 Design Studio 3 – WS 2010/2011 
Dept. Architecture, UPH 
 

Calendar Studio Agenda

Month Week Day/Date Topic Task Output


 
Aug  01  M/16  Project 01 Briefing     
  W/18  Appreciating Kemang Context  Mapping and data processing  Sketches, photographs, audio 
“Role and relationships of Kemang  records, video 
area to its strategic context” 
02  M/23  Presentation ‐ Group Survey Report   
  W/25  Appreciating Kemang Context  Mapping and data processing   
“Urban structure of Kemang area” 
03  M/30  Analysis of Proposed Program  Define Potencies of Kemang area   

Define some appropriate program 
to develop relative to the context 

Define several keywords about 
Kemang. Te keywords will be 
applied into Design Vehicle (DV) 
Sep    W/1  Presentation – Appreciating Context   
04  M/6  Site and Program Analysis  Site Analysis   
Study of Similar Building/Programs 
Site Zoning 
Building Massing 
Site Analysis 
Study of Similar Building/Programs 
Keywords to Design vehicle 01 
  W/8  Space Programming  Siteplan   

  
 
Stupa 3 ‐ August‐October 2010 tutor by danihermawan | 1 
 
Arch. Design Studio 3 – WS 2010/2011 
Dept. Architecture, UPH 
 

Calendar Studio Agenda

Month Week Day/Date Topic Task Output


 
Space requirement of Proposed 
Program 
Program’s Flow of activities 
Organization of space 
Building Massing 
Design Vehicle 
05  M/13  Conceptual Design  Schematic Design – Plans   
Schematic Design – Elevations 
Schematic Design – Sections 
Schematic Design – Atmospheric 
Drawing 
Schematic Design ‐ Landscape 
Design Vehicle 
  W/15  Conceptual Design  Schematic Design – Plans   
Schematic Design – Elevations 
Schematic Design – Sections 
Schematic Design – Atmospheric 
Drawing 
Design Model 
Design Vehicle 
06  M/20  Presentation ‐ Cross Review    
  W/22  Design Development  Design Development‐ Plans   
Design Development – Elevations 
Design Development – Sections 
Design Development – 
  
 
Stupa 3 ‐ August‐October 2010 tutor by danihermawan | 2 
 
Arch. Design Studio 3 – WS 2010/2011 
Dept. Architecture, UPH 
 

Calendar Studio Agenda

Month Week Day/Date Topic Task Output


 
Atmospheric Drawing 
Design Model 
Design Vehicle 
07  M/27  Design Development  Architectural Details‐ Principle   
Building Section 
Architectural Details – Tectonically 
Details 
Architectural Details – Exploded 
Iso/Axonometric Drawing 
Model Fabrication 
Atmospheric Drawing 
Design Vehicle 
  W/29  Design Product Finalizing  Presentation Board   
Model Fabrication 
Design Report 
Animation (optional) 
Oct  08  M/4  Project Submission   
 
 
    W/6  MidTerm Presentation – Project 01   
 
 
 

  
 
Stupa 3 ‐ August‐October 2010 tutor by danihermawan | 3 
 