Agenda

• A Better Way to Manage Change


• Charting a Progressive Course to Portfolio Value
• Greater Enterprise Support - One for All and All for One
• Speeding Decision Analysis and Enhancing Collaboration
• Strengthening P6 Integration Connections
• Additional Enhancements and Technical Requirements
• Delivering the Goods
• Questions?

3
Our Changing World

• “In this world, nothing is certain but death and


taxes and change” – Benjamin Franklin

Every Exit

4
Enterprise Portfolio GPS

Portfolio Benefits Portfolio Selection


• Efficiently and • Identify your
effectively arrive strategic destination
at your strategic and map to it with
destination the right
• Deliver on your investments
goals

Portfolio Assessment
• Continuously evaluate your progress to
your destination
• Make appropriate course corrections

5
Enterprise GPS Powered By:

• Easy access to historical data and creating versions


• Faster portfolio analysis with greater visual aids
• Greater enterprise investment portfolio support
• Enhanced data management with dynamic lists
• Expanded data exchange options using the
Primavera Portfolio Management Bridge to P6
• Improved administration saves time and minimizes
end user training reducing the total cost ownership

6
Agenda

• A Better Way to Manage Change


• Charting a Progressive Course to Portfolio Value
• Greater Enterprise Support - One for All and All for One
• Speeding Decision Analysis and Enhancing Collaboration
• Strengthening P6 Integration Connections
• Additional Enhancements and Technical Requirements
• Delivering the Goods
• Questions?

7
One Click Access to Selecting a Specific Date
New “Data as of”
drop-down

Specific Date
Selected

Shading indicates
8
past/future data
One Click Access to Selecting a Specific Version

9
Creating Versions

10
Smart Trending Analysis

• Graphs enable
comprehensive
analysis by
being:
• Anchored to
a specific
date or
version
• Changed on
the fly by
using dates
or versions
• Viewed by
specific
intervals of
time

11
Agenda

• A Better Way to Manage Change


• Charting a Progressive Course to Portfolio Value
• Greater Enterprise Support - One for All and All for One
• Speeding Decision Analysis and Enhancing Collaboration
• Strengthening P6 Integration Connections
• Additional Enhancements and Technical Requirements
• Delivering the Goods
• Questions?

12
Greater Enterprise Support
- One for All and All for One

• Simplifies managing different types of investments to


deliver global enterprise value
• Specific investment types intelligently paired with the
corresponding portfolio evaluation views

• Optimizes speed and performance as use expands


• Greater analytic support through multiple back-end servers to
distribute the calculation load

• Ties enterprise portfolio analysis together across the


globe
• More Locale settings (date, time and currency) support
• German speaking regions of Switzerland

13
13
Greater Enterprise Support
- One for All and All for One

Asset
CXOs, Strategic Planners,
Managers
Governance Staff,
LOB Management
IT Staff
Application
Managers
Plant
Managers

Reliability
Enterprise Staff
Architects

Product
Managers

Sales &Marketing
Developers Managers

14
Selecting Evaluation Views

Only forms
belonging to
current item‟s
domain (or marked
as „All‟) are listed.

15
15
Selecting Investments

If user select Item


from a different
Domain….

16
Intelligently Reconciling Pairings

… form will be
blank. And then
the user may select
from the Form list
based on this
Item‟s domain.

17
Defining Evaluation Views by Type of Investment

Domain for
Forms/Dashboards
defined. “All” is
the default.

Domain for
Items/Portfolios.

18
18
Improve Performance of Analytic Calculations
• Scale out using multiple Analytic (Back-End) Servers

19
19
Additional Locale Setting Support

• Locale and settings may be set for:


• German speaking regions of Switzerland
• German (for Germany)
• French (for Canada and France)
• English (for UK and USA)
• Spanish (for Spain)

20
Agenda

• A Better Way to Manage Change


• Charting a Progressive Course to Portfolio Value
• Greater Enterprise Support - One for All and All for One
• Speeding Decision Analysis and Enhancing Collaboration
• Strengthening P6 Integration Connections
• Additional Enhancements and Technical Requirements
• Delivering the Goods
• Questions?

21
Speeding Decision Analysis and
Enhancing Collaboration
- Enhanced
visualization
- Improved
collaboration

Smoothes out the


hills and valleys
of progress
delivering faster
and greater
enterprise value

22
22
Enhanced Visual Aids Improves Portfolio
Analysis
• Additional indicator colors
and shapes
• Shortens the time between
analysis and securing
approval
• Tightens indicator thresholds
(up to 7) enabling earlier
signals of issues allowing for
more time to correct
• Offers flexibility through
changing indicator names for
greater organizational context

23
Enhanced Visual Aids Improves Portfolio
Analysis

New indicators are


shown throughout
the product

24
24
Speed Portfolio Analysis by Optimizing the
Display of Analytics in Scorecards

25
Specifying Category Values and/or
Indicators to Display in Scorecards

26
Unlock Investor Map Power through
Streamlined Access to Analysis Capabilities

27
Copy / Paste Data Between Dynamic Lists
and Microsoft Excel

28
Trigger Alerts Using Dynamic List Category
Values

• Earlier notification of risks minimizes obstacles to delivering value

29
Agenda

• A Better Way to Manage Change


• Charting a Progressive Course to Portfolio Value
• Greater Enterprise Support - One for All and All for One
• Speeding Decision Analysis and Enhancing Collaboration
• Strengthening P6 Integration Connections
• Additional Enhancements and Technical Requirements
• Delivering the Goods
• Questions?

30
Strengthening P6 Integration Connections

• Offers additional options to share relevant data for


better portfolio analysis
• New alternative for managing summarized resource information
at the project level
• Data over time support for cost summarizations at WBS Level 2

31
31
Project - Resource Data Management Options
- Example

• Data in P6
• Primary Role – DBA
• Planned DBA hours – 50
• Planned QA hours – 20

Resource – Current Option Role – New Option


• Summarized hours based on • Summarized hours based on
Primary Role Role
• OPPM Summarized Planned DBA • OPPM Summarized Planned
hours - 70 DBA hours – 50
• OPPM Summarized Planned QA
hours – 20
• Impacts role availability based on • Impacts role availability based on
primary role specific roles

32
Data Over Time Support for Summarizations
at WBS Level 2

P6 – Schedule spans
multiple years

OPPM 8 – Shows
costs by Phase (WBS)
and year

33
Agenda

• A Better Way to Manage Change


• Charting a Progressive Course to Portfolio Value
• Greater Enterprise Support - One for All and All for One
• Speeding Decision Analysis and Enhancing Collaboration
• Strengthening P6 Integration Connections
• Additional Enhancements and Technical Requirements
• Delivering the Goods
• Questions?

34
Primavera Portfolio Management 8
- Additional Enhancements

• Increased flexibility in product access and management


for users and administrators
• Inclusion of Type User to create advanced functions
• Secured access to dynamic list “Add, Remove or Edit” buttons to
prevent accidental changes
• Easier display of disabled value list values and ability to re-enable them
• Enhancements to Database Clean-up Utility

• Lower cost of ownership


• Elimination of Java for Investor Map functionality
• Greater 64-bit support
• Simultaneous install of the core and add-on modules

• New Oracle Primavera Portfolio Management product


branding

35
Primavera Portfolio Management 8
- High Level Technical Requirements
• Support for five operating system platforms
• Windows Server 2003 32-bit
• Windows Server 2003 64-bit
• Windows Server 2008 32-bit
• Windows Server 2008 64-bit
• Windows Server 2008 R2 64-bit
• Support for Internet Explorer (IE) 8 and (IE) 7
• Support for Oracle 10.2.0.4
• Support for Microsoft SQL Server 2005 and 2008
• Support no longer offered for Microsoft SQL Server 2000

36
Agenda

• A Better Way to Manage Change


• Charting a Progressive Course to Portfolio Value
• Greater Enterprise Support - All for One and One for All
• Speeding Decision Analysis and Enhancing Collaboration
• Strengthening P6 Integration Connections
• Additional Enhancements and Technical Requirements
• Delivering the Goods
• Questions?

37
Oracle‟s Primavera Portfolio Management 8
The Enterprise GPS

• Gives organizations foresight to steer clear of “dips” in the road…

38
Oracle‟s Primavera Portfolio Management 8
The Enterprise GPS

… and drive towards high value portfolio opportunities

39
Agenda

• A Better Way to Manage Change


• Charting a Progressive Course to Portfolio Value
• Greater Enterprise Support - One for All and All for One
• Speeding Decision Analysis and Enhancing Collaboration
• Strengthening P6 Integration Connections
• Additional Enhancements and Technical Requirements
• Delivering the Goods
• Questions?

40
Questions

41
<Insert Picture Here>

Oracle‟s Primavera Portfolio Management


What‟s New in Release 8

You might also like