Analysis of Factors Contributing to Time Overruns on Road Construction Projects under Addis Ababa City Admini
der Addis Ababa City Administration
Investigator YearCountry Basic causes of raod
Main causes of the cost overrun in  inflationary increase in material cost,
Sunday et al. 2012 construction projects in Nigeria

 inaccurate materials estimation


 underestimating of project costs
 increase in project scope among others

Main causes of the cost overrun in  estimated costs


Rauzana 2016 construction projects in Indonesia

 Implementation and working relationships

Causes of the cost overrun in Indian  delay in preliminary handing over of project
NaveenKumar 2016 construction projects
 wrong/inappropriate choice of site
 inadequate project preparation
 increment of material prices
 resources constraint
 unpredictable weather conditions
 fluctuations in the cost of materials
 equipment allocation problems
 lack of cost reports  design changes

 high transportation cost


Causes of the cost overrun in Indian  change in material specification
Patil and Pankaj 2016
construction projects
 escalation of material price
 frequent breakdown of construction plants and equipment’s, and rework

Chitkara 2011  poor planning for implementation


 Inadequate project formulation
 Lack of proper contract planning and management  Lack of project management during

Saraf 2013  improper planning


 improper designing
 site management decision making
 construction methods
 shortage of labour and technical personnel
 construction mistakes and defective work quality and shortage of materials and producti

 Subramani et al. 2014  slow decision making


 Poor design/delay in providing design

Tejale et al. 2015

 material shortage
 shortage of labor
 unavailability of competent staf
 late delivery of materials and equipment
 low productivity level of labour and Quality of equipment and raw material

Nega 2008  inflation or increase in the cost of construction material


 lack of planning and co-ordination
 fluctuations in the cost of labour
 insufficient geotechnical investigation
 additional costs due to variations work
 change in foreign exchange rate
 change orders
 costs due to special risks
 delay of drawings changes in plans and drawings

 Belachew et al. 2017  material price fluctuation


 cost underestimation
 delay in supply of raw materials and

protracted financial processes in


client organisations
the delayed release of funds by client
organisations.
Contract modification
was ranked forth at 57%
International Journal of Project
Management 27 (2009) 522–531, while economic hardships
Cost escalation and schedule delays changes inprocurement
Material and
Kaliba et al 2008 drawings
in road construction equipment unavailability,
projects in Zambia poor supervision,
construction mistakes,
poor coordination on site and changes in
specifications
labour disputes were least
among the major causes of schedule delays
Payment by client (RII = 0.759); Slow decision-
making
and bureaucracy in client organization (RII =
0.699); Claims
(RII = 0.609); Inadequate planning / scheduling (RII
American jouranl of ciivl engrnring , =and
0.602);
Rain (RII = 0.579). The ten most important
An Investigation into Factors
Msafiri Atibu Seboru 2015 views of the
Causing Delays in Road consultants are shown in Table 2. The top five
Construction Projects in Kenya causes of dela: Payment by client (RII =
0.738); Slow decision-making and bureaucracy in
client
organization (RII = 0.595); Inadequate planning /
scheduling
(RII = 0.595); Diferent site conditions (RII = 0.583);
Common Factors Contributing for TimeOverrun
from Contractors View(progress payments delay
by owner,inaccurate cost estimation,
Analysis of Factors Contributing to supply of material)
Time Overruns Common Factors Contributing for Time Overrun
on Road Construction Projects from Consultants View(progress payments delay
under Addis Ababa by owner ,Inflation, delay in commencement ,
City Administration, International contractors financial problems)
Siraw Yenesew Tesfa 2015 Journal of Science and Research Common Factors Contributing for Time Overrun
(IJSR) from Owners View(slow cite
ISSN (Online): 2319-7064 clearance,contractors financial problems,Inflation
Index Copernicus Value (2013): 6.14 ,exchange rate fluctuation ,supply of
| Impact Factor (2015): 6.391 material,nadequate contractors experience ,low
productivity of labor ,inaccurate cost
estimation,poor resource management,improper
planning)

Factors Afecting Completion of


Road Construction Projects in
Nairobi City County: Case Study of Project Managers Competency
David Ndiang’ui Wambui1, Dr. Kenya Urban Roads Authority Project Technology
Kepha Ombui2, Dr. Assumptah 2015 (KURA),International Journal of Project Managers CompeteProject Technology
Kagiri3 Scientific and Research Project funds
Publications, Volume 5, Issue 11, Project Equipment
November 2015 525
ISSN 2250-3153
FACTORS INFLUENCING
SUCCESSFUL COMPLETION OF
ROAD
CONSTRUCTION PROJECTS IN procurement process
Bernard Odhiambo Ogutu KENYA: THE CASE OF KISUMU corrupt practices, awarding the lowest bidder,
2014
Willy Muturi COUNTY,International Journal of Delay in decistion making
Economics, Commerce and Risk management
Management
United Kingdom Vol. V, Issue 6, June
2017

Causes of Delay in Road


Construction Projects, JOURNAL OF Award Project to Lowest Bid Price
Ibrahim Mahamid1; Amund Jul-12 MANAGEMENT IN ENGINEERING © Shortage Payments
Progress Delay by Owner
Bruland2; and Nabil Dmaidi3 of Equipment
ASCE /

Causes and Efects of Variations in


Ethiopian Federal
Road Projects, A Thesis Submitted
to School of Graduate Studies of
Addis Ababa University Change in defined scope
Lack of proper planning
By in Partial Fulfillment of the
2009 Lack of proper evaluation of tender documents at
Tadesse Ayalew Requirements of the Degree of tendering phase by contractors
Master of Science Contractor’s financial problems
in Civil Engineering
(Construction Technology and
Management Major)
Assessment on Performance and
Challenges of Ethiopian procurement process
Construction Industry, Journal of
Tadesse AYALEW1, Zakaria corrupt practices, awarding the lowest bidder,
2016 Architecture and Civil Engineering
DAKHLI2, Zoubeir LAFHAJ2* Delay in decistion making
Volume 2 ~ Issue 11 (2016) pp: 01- Risk management
11
ISSN(Online) : 2321-8193

CAUSES OF DELAYS IN
CONSTRUCTION PROJECTS IN “design and material changes”
Aynur Kazaz1, Serdar TURKEY, JOURNAL OF CIVIL “delay of payments” and “cash flow problems”.
Ulubeyli2, Nihan Avcioglu 2012 ENGINEERING AND MANAGEMENT “Contractor’s financial problems” and “poor labor
Tuncbilekli3 ISSN 1392-3730 print/ISSN 1822- productivity”
3605 online
2012 Volume 18(3): 426–435

Contractor’s improper planning


Contractor’s poor site management
Inadequate contractor experience
Causes and efects of delays in Client’s finance and payments for completed work
Malaysian construction industry
Murali Sambasivan *, Yau Wen 2007 Murali Sambasivan *,International Shortage inwith
Problems subcontractors
Soon material
Journal of Project Management 25 Labor supply
(2007) 517–526 Equipment availability and failure
Lack of communication between parties
Analysis of Causes of Delay and
Time Performance in Construction
Projects in Indonesia, IOSR Journal
of Mechanical and Civil Engineering
Anita Rauzana 2016 (IOSR-JMCE) Social and cultural factors
e-ISSN: 2278-1684,p-ISSN: 2320-
334X, Volume 13, Issue 5 Ver. III
(Sep. - Oct. 2016), PP 116-121
www.iosrjournals.org

contractor’s side, financial problems are the major


factor in
delaying construction projects. Poor site
management and, as a consequence,
The significant factors causing delay construction mistakes, delay in the delivery of
materials to the site, and coordination
Wa’el Alaghbari, Mohd. Razali of building construction problem were the subsequent factors causing
A. Kadir, Azizah Salim and 2014 projects in Malaysia Building delay in construction projects in
Ernawati construction in Malaysia,Building Malaysia. The next most important factors causing
construction in Malaysia delay in construction projects in
Malaysia come from the labour side, and finally
the contractor’s side, summarized by
“lack of subcontractor’s skills” and “lack of site
contractor’s staf”.
FACTORS INFLUENCING
COMPLETION OF CONSTRUCTION
PROJECTS; A CASE OF
CONSTRUCTION PROJECTS IN Natural factors like weather
NAIROBI KENYA, Research Project iii. Project complexity
SHAMMAH KITEME MUNYOKI 2014 report is submitted in Partial iv. Client intelligence
Fulfillment of the Requirements for v. Accurate program of works
the Master of Arts degree in Project
Planning and Management in the
University of Nairobi.
The results indicated that the average delay
because
of closures leading to materials shortage was the
most
important performance factor, as it has the first
rank
among all factors from the perspectives of
owners, consultants,
and contractors. This agreement between all
target groups is traced to the difficult political
situation
FACTORS AFFECTING THE
PERFORMANCE OF CONSTRUCTION from which the Gaza Strip sufers. The most
important
Adnan Enshassi1, Sherif PROJECTS IN THE GAZA STRIP,
JOURNAL OF CIVIL ENGINEERING factors agreed by the owners, consultants, and
Mohamed2, Saleh 2009 contractors
Abushaban3 AND MANAGEMENT
2009 as the main factors afecting the performance of
construction
15(3): 269–280 projects in the Gaza Strip were: escalation of
material
prices, availability of resources as planned through
project duration, average delay because of
closures leading
to materials shortage, availability of personnel
with
a high experience and qualifications, quality of
equipment and raw materials in project, and
leadership
skills for project managers.
, and rework

project management during execution

ge of materials and productivity

nd raw material