You are on page 1of 3

Slab No. Total No.

of Slab 1

1250 mm Y 10 @ 150 c/c 1250 mm

D= 150 mm

Y 10 @ 200 c/c Y 10 @ 150 c/c

200 L= 5000 mm X B= 4000 mm 200 mm

One way / Two way Slab

Project :-
Name of work :-

Sr. Dia of Nos. of Length of bar Wt. Of bar Quantity In


No. Discription bar in Bar in mm Kg/Mt Kg
mm

1 Distribution Steel( Main if 2 way) 10 21 5470 0.617 70.87

2 Main steel 10 34 4470 0.617 93.77

3 End Support Main steel (Top) 10 28 3120 0.617 53.90


10 34 3120 0.617 65.45

Dia of Quantitity of
Total Quantity of steel Kg.
Bar all beams
8 0 (Kg) 0.000
10 283.9989 283.999
12 0 0
16 0 0
20 0 0
25 0 0
32 0 0
Total 283.9989 283.99893

Project :-
Name of work :-

Sr. Discription No Length Width in Depth in Quantity in


No. in mm mm mm Cu.mts.
1 Concrete 1 5400 4400 150 3.564
Total Length
of Rebar

114.87

151.98

87.36
106.08
460.29