metrado de cimiento

DESCRIPCION N° DE VECES LARGO ANCHO ALTO PARCIAL TOTAL


eje 1Y4 de A-H 2 17 0.5 0.8 13.6
EJE 2 DE A-H 1 12.06 0.5 0.8 4.824 33.76
EJE 3 DE A-H 1 4.93 0.5 0.8 1.972
EJE A-H DE 1-2 8 2.28 0.5 0.8 7.296
EJE B´DE A-2 1 2.7 0.5 0.8 1.08
EJE H DE 3-4 1 3.23 0.5 0.8 1.292
EJE FYG DE 3-4 2 2.13 0.5 0.8 1.704
EJE B DE 3-4 1 3.23 0.5 0.8 1.292
EJE A DE 3-4 1 1.75 0.5 0.8 0.7
CONCRETO EN ZAPATAS

ZAPATA Z1 4 0.8 0.8 0.4 1.024 5.52375


VIGAS CIMENT. 2 3.7 0.25 0.4 0.74
COLUMNAS .25X.25 14 0.25 0.25 2.7 2.3625
COLUMNAS .25X.45 6 0.45 0.15 2.7 1.0935
COLUMNAS .25X.15 3 0.25 0.15 2.7 0.30375
SOBRECIMIENTO CONCRETO
EJE 1 DE ABC 1 5.8 0.15 0.4 0.348 5.3394
EJE 1 DE CDE 1 5.16 0.25 0.4 0.516
EJE 1 DE G-H 1 5.35 0.15 0.4 0.321
EJE 2 DE A-H 1 11.11 0.25 0.4 1.111
EJE 3DE 1 4.5 0.15 0.4 0.27
EJE 4 DE A-H 1 15.46 0.15 0.4 0.9276
EJE H DE 1-2 1 2.65 0.25 0.4 0.265
EJE H DE 2-4 1 3.45 0.15 0.4 0.207
EJE E-F DE 3-4 2 2.65 0.15 0.4 0.318
EJE E´DE1-2 1 2.75 0.15 0.4 0.165
EJE E DE 1-2 1 2.65 0.25 0.4 0.265
EJE C-D DE 1-2 2 2.65 0.15 0.4 0.318
EJE B´DE 1-2 1 3 0.15 0.4 0.18
EJE A DE 3-4 1 2.13 0.15 0.4 0.1278

ACERO SOBRECIMIENTO
EJE 1 4 6.6 26.4 3
ESTRIBOS 27 1 27 3
EJE 1 4 6.3 25.2 3
ESTRIBOS 14 1 14 1.5
EJE 1 4 6.7 26.8 3
ESTRIBOS 28 1 28 3
EJE 2 DEG-H 4 3.2 12.8 2
ESTRIBOS 13 1 13 1.5
EJE 2 DE A-B 4 4.5 18 2
ESTRIBOS 20 1 20 2.5
EJE 4 DE A-H 4 19.4 77.6 9
ESTRIBOS 80 1 80 9
EJE H DE 1-2 8 3.55 28.4 3.5
ESTRIBOS 14 1 14 1.5
EJE H DE 2-4 4 4.5 18 2
ESTRIBOS 20 1 20 2.5
EJE G DE 3-4 4 3.35 13.4 1.5
ESTRIBOS 14 1 14 1.5
EJE C DE 1-2 4 3.55 14.2 1.5
ESTRIBOS 14 1 14 1.5
ACERO EN COLUMNAS 25X25 92
ESTRIBOS 28
COLUMNA 45X15 12
15X25 3.5
VIGA CIMENTACION 4
ESTRIBOS 4

ACERO ZAPATA 4 VARILLAS


LARGO ALTURA
MURO CABEZA 16.87 2.6 43.862 50.012 85
2.3 0.9 2.07
1.2 2.5 3
1.2 0.9 1.08
SOGA
47.7 2.6 124.02 137.77 45
5.5 2.5 13.75

CEMENTO
CANTIDAD M3
M3 CEMENTO 3.5 33.76 118.16
HORMIGON 0.9 30.384
PIEDRA 0.5 16.88

M3 CEMENTO 8.5 5.53 47.005


ARENA 0.6 3.318
CONFITILLO 0.8 4.424

M3
CEMENTO 8.5 5.34 45.39
HORMIGON 0.6 3.204

VARILLAS 3/8" 70.5 VAR. 3/8"


VARILLAS 1/4" 32 VAR.1/4"
VARILLAS 3/8"
VARILLAS 1/4"
VARILLAS 3/8"
VARILLAS 1/4"
VARILLAS 3/8"
VARILLAS 1/4"
VARILLAS 3/8"
VARILLAS 1/4"
VARILLAS 3/8"
VARILLAS 1/4"
VARILLAS 3/8"
VARILLAS 1/4"
VARILLAS 3/8"
VARILLAS 1/4"
VARILLAS 3/8"
VARILLAS 1/4"
VARILLAS 3/8"
VARILLAS 1/4"
VARILLAS 1/2"
VARILLAS 3/8"
VARILLAS 3/8"
VARILLAS 1/4"
VARILLAS 3/8"
VARILLAS 1/4"

4251.02 TOTAL MILLAR


10450.67 10.5 LADRILLO

6199.65

80 BOLSAS
RELACION DE MATERIALES

CEMENTO 180 BLS


ARENA 10 M3
PIEDRA 15 M3
CONFITILLO 5 M3
LADRILLO 10.5 MILAR
HORMIGON 34
ALAMBRE 100 KG
CLAVOS 10 KG 2"
CLAVOS 5 KG 3"
VARILLA 92 VAR. 5/8"
VARILLA 3/8" 35 VAR. 3/8"
VARILLA 1/4" 40 VAR. 1/4"
ALAMBRE 8 20 KG