53 24 252
65 3.83 48.4 48.4 48.4 22.9 18 190
80 3.51 6 10
100 7.89 7.89 7.89 15.94 48 88
125 29.19 18 47
150 77.39 77
200 128.89 129

VALVES SUMMARY:
FCU/AHU/FAHU: 15 mm 20 mm 25 mm 32 mm 40 mm
Dielectric Union 2 515 631 800 1200 1500
Flexible connection 2
union 2
Test point 2
Drain 1
PICV 1
Strainer 1
Gate Valve 3

CHILLED WATER PUMP


Flex connection 2
Drain cock 1
PG 2
Strainer 1
AAV 3
Balancing Valve 2
DRV 1

CHILLER
Flex connection 2
Drain valve 2
PG 2
T 2
Test point 1
DRV 1
STR 1
2WMV 1
IV 3

PRESSURIZATION UNIT
IV 5
Pressure switch 2

MANUAL CHEMICAL DOSING UNIT


check valve 2
Globe vavle 1
Stop valve 1
Drain Valve 1

Valve package: FCU AHU FAHU CHILER


15 mm 6 515
20mm 8 631
25mm 49 800
32mm 72 1200
40mm 2 1500
50mm 2 1
65mm 6 1
100mm 1
150mm 3
200mm 8
S+R 10% 10 % only supply
52.16 57 29
237.38 261 131
705.22 776 388
1292.72 1422 711
712.74 784 392
504.26 555 277
379.86 418 209
19.02 21 10
175.22 193 96
94.38 104 52
154.78 170 85
257.78 284 142

5044 2522
Corridor Smoke Extract Duct Corridor Smoke Make up Duct
GF GF
600 300 8.15 14.67 550 250 16.83 26.928
600 150 14.93 22.395
650 300 10.18 19.342

TYP FLR 4 TYP FLR


750 400 12.51 115.092 550 250 9.52 60.928
500 400 9.99 71.928

RF RF
1200 550 23.14 80.99 550 250 3.14 5.024
650 300 10.65 20.235 2000 100 5.64 23.688

RISER RISER
650 350 25 50 750 100 10 17
1150 500 25 82.5 1150 500 40 132
500 200 25 35
550 250 25 40

CSMED 552.152 CSMAD 265.568


SMED SPD
GF RF
900 500 2.17 6.076 950 950 5.57 21.166

RF RISER
1150 500 19.43 64.119 750 450 5 12
750 450 8.47 20.328 950 650 5 16
900 500 19.3 54.04 950 900 5 18.5
650 350 3.19 6.38 950 950 5 19
600 350 5 9.5
RISER 600 300 5 9
500 400 25 45 600 200 5 8
600 150 5 7.5

SPD 120.666
SMED 195.943
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
Water Supply Quantity
Total Unit Total Material Price
S.No Description Technical Details Unit Material
Quantity in AED
Price in AED
1 Sanitary Wares - Installation Only -
WC - Water Closet 59 No's 120.00 7,080.00
CWB - Counter Wash Basin 74 No's 120.00 8,880.00
Kitchen Sink 10 No's 120.00 1,200.00
-
2 Water Supply Equipments: -
Transfer Pump set (1D+1S) 6.50 l/s @ 500 Kpa 1 Set 45,000.00 45,000.00
Booster pump set (1D+1S with VFD) 7 l/s @ 250 Kpa 1 Set 55,000.00 55,000.00
Booster pump set (1D+1S) 1.8 l/s @ 250 Kpa 1 Set 25,000.00 25,000.00
Irrigation Booster pump set (1D+1S) by Landscape 3.0 l/s @ 500 Kpa 1 Set -
contractor
Hot water Recirculation Pump set (1D+1S) rated for 125 2.00 l/s @ 150 Kpa 1 Set 8,500.00 8,500.00
deg C liquid temp and timer control
-
Solar Panels 1.33 16 No's 1,400.00 22,400.00

Calorifier- 2000 ltrs 2 No's 35,000.00 70,000.00

4 GRP Water Tank - Roof -


38,000 US Gallon for
RCC-UG water tank with 2 manhole Domestic/60,000 for 2 No's -
reserve

Over Head Tank - GRP Water Tank - Insulated & Partition 8 m x7m x 1.5 m Ht - 1 No's 80,000.00 80,000.00
12 M3
-
Below Ground Water supply pipe HDPE -
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
Water Supply Quantity
Total Unit Total Material Price
S.No Description Technical Details Unit Material
Quantity in AED
Price in AED
40 mm 496.59 Mtr 80.00 39,727.20
75 mm 131.82 Mtr 120.00 15,818.40
125 mm 119.33 Mtr 650.00 77,564.50

5 Above Ground Cold Water Pipe - PPR - Horizontal -

Pipe Length 20 mm 0 Mtr 6.00 -


25 mm 35.7 Mtr 10.00 357.00
32 mm 95.09 Mtr 12.00 1,141.08
40 mm 165.4 Mtr 18.00 2,977.20
50 mm 164.42 Mtr 24.00 3,946.08
65 mm 71.96 Mtr 40.00 2,878.40
75 mm 3.96 Mtr 50.00 198.00
100 mm 39.19 Mtr 100.00 3,919.00
125 mm 45.51 Mtr -
Pipe Fittings, Supports - 1.5x pipe cost 0 Lot 50,000.00 222,790.29
-
Above Ground Hot Water Pipe with Insulation Supply
6 -
- PPR - Horizontal
Pipe Length 15 mm 0 Mtr 10.00 -
20 mm 1.56 Mtr 12.00 18.72
25 mm 21.12 Mtr 15.00 316.80
32 mm 84.2 Mtr 20.00 1,684.00
40 mm 66.75 Mtr 25.00 1,668.75
50 mm 104.44 Mtr 30.00 3,133.20
65 mm 31.67 Mtr 45.00 1,425.15
75 mm 30.8 Mtr 50.00 1,540.00
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
Water Supply Quantity
Total Unit Total Material Price
S.No Description Technical Details Unit Material
Quantity in AED
Price in AED
100 mm 13.25 Mtr 65.00 861.25
-
Copper pipes -
From Solar panel to pump 32 mm 80.26 Mtr 61.00 4,895.86
-
Above Ground Hot Water Pipe Return - PPR - -
Horizontal
25 mm 26.51 Mtr 15.00 397.65
Pipe Length 32 mm 77.3 Mtr 20.00 1,546.00
50 mm 58.09 Mtr 30.00 1,742.70
75 mm 20.04 Mtr 50.00 1,002.00
-
Pipe Fittings, Supports - 1.5 x pipe cost 0 Lot 10,000.00 30,348.12
-

Above Ground Cold Water Pipe - PPR with Rubber


7 -
Insulation, Aluminium cladding - Vertical

Cold Water Supply Pipe 25 mm 21.12 Mtr 18.00 380.16


40 mm 5.88 Mtr 25.00 147.00
50 mm 29.18 Mtr 35.00 1,021.30
65 mm 31.67 Mtr 48.00 1,520.16
75 mm 30.8 Mtr 65.00 2,002.00
100 mm 13.25 Mtr 75.00 993.75
Pipe Fittings, Supports - 40% of Pipe 0 Lot 8,000.00 -
-
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
Water Supply Quantity
Total Unit Total Material Price
S.No Description Technical Details Unit Material
Quantity in AED
Price in AED
8 Pex Pipe with conduit - Cold & Hold Water (2.5m per drop 15 mm 357.5 Mtr 10.00 3,575.00
-
9 IV -Isolating Valve -
20 mm 0 No's 40.00 -
25 mm 0 No's 55.00 -
32 mm 2 No's 80.00 160.00
50 mm 0 No's 170.00 -
100 mm 0 No's 300.00 -
-
DRV-Double regulating Valve 50 mm

10 WHA - Water Hammer Arrestor 25 mm 55 No's 120.00 6,600.00


-
11 PRV -Pressure Releave Valve -
50 mm 0 No's 1,500.00 -
65 mm 0 No's 2,500.00 -
-
12 NRV -Non Retrun Valve 100 mm 0 No's 350.00 -
50 mm 0 No's 200.00 -
-
13 Angle Valve 15 mm 286 No's 20.00 5,720.00
-
14 Hose Bb Tab with IV 10 No's 100.00 1,000.00
-
15 Other Items: -
UG Water Tank Connection & float Valve - 180 m3 -2 No's 50 mm 0 No's 1,000.00 -
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
Water Supply Quantity
Total Unit Total Material Price
S.No Description Technical Details Unit Material
Quantity in AED
Price in AED
Float Valve for UG Water Tank 50 mm 0 No's 1,800.00 -
Float Valve for GRP Connection 50 mm 0 No's 1,800.00 -
Puddle Flange 50 mm 0 No's 1,000.00 -
100 mm 0 No's 1,500.00 -
Main - Water Meter Connection 50 mm 1 No's 5,000.00 5,000.00
Flat - Water Meter Connection 25 mm 0 No's 800.00 -

16 Isolation Valve Chamber 40 mm 7 No's 2,000.00

Thermostatic mixing Valve 32 mm 3 No's


50 mm 4 No's
Total Material Dry Cost in AED 773,076.72
OH @1.65 1,275,576.59
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
DRAINAGE Quantity

Total Unit Material Total Material Price in


S.No Description Technical Details Unit
Quantity Price in AED AED

1 Equipments -

Sump pump set for irrigation pump room


for Drainage ( pump with auto coupling
system, Single stage entilrely Stainless 2.0 l/s @ 200 Kpa 1 Set 18,000.00 18,000.00
steel designed for pumping effluent solid
particles

-
2 UPVC - Below Ground Pipes -
Waste Pipe 110 mm 8 Mtrs 12.00 96.00
-
Car Pariking Drain Pipe 110 mm 0 Mtrs 12.00 -
160 mm 0 Mtrs 18.00 -
-
Planter Drain Pipe 110 mm 0 Mtrs 12.00 -
-
Vent Pipes 82 mm 99 Mtrs 10.00 990.00
-
Condensate Drain Pipes 80 mm 0 Mtrs 10.00 -
-
Soil pipe 200 mm 223 Mtrs 15.00 3,345.00
-
Pipe Fittings, supports - 50% 0 Lot 2,500.00 2,500.00
-
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
DRAINAGE Quantity

Total Unit Material Total Material Price in


S.No Description Technical Details Unit
Quantity Price in AED AED

UPVC - Above Ground Pipes ( Sound


3 -
Proof Pipe)
Waste Pipe 32 mm 0 Mtrs 18.00 -
40 mm 0 Mtrs 20.00 -
82 mm 114.83 Mtrs 22.00 2,526.26
110 mm 81.67 Mtrs 30.00 2,450.10
160 mm 114.03 Mtrs 45.00 5,131.35
200 mm 0 Mtrs 55.00 -
-
Soil Pipe 110 mm 52.81 Mtrs 30.00 1,584.30
160 mm 456.73 Mtrs 45.00 20,552.85
200 mm 256 Mtrs 55.00 14,080.00
-
Car Parking Drain Pipe 82 mm 0 Mtrs 22.00 -
110 mm 0 Mtrs 30.00 -
-
Vent Pipes 50 mm 0 Mtrs 20.00 -
82 mm 0 Mtrs 22.00 -
110 mm 92.68 Mtrs 30.00 2,780.40
160 mm 176 Mtrs 45.00 7,920.00
-
Condensate Drain Pipes 50 mm 309 Mtrs 20.00 6,180.00
25 mm 0 Mtrs 15.00 -
32 mm 0 Mtrs 18.00 -
80 mm 0 Mtrs 22.00 -
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
DRAINAGE Quantity

Total Unit Material Total Material Price in


S.No Description Technical Details Unit
Quantity Price in AED AED

-
Rain Water Pipe 110 mm 121.92 Mtrs 30.00 3,657.60
160 mm 4.33 Mtrs 45.00 194.85
200 mm 0 Mtrs 55.00 -
-
Pipe Fittings, supports - 50% 0 Lot 35,000.00
-
3 UPVC - Vertical Riser Pipes -
Waste Pipe 110 mm 0 Mtrs 10.00 -
160 mm 0 Mtrs 16.00 -
200 mm 108 Mtrs 20.00 2,160.00
-
Soil Pipe 110 mm 0 -
160 mm 0 Mtrs 16.00 -
200 mm 96 Mtrs 20.00 1,920.00
-
Car Parking Drain Pipe 110 mm 0 Mtrs 10.00 -
-
Vent Pipes 82 mm 12 Mtrs 8.00 96.00
110 mm 0 Mtrs 10.00 -
160 mm 0 Mtrs 16.00 -
-
Condensate Drain Pipes 50 mm 120 Mtrs 6.00 720.00
80 mm 0 Mtrs 8.00 -
-
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
DRAINAGE Quantity

Total Unit Material Total Material Price in


S.No Description Technical Details Unit
Quantity Price in AED AED

Rain Water Pipe 110 mm 0 Mtrs 10.00 -


200 mm 126 Mtrs 20.00 2,520.00
-
Balcony Drain Pipe 50 mm 0 Mtrs 6.00 -
-
Pipe Fittings, supports - 50% 0 Lot 21,000.00 3,500.00
-
3 Pressure Pipe -
Pressure Pipe 80 mm 0 Mtrs 90.00 -
-
4 Gully Trap, FCO, FT, PD, CG -
FD - Floor Drain 66 Nos 200.00 13,200.00
FCO - Floor Clean Out 11 Nos 150.00 1,650.00
CO - Clean Out 0 Nos 50.00 -
GT -Gully Trap 600 x 600 mm 11 Nos 150.00 1,650.00
PD - Planter Drain 0 Nos 225.00 -
POD -Pool Drain 300 x 300 x 300 mm 0 Nos 250.00 -
AD - Area Drain 0 Nos 225.00 -
BD - Balcony Drain 0 Nos 120.00 -
RWO - Rain Water Outlet 110mm 20 Nos 250.00 5,000.00
CB- Catch Basin with sandtrap bucket 3 Nos 225.00 675.00
FFD - Funnel Floor Drain 1 Nos 250.00 250.00
Drain Trench Grating 150 x 300 x 7000 mm 0 Nos 5,000.00 -
150 x 300 x 7600 mm 0 Nos 5,000.00 -
150 x 300 x 4000 mm 0 Nos 2,800.00 -
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
DRAINAGE Quantity

Total Unit Material Total Material Price in


S.No Description Technical Details Unit
Quantity Price in AED AED

150 x 300 x 3000 mm 0 Nos 2,100.00 -


DV - Drain Valve 80 mm 0 Nos 100.00 -
IV 80 mm 0 Nos 150.00 -
NRV 80 mm 0 Nos 250.00 -
-
5 Others -
Sand Trap 600x600x1500 mm 1 Nos 2,500.00 2,500.00
Oil Interceptor 1800 x 1500 x 1700 mm 1 Nos 10,000.00 10,000.00
-
6 Covers -
Manhole 38 Nos -
FIC Cover 600x600mm 1 Nos 800.00 800.00
Dry inspection Cover 2 Nos 1,000.00 2,000.00
Inspection chamber Cover 1 Nos 1,200.00 1,200.00
PMBH (Pressure Breaking) 600x600mm 1 Nos 1,000.00 1,000.00
Manhole Cover 600x600mm 21 Nos 800.00 16,800.00
Manhole Cover 800x800mm 3 Nos 1,000.00 3,000.00
Manhole Cover-SS 304 600x600mm 8 Nos 6,000.00 48,000.00
800x800mm 5 Nos 8,000.00 40,000.00
Sump Pit Cover 600x600mm 1 Nos 800.00 800.00
Sand Trap Cover - Heavy Duty 600x600mm 1 Nos 1,000.00 1,000.00
Oil Interceptor Cover - Heavy Duty 600x600mm 1 Nos 1,000.00 1,000.00

Total Material 288,429.71


Dry Cost
PROJECT: 613 - PROPOSED ELECTRONIC SECURIY SYSTEMS BUILDING
LOCATION: Plot No. 2641019, Muhaisanah Second, DUBAI
CONSULTANT: BEL YOAHAH
CLIENT: DUBAI POLICE HEADQUARTERS
DRAINAGE Quantity

Total Unit Material Total Material Price in


S.No Description Technical Details Unit
Quantity Price in AED AED

OH @1.65 475,909.02
Sl. No. Description Cover Size Cover type

Heavy Duty epoxy


FIC 60x60 coated GRP sealing 675
MH 13 60x60 575
12 60x60 575
11 60x60 575
10 60x60 575
9 60x60 575
8 60x60 575
7 60x60 575
6 60x60 575
5 60x60 575
4 80x80 650
3 80x80 Heavy Duty double 650
seal double
2 60x60 triangular epoxy 575
1 60x60 coated 575

MH 11 60x60
11-A 60x60
11-B 60x60
11-C 60x60
11-D 60x60
11-E 60x60
11-F 80x80 Heavy Duty Double
11-G 80x80 seal doubl;e
triangular coated
11-H 80x80 SS 304and inbuilt
11-J 80x80 gully

MH 3
13-A 60x60

MH 11G 80x80
11G1 60x60
11G2 60x60 SS 304

MH 3 80x80
3A 60x60
3B 60x60
2 60x60
2A 60x60
12 60x60 Heavy Duty double
seal double
12A 60x60 triangular epoxy
12B 60x60 coated
12C 60x60
FCU PIPE SIZE 3/4"

unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED

1 IV 3 28.00 84.00

2 DRV 0 65.00 -

3 Y STR 1 23.00 23.00

4 UNION 2 12.00 24.00

5 DC 1 20.00 20.00

6 AAV 1 25.00 25.00

7 TP 3 15.00 45.00

221.00

1 PICV ( DRV, 2 Way Control) 1 294.00 294.00

MATERIAL COST 515.00

FCU PIPE SIZE 1"

unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED

1 IV 3 39.00 117.00

2 DRV 0 90.00 -

3 Y STR 1 33.00 33.00

4 UNION 2 12.00 24.00


5 DC 1 20.00 20.00

6 AAV 1 25.00 25.00

7 TP 3 15.00 45.00

264.00

1 PICV ( DRV, 2 Way Control) 1 367.00 367.00

MATERIAL COST 264 631.00

FAHU PIPE SIZE 3"

unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED

1 IV 3 313.00 939.00

2 DRV 1 789.00 789.00

3 Y STR 1 255.00 255.00

4 FC 2 280.00 560.00

5 DV 1 30.00 30.00

6 AAV 1 40.00 40.00

7 TP 4 25.00 100.00

8 THERMOMETER 2 80.00 160.00

2,613.00

1 3 WAY Valve 1 4,500.00 4,500.00


MATERIAL COST 2613 7,113.00
CHW PUMP PIPE SIZE 4"

unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED

1 BV 2 425.00 850.00

2 DRV 1 850.00 850.00

3 Y STR 1 330.00 330.00

4 F.C 2 310.00 620.00

5 DV 2 30.00 60.00

6 NRV 1 255.00 255.00

7 TP 2 25.00 50.00

8 PG 2 50.00 100.00

MATERIAL COST 3,115.00


HEX - Secondary Side PIPE SIZE 4"

unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED

1 F.C 2 310.00 620.00

2 BV 2 425.00 850.00

3 Y STR 1 330.00 330.00

5 DC 2 30.00 60.00

6 AAV 1 40.00 40.00

7 PG 2 50.00 100.00

8 TG 2 80.00 160.00

9 Thermometer 2 100.00 200.00

10 TP 2 25.00 50.00

MATERIAL COST 2,410.00

BTU METER PIPE SIZE 1"

unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED

1 IV 3 40.00 120.00

2 DRV 1 180.00 180.00

3 Y STR 1 35.00 35.00

4 UNION 2 12.00 24.00

5 Tee 2 30.00 60.00


6 TP 2 15.00 30.00

449.00

1 Aluminium Box 1 100.00 100.00

MATERIAL COST 549.00

CHW PUMP PIPE SIZE 4"


unit Price
S.NO DESCRIPTION QTY Total Price in AED
in AED
1 BV 2 425.00 850.00
2 DRV 1 850.00 850.00
3 Y STR 1 330.00 330.00
4 F.C 2 310.00 620.00
5 DV 2 30.00 60.00
6 NRV 1 255.00 255.00
7 TP 2 25.00 50.00
8 PG 2 50.00 100.00
MATERIAL COST 3,115.00