Pressure Vessel Inspection and Test Plan Sample
Activity By Remark
No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document
Manuf. TPI Client

1 Pre-Inspection Meeting Spec. Spec. MOM H H H -

Before Manufacturing
DWG, Design, DWG,
2 ASME, Spec ASME, Spec H R A -
Calculation Document Calculation book
3 WPS&PQR ASME ASME IX Welding Book H R A -
Welder Qualification
4 ASME ASME IX Certificates H R - -
Certificates
5 NDT procedure ASME ASME V,VIII, IX Procedures H R A -
NDE Personnel
6 ASME ASME V Certificates H R - -
Certificates
PWHT Procedure
7 ASME ASME VIII Procedure H R A -
(if needed)
Hydro Static Test
8 ASME ASME VIII Procedure H R A -
Procedure
9 Painting Procedure ASME Spec. Procedure H R A -

Materials
Original Material
10 Material Certificates ASME ASME II Certificates H R - -
Storage of raw material
11 ASME ASME - H W - -
and Welding
Visual, Dimension and
12 ASME VIII ASME VIII Report H W - -
Marking Control

1
During Manufacturing
Transferring of marking
13 ASME VIII ASME VIII Report H SW - -
Material

Cutting & Edge


14 DWG DWG - H SW - -
Preparation

Head forming and


15 DWG DWG, ASME VIII Report H W - -
Dimension Check
Check of Rolling for
16 DWG DWG, ASME VIII - H SW - -
Shell
Check of Welding plan
17 DWG/WPS WPS/DWG - H SW - -
with WPS
Fit Up & welding ( shell
18 DWG/WPS WPS/DWG - H SW - -
to shell)

19 Second Rolling of Shell DWG DWG, ASME VIII Report H SW - -

Fit Up & welding ( head


20 DWG/WPS WPS/DWG - H SW - -
to shell)
Inspection of welds
ASME/NDT map/NDT
21 ( N.D.T shell to shell and ASME VIII Report H SW/R - -
Procedure
head)
Fit-Up, Welding of pipe
22 ASME/DWG ASME/DWG - H SW - -
to flange
ASME/Spec./NDT
23 RT (Pipe to flange) ASME VIII Report H R - -
Procedure/NDT Map
Marking ,Opening
24 DWG DWG - H W - -
Nozzles
Fit-Up, Welding (Nozzle to
25 WPS/DWG WPS/DWG - H W - -
Shell)
ASME/NDT map/NDT
26 PT, UT (Nozzle) Procedure ASME VIII Report

Fit-Up, Welding (Pad of


27 WPS/DWG WPS/DWG - H SW - -
shell)
Inspection for Fit-Up &
28 WPS/DWG WPS/DWG - H SW - -
Welding saddle & Lug
Visual & Dimensional
29 DWG/Spec. DWG - H W - -
Check
PWHT Online
30 PWHT(if needed) Procedure ASME VIII / Spec graph H H
Hardness measurement
31 Spec. ASME II Report H W
(if needed)

32 Hydrostatic Test Procedure ASME VIII Report H H W -

Final Inspection
Final Visual &
33 DWG/Spec. DWG Report H H - -
Dimensional Check
Surface Preparation and
34 Procedure SSSP/Spec. Report H W - -
Painting

35 Check of Name Plate DWG DWG - H SW - -


Submitted
36 Check of Final Book - Spec. DWG/ P.O H R by
Documentation

37 Inspection Reports - Spec./DWG Report H R - -

38 NCR - Spec./DWG Report H R

39 Review Final Data Report - Spec./DWG - H R

Packing
Marking Control &
40 - Spec. MOM H H - -
Release Note

41 Loading Inspection - Spec. - H H - -

Shipping Document
42 Procedure Spec. Packing List H R - -
Control

Abbreviations:

H: Hold Point = Hold on the production till TPI Inspector performs inspection and supervise the required test
W: Witness Point = Manufacture shall notify client and TPI Inspector but there is no hold on the production;
Client can waive this inspection based on his discretion and informs TPI Inspector accordingly.

R: Document Review = Review means Review document, which includes of material test certificates, WPS, PQR, NDT Procedures and etc.

A: Approval
SW: Spot Witness = for items with spot witness manufacture shall notify TPI inspector as fulfilling the monitoring;