FIELD Quality plan

Contractors Name
KEC WATERLEAU
(JV) ITEM : CIVIL QP NO. 1 PROJECT: Sewage Treatment Plants at Doddabele,Yellamalappachetty
Work Rev.N 0 and Intermediate Sewage pumping Station and Pumping
o. Mains at Sadarmangala
Date:- Contract S1e
No.

Aggregate Impact Value


As per IS 2386 Part - 4
DATE :
AGENCY :
SAMPLE No :
Assign No & Date :
MATERIAL : Aggregate
SOURCE :
QUANTITY :
LOCATION :
TESTED ON :

Trial Trial Trial


DESCRIPTION
No.1 No.2 No.3
Weight of surface dry sample passing 12.5mm and retained on 10mm
IS sieves, W1

Weight of fraction passing 2.36mm IS sieve, after the test W2

Weight of fraction retained on 2.36mm IS sieve, after test W3

W4 = W1 - (W2+W3)

A.I.V = ( W2/W1) x 100

Average value of A.I.V.

Note: if W4 > 1g discard and retest

Tested By:

Remarks:

__________ ________________ _ __________________


For KEC Waterleu For (CCD) For (FQA)