Analysis of Factors Contributing to Time Overruns on Road Construction Projects under Addis Ababa City Admini
der Addis Ababa City Administration
Investigator YearCountry Basic causes of raod
Main causes of the cost overrun in inflationary increase in material cost,
Sunday et al. 2012 construction projects in Nigeria
Causes of the cost overrun in Indian delay in preliminary handing over of project
NaveenKumar 2016 construction projects
wrong/inappropriate choice of site
inadequate project preparation
increment of material prices
resources constraint
unpredictable weather conditions
fluctuations in the cost of materials
equipment allocation problems
lack of cost reports design changes
material shortage
shortage of labor
unavailability of competent staf
late delivery of materials and equipment
low productivity level of labour and Quality of equipment and raw material
CAUSES OF DELAYS IN
CONSTRUCTION PROJECTS IN “design and material changes”
Aynur Kazaz1, Serdar TURKEY, JOURNAL OF CIVIL “delay of payments” and “cash flow problems”.
Ulubeyli2, Nihan Avcioglu 2012 ENGINEERING AND MANAGEMENT “Contractor’s financial problems” and “poor labor
Tuncbilekli3 ISSN 1392-3730 print/ISSN 1822- productivity”
3605 online
2012 Volume 18(3): 426–435
nd raw material