Caltrans District 3 Projects Accelerated by SB 1

County

Route
Project Description Total Project Cost

$2.2 million project will resurface nearly three miles of State Route 70 north of Oroville with
Butte 70 $ 2,200,000
rubberized asphalt.
$11.6 million traffic management systems project will install 9.4 miles of cable for Intelligent
Butte 99 Transportation System elements that communicate to travelers with transportation information $ 11,636,000
on State Route 99 from Estates Drive to Garner Lane near Chico.
$2.8 million project will resurface 13.2 lane miles of U.S. Highway 50 near Placerville in El Dorado
El Dorado 50 $ 2,826,900
County.
$7.1 million project will resurface ten miles of U.S. Highway 50 between Cedar Grove and Riverton,
El Dorado 50 $ 7,100,000
east of Placerville with rubberized asphalt.
$6 million drainage project will repair culverts along State Route 49 from the Nevada/Placer
Nevada/Placer 49 County line to north of Lime Kiln Road in Nevada County, and along SR-49 at Fresh Air Lane and $ 5,992,000
Lone Star Road in Placer County.
$5.4 million drainage project will repair culverts along Interstate 80 from Secret Town
Placer 80 $ 5,386,000
Overcrossing to the Gold Run Safety Roadside Rest Area in Placer County.
$267.4 million pavement replacement project will improve 67 lane miles of Interstate 5 from
Sacramento 5 $ 267,400,000
Cosumnes River Boulevard to the American River Bridge in the city of Sacramento.
$247.2 million bridge project will improve truck carrying capacity at the South Connector
Sacramento 5 Undercrossing on Interstate 5 from U.S. Highway 50 to I-80, and the American River Viaduct on I-5 $ 247,230,000
in the city of Sacramento.
$156.8 million bridge project will strengthen to improve truck carrying capacity at the West End
Sacramento 5 $ 156,800,000
Viaduct on Interstate 5 in the city of Sacramento to allow permit loads.
$7.6 million project will resurface nearly 11 miles of U.S. Highway 50 between Rancho Cordova and
Sacramento 50 $ 7,600,000
El Dorado Hills.

Page 1 of 3
Caltrans District 3 Projects Accelerated by SB 1

County

Route
Project Description Total Project Cost

$278.3 million pavement preservation project will improve 56 lane miles on U.S. Highway 50 from
Sacramento 50 $ 278,300,000
Interstate 5 to Watt Avenue Overcrossing in the city of Sacramento.

$18.2 million pavement preservation project will improve 35.6 lane miles on Interstate 80 from
Sacramento 80 $ 18,230,000
east of Longview Drive to east of Madison Avenue near the city of Sacramento.
$5 million project will install ramp meters on Interstate 5 at the I-5/State Route 99 interchange
Sacramento 5/ 160 connector ramps, and on SR-160 at the eastbound SR-51/SR-160 interchange connector ramp in $ 5,040,000
the city of Sacramento.
$12.2 million traffic management systems project will install 14 miles of fiber optic cable along
Sacramento 99 & 51 State Route 99 from Grant Line Road to U.S. Highway 50/State Route 51 Jct., and on SR-51 from US- $ 12,150,000
50 to south of the Fort Sutter Viaduct in Sacramento County.
$7 million project will install over 12 miles of fiber optic cable and a new Intelligent Transportation
Sacramento/ El System on U.S. Highway 50 from Sunrise Boulevard in Sacramento County to the Sacramento/El
50 $ 7,021,000
Dorado Dorado County line, and on US-50 from the Sacramento/El Dorado County line to Silva Valley
Parkway in El Dorado County.
$20 million pavement preservation project will improve 4.8 lane miles on State Route 99 from
Sutter 99 $ 20,050,000
north of Coleman Avenue to north of Ramsdell Drive in Live Oak.
$2.1 million project will repair and resurface various sections of Interstate 5 north of Woodland in
Yolo 5 $ 2,120,000
Yolo County.
$18.3 million bridge project will increase vertical clearance to improve freight movement on
Yolo 5 Interstate 5 at the Wye Line Road Overcrossing, County Road 6 Overcrossing, and County Line $ 18,315,000
Road Overcrossing in Yolo County.
$12.5 million project will install 7 ramp meters along Interstate 80 at various locations in Yolo and
Yolo & Sacramento 80 $ 12,454,000
Sacramento Counties.

Page 2 of 3
Caltrans District 3 Projects Accelerated by SB 1

County

Route
Project Description Total Project Cost

$22.5 million bridge project will increase vertical clearance to improve freight movement on
Interstate 5 at the Country 96 Overcrossing, County Road 95 Overcrossing and Zamora
Yolo/ Colusa 5 $ 22,490,000
Overcrossing in Yolo County, and on I-5 at the E Street Overcrossing and Lurline Avenue
Overcrossing in Colusa County.
Estimated Total Project Cost: $ 1,110,340,900