NQI SURABAYA
Polygon SBY01
September 2016
[Type the abstract of the document here. The abstract is typically a short summary of the contents of the
document. Type the abstract of the document here. The abstract is typically a short summary of the
contents of the document.]
[NQI SURABAYA POLYGON SBY01_ ACCEPTANCE REPORT]
1 Table of Contents
LIST OF FIGURES
LIST OF TABLES
Table 1. CET Target .................................................................................................................................. 5
Table 2. Drive Test KPI Target Design ................................................................................................... 6
Table 3. CET Result SBY-1 ...................................................................................................................... 7
Table 4. CET Spot Excelso Kertajaya Optimization Activities............................................................. 8
Table 5. CET Spot Kampus Unair B Optimization Activities ............................................................... 9
Table 6. CET Spot UNTAG Optimization Activities ............................................................................ 10
Table 7. CET Spot Lotte Mart Ngagel Optimization Activities ........................................................... 11
Table 8. CET Spot Raya Kertajaya Optimization Activities ............................................................... 12
Table 9. DT Result SBY-1....................................................................................................................... 13
Table 10. Optimization Activities area Kodam Wonokromo ........................................................... 20
Table 11. Optimization Activities area Manyar Menur Pumpungan .............................................. 21
Table 12. Optimization Activities area Kertajaya Indah ...................................................................... 22
Table 13. Optimization Activities area MERR Semampir................................................................... 23
Table 14. 2G RxLevel Bad Spot Justification Remark ....................................................................... 24
Table 15. 3G RSCP Bad Spot Justification Remark ........................................................................... 25
Table 16. 3G EcNo Bad Spot Justification Remark ............................................................................ 26
Table 17. 3G BLER PS Bad Spot Justification Remark ..................................................................... 27
Table 18. 4G RSRP Bad Spot Justification Remark ........................................................................... 28
Table 19. 4G SINR Bad Spot Justification Remark ............................................................................ 29
Table 20. 4G DL Throughput Bad Spot Justification Remark ........................................................... 30
1. Executive Summary
Huawei has been delivered E2E Network Quality Improvement Project in Surabaya region consist of
3 polygon belongs to Huawei (HTI).
During optimization period, there were a lot of activities that had been carried out to improve the
network performance. There are 2 Classification KPIs to be optimized, CET Result and Drive Test
Result.
Following activities have been proposed and executed during optimization period :
Hardware troubleshooting
Physical tuning including antenna down tilting and change of orientation
Bad spot improvement based on Drive Test
Parameter optimization
Audit neighbor list
New site integration (LTE)
Customer Experience Test Acceptance has been conducted and signed by XL AM and RSM Sales
(as attached).
2G Rx Level
BAND Level (dBm) COLOUR BASELINE AFTER - 2G Signal Strenght (-85) is Degrade from 98.89 % to 95.68
75 dBm 91.22% 81.82% %,Pass from target
-85 - -75 7.67% 13.86%
2G -95 - -85 1.05% 4.08%
-95 0.06% 0.24%
RxLevel -85 98.89% 95.68%
3G RSCP
BAND Level (dBm) COLOUR BASELINE AFTER - 3G Signal Strenght (-85) is Degrade from 95.64 % to 94.06
75 dBm 72.38% 72.48% %,Pass from target
-85 - -75 23.26% 21.58%
3G -95 - -85 4.25% 5.43%
-95 0.11% 0.52%
RSCP -85 95.64% 94.06%
4G RSRP
Mode Range (kbps) Colour BASELINE AFTER 4G Signal Strenght (-115) is Maintain from 99.99 % to 99.97 %,
85 dBm 50.61% 59.91% Pass from target
-90 to -85 19.86% 16.26%
-100 to -90 24.46% 19.28%
4G -110 to -100 4.93% 4.38%
-115 to -110 0.13% 0.14%
-115 0.00% 0.03%
RSRP >= -115 99.99% 99.98%
BAND Level (dBm) COLOUR BASELINE AFTER - 2G Network Quality (SQI) is improve from 81.95 % to 94.17 %
18 - 30 81.95% 94.17%
2G 0 - 18 15.90% 5.73%
<0 2.15% 0.11%
2G Rx Qual
BAND Level (dBm) COLOUR BASELINE AFTER - 2G Network Quality (SQI) is improve from 75.19 % to 85.69 %
>= 0 to < 4 75.19% 85.69%
2G >= 4 to < 7 21.33% 13.81%
>= 7 to < 9 3.48% 0.50%
3G EcNo
BAND Level (dBm) COLOUR BASELINE AFTER - 3G Signal Quality (-14) is Maintain from 95.56 % to 95.35 %,
10 dBm 66.77% 63.64% Pass from target
-14 - -10 28.79% 31.71%
3G -18 - -14 3.71% 4.21%
-18 0.73% 0.44%
EcNo -14 95.56% 95.35%
4G SINR
Mode Range (kbps) Colour BASELINE AFTER 4G Network Qaulity ( 0) is Maintain from 95.45 % to 95.79 %
20 dBm 12.58% 21.35%
10 to 20 44.35% 42.87%
5 to 10 25.24% 19.90%
4G 0 to 5 13.28% 11.68%
-5 to 0 0.0404 3.76%
-5 0.51% 0.45%
SINR >= 0 95.45% 95.79%
3G Downlink CS Bler
BAND Level (dBm) COLOUR BASELINE AFTER Bler CS ( 1) is Maintain from 99.22 % to 99.71 %,Improve from traget
>= 50 to < 100 0.01% 0.02%
>= 10 to < 50 0.09% 0.05%
Downlink
>= 1 to < 10 0.11% 2.32%
Bler CS
>= 0 to < 1 99.78% 97.62%
Bler CS >= 1 99.78% 97.62%
3G Downlink PS Bler
Mode Range (kbps) Colour BASELINE AFTER DL PS Bler ( 10 ) is Degrade from 83.97% to 80.21% Not improve
from target
30 to < 100 9.18% 9.95%
,
25 to < 30 0.99% 1.44%
20 to < 25 1.36% 1.60%
DownlinkB 15 to < 20 1.59% 2.00%
ler PS 10 to < 15 2.90% 4.81%
10 to < 5 3.12% 4.39%
0 to < 5 80.85% 75.82%
DL PS Bler > 10 83.97% 80.21%
3G DL Throughput
Mode Range (kbps) Colour BASELINE AFTER 3G HSDPA Average Throughput (1000 Kbps ) is improve from
1648.89 Kbps to 2383.25 Kbps
>= 1024 55.34% 69.55%
768 to 1024 9.25% 5.14%
512 to <768 8.12% 5.06%
3G DL 256 to 512 6.93% 4.15%
128 to 256 2.85% 2.00%
< 128 17.51% 14.09%
Average 1648. 2383.25
4G PDCP DL Throughput
Mode Range (kbps) Colour BASELINE AFTER 4G Average PDCP DL Throughput ( Info Only ) is improve from
30000 3.56% 22.49% 9050.26 Kbps to 21727.27 Kbps
20000 to 30000 7.16% 20.71%
10000 to 20000 19.83% 28.31%
4G DL
5000 to 10000 27.01% 13.52%
5000 42.45% 14.96%
Average 9050.26 21727.27
4G PDCP UL Throughput
Mode Range (kbps) Colour BASELINE AFTER 4G Average PDCP UL Throughput ( Info Only ) is improve from 10975.71
15000 26.76% 51.93% Kbps to 14207.4 Kbps
10000 to 15000 11.35% 21.17%
5000 to 10000 31.46% 10.90%
4G UL
2000 to 5000 11.50% 3.00%
2000 18.90% 13.00%
Average 10975.71 14207.4
Site Covered :
MC454C524E_LTE_KARANGREJO_WONOKROMO,MC454
C502E_LTE_JOYOBOYO_SURABAYA and
SINR Before SINR After 4541526E_LTE_WONOKROMO
Detail Analysis:
Bad RSRP and SINR on the area due to have overshoot
from site 454C903E_LTE_KODAM_BRAWIJAYA Sec 1 and
4541526E_LTE_WONOKROMO Sec 2
Optimization Done:
downtlit 454C903E_LTE_KODAM_BRAWIJAYA Sec 1 E3 to
E6 and 4541526E_LTE_WONOKROMO Sec 2 E6 to E8
Uptilt site
MC454C524E_LTE_KARANGREJO_WONOKROMO sec 3
from E8 to E6
new site LTE colo site
MC3544345G_3G_GAJAH_MADA_SBY (OA)
Site Covered :
4544336E_LTE_MANYAR_SABRANGAN
And 4541805E_LTE_PUCANGSEWU_SURABAYA
Detail Analysis:
RSRP Before RSRP After Bad SINR on the area due to no dominant site
serving
Optimization Done:
downtilt site
4544336E_LTE_MANYAR_SABRANGAN sec 1 from
E6 to E 8 and re azimuth 90 to 130
and site audit
4541805E_LTE_PUCANGSEWU_SURABAYA sec 1
from E2 to E6
Site Covered :
3541548G_3G_MEDOKAN,3544340G_3G_SEM
AMPIR_INDAH,3542833G_3G_RAYA_KEDUNG_
BARUK
Detail Analysis:
Bad EcNo due to missing neighbor from site
3541548G_3G_MEDOKAN Sec 1 to
3544340G_3G_SEMAMPIR_INDAH sec 3 and
3542833G_3G_RAYA_KEDUNG_BARUK Sec 1
Optimization Done:
EcNo Before EcNo After Audit neighbor site 3541548G_3G_MEDOKAN.
Done add relation from Sec 1 to
3544340G_3G_SEMAMPIR_INDAH sec 3 and
3542833G_3G_RAYA_KEDUNG_BARUK Sec 1
Before After
NWName Height
Dir Mech Elec Dir Mech Elec
MC354C540G_3G_KERTAJAYA_INDAH_SURABAYA 23 90 2 3 120 2 6
MC354C540G_3G_KERTAJAYA_INDAH_SURABAYA 23 210 2 3 210 2 6
MC354C540G_3G_KERTAJAYA_INDAH_SURABAYA 23 330 2 3 330 2 6
3544335G_3G_MANYAR_KERTOADI 37 125 2 5 60 2 6
3544335G_3G_MANYAR_KERTOADI 37 250 2 1 210 2 8
3544335G_3G_MANYAR_KERTOADI 37 325 2 4 300 2 6
Site Covered :
MC354C540G_3G_KERTAJAYA_INDAH_SURABAYA
Detail Analysis:
EcNo After Bad RSCP and EcNo due no dominant serving from
EcNo Before nearest site
MC354C540G_3G_KERTAJAYA_INDAH_SURABAYA
sec 3, and
SH354C728G_3G_BTS_HOTEL_KERTAJAYA_INDAH,
overshooting from
3544335G_3G_MANYAR_KERTOADI sec 3
Optimization Done:
Downtilt
MC354C540G_3G_KERTAJAYA_INDAH_SURABAYA
sec 3 from E3 to E6 and
3544335G_3G_MANYAR_KERTOADI sec 3 from E4 to
E6