220/66kV ITI S/s

S.N Submissi Engg Action


O Drawings Required Very Urgent on Date Remarks by
CIVIL Drawings
Complete Super Structure for CRB Cum 66kV GIS Approved
cum Control Room Building.

(i) Layout & Detail of Lintel Beam for CR Building


(ii) Layout & Detail of Staircase for 66kV GIS cum Shall be Sankar
CR Building submitted Pajamal
progressive e
(iii)Layout & Detail of Beam at Corbel level and ly latest by
Platform Details 15.12.2017
14.12.20
(iv)Layout & Detail of Beam and Slab at 17
Roof level

(v) Layout & Details of Terrace & Mumty Beam &


1 Slab for CR Building
(vi) Layout & Details of 1st Floor Beam and Slab Civil details Sankar
for CR Building shall be Pajamal
submitted e
(vii) Layout & Details of 2nd Floor Beam and Slab by
for CR Building 26.12.2017.
Indoor Sankar
cable Pajamal
trench e
routing is
under
finalization
and
discussion
with KPTCL.
Submission
expected
by
13.12.2017.
Standard
Cable
trench
section is
already
20.12.20 approved.
2 220 KV GIS Floor with Indoor Trench Details 17 Same shall
be
followed.
Civil details
of GIS
foundation
with floor
shall be
submitted
by
20.12.2017
Expected Sankar
submission Pajamal
RCC Details for GIB DUCT Foundations - 20.12.20 by 22.12.20 e
3 220 & 66kV GIS 17 17
Indoor Sankar
cable Pajamal
trench e
routing is
under
finalization
and
discussion
with KPTCL.
Submission
expected
by
13.12.2017.
Standard
Cable
trench
section is
already
approved.
Same shall
be
followed.
Civil details
of GIS
foundation
with floor
shall be
submitted
66 KV GIS Floor cum CRB Floor with indoor 20.12.20 by
4 Trench Details 17 20.12.2017
66KV NGEF Equipment Foundation Drawings -CT, 25.12.20 SCF
5 CB, ISO, LA, BPI, CTTS. 17 and Structu
re height
data
expected
from
electrical
by
19.12.2017.
Structure/ Ramann
Foundation a
design and Menda/
drgs shall Sankar
be Pajamal
submitted e
by
26.12.2017.

Structure
drawings
shall be
submitted
66kv Structure Drawing for 66kv CT, LA, ISO, CTS, 25.12.20 by
6 BPI 17 09.01.2018.
This Sankar
foundation Pajamal
is coming e
in existing
substation
area and
constructio
n may not
be feasible
as of now.
Expected
submission
22.12.20 by
7 31.5 MVA Transformer Foundation Drawing 17 10.01.2018
Approval Venkatara
mani/
of
Sankar
Transforme Pajamale
r GA
drawings
22.12.20 expected
8 150 MVA Transformer drawing 17 by
15.12.2017.
Civil design
and drgs
shall be
submitted
by
22.12.2017
Vendor SCM –
drawings Tanvi/
are still Praful
awaited. Ci
vil design
and drgs
shall be
submitted
by within a
week of
receipt of
25.12.20 approved
9 Auxiliary Transformer Foundation Drawings 17 GA drg.
Vendor has Project
not been team/
finalized Nagaraj
due to a G.
pending
inputs from
KPTCL. Civil
design and
drgs shall
be
submitted
by within a
week of
receipt of
25.12.20 approved
10 Capacitor Bank Panel Foundation Drawing 17 GA drg.
Adoption Project
of already team/
66kV Cable Termination Tower Foundation 02.01.20 erected Nagaraj
11 Drawing 18 tower a G.
foundation Project
to be taken team/
up by Nagaraj
220kV Cable Termination Tower Foundation 02.01.20 projects at a G.
12 Drawing 18 Bangalore.
Electrical Drawings
Shall Ramann
be submitt a Menda
20.12.20 ed by
1 66 KV CT Vendor Drawing 17 13.12.2017
Shall Ramann
be submitt a Menda
18.12.20 ed by
2 Outdoor Cable Trench route layout Drawing 17 13.12.2017
Vendor SCM -
22.12.20 drawings Tanvi/
3 Auxiliary Transformer Drawings 17 are awaited Praful
Vendor SCM -
28.12.20 drawings Tanvi/
4 ACDB Drawing 17 are awaited Praful
Shall Ramann
be submitt a Menda
28.12.20 ed by
5 Battery Charger Drawing 17 13.12.2017
Revised SCM -
drawings Tanvi/
are awaited Praful
18.12.20 from
6 EOT Crane Drawing 17 Vendor.
20.12.20 Indoor
7 220 KV GIS building Indoor Trench routing layout 17 cable
trench
routing is
under
finalization
Ramann
and
a Menda
discussion
with KPTCL.
Submission
expected
66 KV GIS cum CR Building Indoor Trench 20.12.20 by
8 routing layout 17 13.12.2017
Vendor SCM -
drawings Tanvi/
still Praful
9 Auxiliary Transformer Drawings awaited
Vendor has Project
not been team/
10 Capacitor Bank Panel Drawings finalized
due to Nagaraj
pending a G.
inputs from
KPTCL.
Vendor
drawings
still
awaited

Dear sir,

As per the Site requirement, we required Out Door Power Distribution Box for providing Power Supply
to the SBU, sub-contractor & 2 Nos. Bore-well Pump for the Construction Activities and Water facilities for
Site .

The panel board consists of

1.Bus Chamber R,Y,B,N

2.125 AMPS Incomer 4 pole MCCB

3.5 outgoing Feeders with MCCB (1 Nos- 100 Amps,2 Nos-63 Amps,2Nos-40Amps).