You are on page 1of 9

Prepared by : Contract: PTB5-02/03-1706 From km Form

SEAL WORK Route: DR08560 3.400 AB 7


Section: ROAD BETWEEN STERKSPRUIT-TELLEBRIDGE (01/1993)
Date: Carriageway: FULL WIDTH To km Sheet no
Seal type: CAPE SEAL 6.600 2 of 7

Section 3.400 3.600 3.800 4.000 4.200 4.400 4.600 4.800 5.000 5.200 5.400 5.600 5.800 6.000 6.200 6.400 6.60

Date opened to traffic


Permeability (l/h)

Type Appl. Strip


Slurry Total : full width m. m.
(kg/m2) (m2/m3) * R: m. m. (125m²/m³)(5.9%) (125m²/m³)(5.9%) (125m²/m³)(5.9%)
and TEXTURE SLURRY L : m. m.
Binder cont obtained (Date) R: m. m. 19/03/2005) 19/03/2005) 19/02/2005)
RALUMAC L1 : m. m.
(Date) L2 : m. m.
Recommended hot Nett appl. (l/m2) 1.5 (ℓ/m²) 1.35 (ℓ/m²) 1.43(ℓ/m²) 1.35 (ℓ/m²) 1.5
Design - Tol. // Design + Tol. (l/m2) 1.47 // 1.53 (ℓ/m²) 1.32 // 1.38 (ℓ/m²) 1.40 // 1.46 1.32 // 1.38 (ℓ/m²)
m. m.
Total cold Nett Obtained m. m.
m. m.
m. m.
Final Spray Type // Grade. // Source // Appl. STABLE MIX ANOINIC 60 DILUTED WITH 50% OF WATER- BLOEMFONTEIN- 1ℓ/m²
6 m. 9 m. 1.0(16/03/2005) 1.0(18/03/2005) 0.98(19/03/2004) 1.0(1/03/2005) 1.1(10/12/2004)
l/m2 Actual Obtained 3 m. 6 m. 1.0(16/03/2005) 1.0(18/03/2005) 0.98(19/03/2004) 1.0(1/03/2005) 1.1(10/12/2004)
Cold * 0 m. 3 m. 1.0(16/03/2005) 1.0(18/03/2005) 0.98(19/03/2004) 1.0(1/03/2005) 1.1(10/12/2004)
Hot* (Date ) m. m.
Aggr. Type // Size // Source // Appl.
2 nd Layer m. m.
Actual Obtained m. m.
(m2 / m3) m. m.
(Date) m. m.
2 nd Spray / Type // Size // Source // Appl.
m. m.
l/m2 Actual Obtained m. m.
m. m.
Hot * (Date) m. m.
Aggr. Type // Size // Source // Appl. Blue Dolerite -19mm chrushed stone - Quarry 5.3 - 83m²/m³
1 st Layer m. m. 88(16/3/2005) 85(17/03/2005) 90(17/03/2005) 93 103 83 90(29/03/05) 81(30/03/05) 86(30/03/2005)
Actual Obtained m. m. 86(16/3/2005) 93(17/03/2005) 90(17/03/2005) 81 84 74 90(29/03/05) 81(30/03/05) 84(30/03/2005)
(m2 / m3) m. m. 86(16/3/2005) 93(17/03/2005) 90(17/03/2005) 81 84 74 90(29/03/05) 81(30/03/05) 81(30/03/2005)
(Date) m. m.
1 st Spray / Type // Size // Source // Appl. 80/100 Penetration Bit - Bloemfontein - 1.5ℓ/m²
5.4 m. 8.4 m. 1.49(16/03/2005) 1.51(17/03/2005) 1.52(17/03/2005) 1.33 1.4 1.45 1.36(29/03/05) 1.36(30/03/05) 1.36(30/03/2005)
l/m2 Actual Obtained 2.7 m. 5.4 m. 1.51(16/03/2005) 1.46(17/03/2005) 1.51(17/03/2005) 1.39 1.3 1.43 1.36(29/03/05) 1.36(30/03/05) 1.38(30/03/2005)
0 m. 2.7 m. 1.51(16/03/2005) 1.48(17/03/2005) 1.51(17/03/2005) 1.39 1.3 1.43 1.36(29/03/05) 1.36(30/03/05) 1.38(30/03/2005)
Hot * (Date) m. m.
MC after prime (c / s)
Type // Size // Source // Appl. 3/12 TRH PRIME - BLOEMFONTEIN - 0.8ℓ/m²
Fogspray Slow Shoulder 6.8 m. 10.2 m. 0.8(10/03/2005) 0.81 (21/03/2005) 0.8 (08/03/2005)
Actual Obtained 3.4 m. 6.8 m. 0.8(10/03/2005) 0.81(21/03/2005) 0.8 (08/03/2005)
l/m2 0 m. 3.4 m. 0.8(10/03/2005) 0.81(21/03/2005) 0.8 (08/03/2005)
(Date) m. m.
MC before prime (c / s)

Section (km) 3.40 3.60 3.80 4.00 4.20 4.40 4.60 4.80 5.00 5.20 5.40 5.60 5.80 6.00 6.20 6.400 6.600

* Delete if not applicable


Prepared by : Contract: PTB5-02/03-1706 From km Form
SEAL WORK Route: DR08560 16.200 AB 7
AFRICON Section: ROAD BETWEEN STERKSPRUIT-TELLEBRIDGE (01/1993)
Date: Carriageway: FULL WIDTH To km Sheet no
12/04/2005 Seal type: CAPE SEAL 19.400 6 of 7

Section 16.200 16.400 16.600 16.800 17.000 17.200 17.400 17.600 17.800 18.000 18.200 18.400 18.600 18.800 19.000 19.200 19.400

Date opened to traffic


Permeability (l/h)

Type Appl. Strip


Slurry Total : full width m. m.
121/5.9 (146m²/m³)(5.9%) (123m²/m³)(5.9%) (122m²/m³)(5.9%) (127m²/m³)(5.9%) (130m²/m³)(5.9%)
(kg/m2) (m2/m3) * R: m. m.
and TEXTURE SLURRY L: m. m.
12/02/05 (10/02/20005) (9/02/20005) (8/02/20005) (7/02/20005) (8/02/20005)
Binder cont obtained (Date) R: m. m.
RALUMAC L1 : m. m.
(Date) L2 : m. m.
Recommended hot Nett appl. (l/m2) 1.5(ℓ/m²) 1.43 (ℓ/m²) 1.5(ℓ/m²) 1.43 (ℓ/m²) 1.5(ℓ/m²) 1.43 (ℓ/m²) 1.5(ℓ/m²)
Design - Tol. // Design + Tol. (l/m2) 1.47 // 1.53 1.40 // 1.46 1.47 // 1.53 (ℓ/m²) 1.40 // 1.46 (ℓ/m²) 1.47 // 1.53 1.40 // 1.46 (ℓ/m²) 1.47 // 1.53
m. m.
Total cold Nett Obtained m. m.
m. m.
m. m.
Final Spray Type // Grade. // Source // Appl. STABLE MIX ANOINIC 60 DILUTED WITH 50% OF WATER- BLOEMFONTEIN- 1ℓ/m²
4.5 m. 9 m. 1.02(08/11/2004) 0.99(09/11/2004) 1.0(09/11/2004) 0.98(09/11/2004) 1.0
l/m2 Actual Obtained 0 m. 4.5 m. 1.02(08/11/2004) 0.99(09/11/2004) 1.0(09/11/2004) 0.85(09/11/2004) 1.0
Cold * m. m. 0.93(09/11/2004) 0.9
Hot* (Date ) m. m.
Aggr. Type // Size // Source // Appl.
2 nd Layer m. m.
5.6m: 8.6m
Actual Obtained m. m. 2.8m: 5.6m
(m2 / m3) m. m.
(Date) m. m. 0m: 2.8m:
2 nd Spray / Type // Size // Source // Appl.
m. m.
l/m2 Actual Obtained m. m.
m. m.
Hot * (Date) m. m.
Aggr. Type // Size // Source // Appl. Blue Dolerite -19mm chrushed stone - Quarry 5.3 - 83m²/m³
1 st Layer 6.0 m. 9.1 m. 89 84(4/11/04) 82(04/11/2004) 85(03/11/2004) 80(03/11/2004) 85 88(3/11/2004) 86
Actual Obtained 3 m. 6 m. 86 84(4/11/04) 80(04/11/2004) 100(03/11/2004) 81(03/11/2004) 85 82(3/11/2004) 86
(m2 / m3) 0 m. 3 m. 86 84(4/11/04) 74(04/11/2004) 82(03/11/2004) 81(03/11/2004) 85 88(3/11/2004) 86
(Date) m. m.
1 st Spray / Type // Size // Source // Appl. 80/100 Penetration Bit - Bloemfontein - 1.5ℓ/m²
6.0 m. 9.1 m. 1.47 1.46(4/11/04) 1.56(04/11/2004) 1.42(03/11/2004) 1.47(03/11/2004) ### 1.44(3/11/2004) ###
l/m2 Actual Obtained 3.0 m. 6.0 m. 1.49 1.43(4/11/04) 1.51(04/11/2004) 1.42(03/11/2004) 1.46(03/11/2004) ### 1.50(3/11/2004) ###
0 m. 3 m. 1.49 1.43(4/11/04) 1.51(04/11/2004) 1.42(03/11/2004) 1.46(03/11/2004) ### 1.50(3/11/2004) ###
Hot * (Date) m. m.
MC after prime (c / s)
Type // Size // Source // Appl. 3/12 TRH PRIME - BLOEMFONTEIN - 0.8ℓ/m²
Fogspray Slow Shoulder 4.5 m. 9.0 m. 0.81(28/10/2004) 0.8(28/10/2004) 0.8(27/10/2004) 0.79(26/10/2004)
Actual Obtained 0.0 m. 4.5 m. 0.81(28/10/2004) 0.8(28/10/2004) 0.8(27/10/2004) 0.85 0.87(26/10/2004)
l/m2 m. m.
(Date) m. m.
MC before prime (c / s)

Section (km) 16.20 16.40 16.60 16.80 17.00 17.20 17.40 17.60 17.80 18.00 18.20 18.40 18.60 18.80 19.00 19.200 19.400

* Delete if not applicable


Prepared by : Contract: PTB5-02/03-1706 From km Form
SEAL WORK Route: DR08560 19.400 AB 7
AFRICON Section: ROAD BETWEEN STERKSPRUIT-TELLEBRIDGE (01/1993)
Date: Carriageway: FULL WIDTH To km Sheet no
12/04/2005 Seal type: CAPE SEAL 21.562 7 of 7

Section 19.400 19.600 19.800 20.000 20.200 20.400 20.600 20.800 21.000 21.200 21.400 21.562

Date opened to traffic


Permeability (l/h)

Type Appl. Strip


Slurry Total : full width m. m.
(kg/m2) (m2/m3) * m. m. (124m²/m³)(5.9%) (124m²/m³)(5.9%)
and TEXTURE SLURRY L: m. m.
Binder cont obtained (Date) R: m. m. (4/02/2005) (3/02/2005)
RALUMAC L1 : m. m.
(Date) L2 : m. m.
Recommended hot Nett appl. (l/m2) 1.5(ℓ/m²) 1.43(ℓ/m²) 1.5(ℓ/m²)
Design - Tol. // Design + Tol. (l/m2) 1.47 // 1.53 1.40 // 1.46 (ℓ/m²) 1.47 // 1.53(ℓ/m²)
m. m.
Total cold Nett Obtained m. m.
m. m.
m. m.
Final Spray Type // Grade. // Source // Appl. STABLE MIX ANOINIC 60 DILUTED WITH 50% WATER- BLEOMFONTEIN - 1ℓ/m²
6 m. 10.2 m. ### 1.17(17/11/2004) ### ### 1.00(17/11/2004)
l/m2 Actual Obtained 3 m. 6 m. ### ### ### 0.99(17/11/2004) 0.85(17/11/2004) 1.01(17/11/2004)
Cold * 0 m. 3 m. ### ### 1.00 1 1.09(17/11/2004) 0.99(17/11/2004)
Hot* (Date ) m. m.
Aggr. Type // Size // Source // Appl.
2 nd Layer m. m.
Actual Obtained m. m.
(m2 / m3) m. m.
(Date) m. m.
2 nd Spray / Type // Size // Source // Appl.
m. m.
l/m2 Actual Obtained m. m.
m. m.
Hot * (Date) m. m.
Aggr. Type // Size // Source // Appl. Blue Dolerite -19mm chrushed stone - Quarry 5.3 - 83m²/m³
1 st Layer m. m. 86(1/11/04) 78 81(1/11/04) 78(1/11/2004) 78(1/11/2004) 77(2/11/2004) 72(2/11/2004)
Actual Obtained m. m. 86(1/11/04) 78 81(1/11/04) 81(1/11/2004) 72(2/11/2004) 77(2/11/2004)
(m2 / m3) m. m. 86(1/11/04) 75 78 73 78(1/11/2004) 77(2/11/2004) 72(2/11/2004)
(Date) m. m.
1 st Spray / Type // Size // Source // Appl. 80/100 Penetration Bit - Bloemfontein - 1.5ℓ/m²
5.6 m. 8.6 m. 1.54(1/11/04) 1.29 1.43(1/11/04) 1.40(1/11/2004) 1.51(1/11/2004) 1.50(2/11/2004) 1.5(2/11/2004)
l/m2 Actual Obtained 2.8 m. 5.6 m. 1.56(1/11/04) 1.45 1.36(1/11/04) 1.53(1/11/2004) 1.66(2/11/2004) 1.54(2/11/2004)
0 m. 2.8 m. 1.56(1/11/04) 1.17 1.4 1.37 1.41(1/11/2004) 1.54(2/11/2004) 1.5(2/11/2004)
Hot * (Date) m. m.
MC after prime (c / s)
Type // Size // Source // Appl. 3/12 TRH PRIME - BLOEMFONTEIN - 0.8ℓ/m²
Fogspray Slow Shoulder 4.5 m. 9.0 m. 0.79
0.82(1/10/2004)
Actual Obtained 0.0 m. 4.5 m. 0.87
l/m2 m. m.
(Date) m. m.
MC before prime (c / s)

Section (km) 19.40 19.60 19.80 20.00 20.20 20.40 20.60 20.80 21.00 21.20 21.40 21.60 21.80 22.00 22.20 22.400 22.600

* Delete if not applicable


Prepared by : Contract: PTB5-02/03-1706 From km Form
SEAL WORK Route: DR08560 13.000 AB 7
AFRICON Section: ROAD BETWEEN STERKSPRUIT-TELLEBRIDGE (01/1993)
Date: Carriageway: FULL WIDTH To km Sheet no
14/04/2005 Seal type: CAPE SEAL 16.200 5 of 7

Section 13.000 13.200 13.400 13.600 13.800 14.000 14.200 14.400 14.600 14.800 15.000 15.200 15.400 15.600 15.800 16.000 16.20

Date opened to traffic


Permeability (l/h)

Type Appl. Strip


Slurry Total : Full width m. m.
(kg/m2) (m2/m3) * R: m. m. (125m²/m³)(5.9%) (125m²/m³)(5.9%) 125(m²/m³)(5.9%)
and TEXTURE SLURRY L: m. m.
Binder cont obtained (Date) R: m. m. 16/02/2005 15/02/2005 14/02/2005
RALUMAC L1 : m. m.
(Date) L2 : m. m.
Recommended hot Nett appl. (l/m2) 1.43 (ℓ/m²) 1.5 (ℓ/m²)
Design - Tol. // Design + Tol. (l/m2) 1.40 // 1.46 (ℓ/m²) 1.47 // 1.53 (ℓ/m²)
m. m.
Total cold Nett Obtained m. m.
m. m.
m. m.
Final Spray Type // Grade. // Source // Appl. STABLE MIX ANOINIC 60 DILUTED WITH 50% OF WATER- BLOEMFONTEIN- 1ℓ/m²
5.6 m. 8.6 m. 1.0(19/11/2004) 0.99(17/11/2004) 1.02(08/11/2004)
l/m2 Actual Obtained 2.8 m. 5.6 m. 1.0(19/11/2004) 1.02(17/11/2004) 1.02(08/11/2004)
Cold * 0 m. 2.8 m. 1.0(19/11/2004) 1.02(17/11/2004) 1.02(08/11/2004)
Hot* (Date ) m. m.
Aggr. Type // Size // Source // Appl.
2 nd Layer m. m.
Actual Obtained m. m.
(m2 / m3) m. m.
(Date) m. m.
2 nd Spray / Type // Size // Source // Appl.
m. m.
l/m2 Actual Obtained m. m.
m. m.
Hot * (Date) m. m.
Aggr. Type // Size // Source // Appl. Blue Dolerite -19mm chrushed stone - Quarry 5.3 - 83m²/m³
1 st Layer 5.6 m. 8.6 m. 82(15/11/2004) 83 90(12/11/2004) 82(12/11/2004) 82(12/11/2004) 89(4/11/2004) 89(4/11/04)
Actual Obtained 2.8 m. 5.6 m. 76(15/11/2004) 92 84(12/11/2004) 80(12/11/2004) 80(12/11/2004) 86(4/11/2004) 86(4/11/04)\
(m2 / m3) 0 m. 2.8 m. 76(15/11/2004) 77 84(12/11/2004) 82(12/11/2004) 80(12/11/2004) 81(4/11/2004) 86(4/11/04)
(Date) m. m.
1 st Spray / Type // Size // Source // Appl. 80/100 Penetration Bit - Bloemfontein - 1.5ℓ/m²
5.6 m. 8.6 m. 1.44(15/11/2004) 1.52 1.52(12/11/2004) 1.50(12/11/2004) 1.49(12/11/2004) 1.47(4/11/2004) 1.47
l/m2 Actual Obtained 2.8 m. 5.6 m. 1.43(15/11/2004) 1.52 1.52(12/11/2004) 1.49(12/11/2004) 1.49(12/11/2004) 1.49(4/11/2004) 1.49
0 m. 2.8 m. 1.43(15/11/2004) 1.52 1.52(12/11/2004) 1.49(12/11/2004) 1.49(12/11/2004) 1.49(4/11/2004) 1.49
Hot * (Date) m. m.
MC after prime (c / s)
Type // Size // Source // Appl. 3/12 TRH PRIME - BLOEMFONTEIN - 0.8ℓ/m²
Fogspray Slow Shoulder 4.5 m. 9.0 m. 0.8 0.8(3/11/2004) 0.8(3/11/2004) 0.81(28/10/2004)
Actual Obtained 0.0 m. 4.5 m. 0.8 0.8(3/11/2004) 0.8(3/11/2004) 0.81(28/10/2004)
l/m2 m. m.
(Date) m. m.
MC before prime (c / s)

Section (km) 13.00 13.20 13.40 13.60 13.80 14.00 14.20 14.40 14.60 14.80 15.00 15.20 15.40 15.60 15.80 16.000 16.200
* Delete if not applicable
Prepared by : Contract: PTB5-02/03-1706 From km Form
SEAL WORK Route: DR08560 9.800 AB 7
AFRICON Section: ROAD BETWEEN STERKSPRUIT-TELLEBRIDGE (01/1993)
Date: Carriageway: FULL WIDTH To km Sheet no
14/04/2005 Seal type: CAPE SEAL 13.000 4 of 7

Section 9.800 10.000 10.200 10.400 10.600 10.800 11.000 11.200 11.400 11.600 11.800 12.000 12.200 12.400 12.600 12.800 13.00

Date opened to traffic


Permeability (l/h)

Type Appl. Strip


Slurry Total : full with m. m.
(kg/m2) (m2/m3) * R: m. m. (122m²/m³)(5.9%) (122m²/m³)(5.9%) (122m²/m³)(5.9%)
and TEXTURE SLURRY L : m. m.
Binder cont obtained (Date) R: m. m. 17/02/2005) 16/02/2005 15/02/2005)
RALUMAC L1 : m. m.
(Date) L2 : m. m.
Recommended hot Nett appl. (l/m2) 1.43 (ℓ/m²) 1.5 (ℓ/m²) 1.43 (ℓ/m²) 1.5 (ℓ/m²) 1.43 (ℓ/m²) 1.5 (ℓ/m²) 1.35 (ℓ/m²)
Design - Tol. // Design + Tol. (l/m2) 1.40 // 1.46 (ℓ/m²) 1.47 // 1.53 (ℓ/m²) 1.40 // 1.46 (ℓ/m²) 1.47 // 1.53 1.40 // 1.46 (ℓ/m²) 1.47 // 1.53 1.32 // 1.38
m. m.
Total cold Nett Obtained m. m.
m. m.
m. m.
Final Spray Type // Grade. // Source // Appl. STABLE MIX ANOINIC 60 DILUTED WITH 50% OF WATER- BLOEMFONTEIN- 1ℓ/m²
4.5 m. 9 m. 0.98(09/12/2004) 1.0(09/12/2004) 1.0(09/12/2004) 1.01(09/12/2004) 1.0
l/m2 Actual Obtained 0 m. 4.5 m. 0.98(09/12/2004) 1.0(09/12/2004) 1.0(09/12/2004) 1.01(09/12/2004) 1.0
Cold * m. m.
Hot* (Date ) m. m.
Aggr. Type // Size // Source // Appl.
2 nd Layer m. m.
Actual Obtained m. m.
(m2 / m3) m. m.
(Date) m. m.
2 nd Spray / Type // Size // Source // Appl.
m. m.
l/m2 Actual Obtained m. m.
m. m.
Hot * (Date) m. m.
Aggr. Type // Size // Source // Appl. Blue Dolerite -19mm chrushed stone - Quarry 5.3 - 83m²/m³
1 st Layer 6.0 m. 8.9 m. 84(7/12/2004) 85(7/12/2004) 87(7/12/2004) 84(06/12/04) 82(06/12/2004) 84(06/12/04) 82(09/12/2004) 78 87
Actual Obtained 3 m. 6 m. 80(7/12/2004) 88(7/12/2004) 85(7/12/2004) 87(06/12/04) 90(06/12/2004) 82(09/12/2004) 78 81 75
(m2 / m3) 0 m. 3 m. 80(7/12/2004) 83(7/12/2004) 80(7/12/2004) 87(06/12/04) 86(06/12/2004) 88(09/12/2004) 78 81
(Date) m. m.
1 st Spray / Type // Size // Source // Appl. 80/100 Penetration Bit - Bloemfontein - 1.5ℓ/m²
6.0 m. 8.9 m. 1.35(7/12/2004) 1.53(7/12/2004) 1.44(7/12/2004) 1.51(06/12/04) 1.41(06/12/2004) 1.43(06/12/04) 1.32(09/12/2004) 1.51 1.35
l/m2 Actual Obtained 3.0 m. 6.0 m. 1.35(7/12/2004) 1.52(7/12/2004) 1.46(7/12/2004) 1.51(06/12/04) 1.44(06/12/2004) 1.32(09/12/2004) 1.51 1.37
0 m. 3 m. 1.35(7/12/2004) 1.52(7/12/2004) 1.42(7/12/2004) 1.51(06/12/04) 1.44(06/12/2004) 1.32(09/12/2004) 1.51 1.37 1.41
Hot * (Date) m. m.
MC after prime (c / s)
Type // Size // Source // Appl. 3/12 TRH PRIME - BLOEMFONTEIN - 0.8ℓ/m²
Fogspray Slow Shoulder 6.0 m. 9.0 m. 0.73(3/12/2004) 0.81(3/12/2004) 0.82(8/12/2004) 0.83(03/11/2004)
Actual Obtained 3.0 m. 6.0 m. 0.8(3/12/2004) 0.79(3/12/2004) 0.80(8/12/2004)
l/m2 0 m. 3.0 m. 0.91(3/12/2004) 0.79(3/12/2004) 0.80(8/12/2004) 0.83(03/11/2004)
(Date) m. m.
MC before prime (c / s)

Section (km) 9.80 10.00 10.20 10.40 10.60 10.80 11.00 11.20 11.40 11.60 11.80 12.00 12.20 12.40 12.60 12.800 13.000

* Delete if not applicable


Prepared by : Contract: PTB5-02/03-1706 From km Form
SEAL WORK Route: DR08560 6.600 AB 7
AFRICON Section: ROAD BETWEEN STERKSPRUIT-TELLEBRIDGE (01/1993)
Date: Carriageway: FULL WIDTH To km Sheet no
14/04/2005 Seal type: CAPE SEAL 9.800 3 of 7

Section 6.600 6.800 7.000 7.200 7.400 7.600 7.800 8.000 8.200 8.400 8.600 8.800 9.000 9.200 9.400 9.600 9.80

Date opened to traffic


Permeability (l/h)

Type Appl. Strip


Slurry Total : full width m. m.
(kg/m2) (m2/m3) * R: m. m. (121m²/m³) (5.9%) (121m²/m³)(5.9%) (121m²/m³)(5.9%)
and TEXTURE SLURRY L : m. m.
Binder cont obtained (Date) R: m. m. 20/02/2005) 19/02/2005) 18/02/2005)
RALUMAC L1 : m. m.
(Date) L2 : m. m.
Recommended hot Nett appl. (l/m2) 1.5 1.43 (ℓ/m²) 1.35 (ℓ/m²) 1.43 (ℓ/m²) 1.35 (ℓ/m²) 1.43 (ℓ/m²)
Design - Tol. // Design + Tol. (l/m2) 1.40 // 1.46 1.32 // 1.38 (ℓ/m²) 1.40 // 1.46 (ℓ/m²) 1.32 // 1.38 1.40 // 1.46
m. m.
Total cold Nett Obtained m. m.
m. m.
m. m.
Final Spray Type // Grade. // Source // Appl. STABLE MIX ANOINIC 60 DILUTED WITH 50% OF WATER- BLOEMFONTEIN- 1ℓ/m²
4.5 m. 9 m. 1.1(10/12/2004) 1.0(27/11/2004) 1.0(26/11/2004) ### 0.98
l/m2 Actual Obtained 0 m. 4.5 m. 1.1(10/12/2004) 1.0(27/11/2004) 0.96(26/11/2004) ### 0.98
Cold * m. m.
Hot* (Date ) m. m.
Aggr. Type // Size // Source // Appl.
2 nd Layer m. m.
Actual Obtained m. m.
(m2 / m3) m. m.
(Date) m. m.
2 nd Spray / Type // Size // Source // Appl.
m. m.
l/m2 Actual Obtained m. m.
m. m.
Hot * (Date) m. m.
Aggr. Type // Size // Source // Appl. Blue Dolerite -19mm chrushed stone - Quarry 5.3 - 83m²/m³
1 st Layer 5.8 m. 8.6 m. 88(9/12/2004) 84(26/11/2004) 87(26/11/2004) 77(26/11/2004) 77(26/11/2004) 77(26/11/04) 80 84
Actual Obtained 3 m. 5.8 m. 88(9/12/2004) 84(26/11/2004) 87(26/11/2004) 82(26/11/2004) 82(26/11/2004) 83(26/11/04) 86 80
(m2 / m3) 0 m. 3 m. 78(9/12/2004) 84(26/11/2004) 87(26/11/2004) 78(26/11/2004) 87(26/11/2004) 83(26/11/04) 86 80
(Date) m. m.
1 st Spray / Type // Size // Source // Appl. 80/100 Penetration Bit - Bloemfontein - 1.5ℓ/m²
5.8 m. 8.6 m. 1.30(9/12/2004) 1.26(26/11/2004) 1.28(26/11/2004) 1.44(26/11/2004) 1.44(26/11/2004) 1.30(26/11/04) ### ###
l/m2 Actual Obtained 3.0 m. 5.8 m. 1.31(9/12/2004) 1.33(26/11/2004) 1.35(26/11/2004) 1.44(26/11/2004) 1.44(26/11/2004) 1.36(26/11/04) ### ###
0 m. 3 m. 1.33(9/12/2004) 1.33(26/11/2004) 1.38(26/11/2004) 1.44(26/11/2004) 1.44(26/11/2004) 1.36(26/11/04) ### ###
Hot * (Date) m. m.
MC after prime (c / s)
Type // Size // Source // Appl. 3/12 TRH PRIME - BLOEMFONTEIN - 0.8ℓ/m²
Fogspray Slow Shoulder 6.6 m. 9.9 m. 0.78(08/12/2004) 0.8(19/11/2004) 0.7
Actual Obtained 3.3 m. 6.6 m. 0.78(08/12/2004) 0.8(19/11/2004) 0.8
l/m2 0 m. 3.3 m. 0.78(08/12/2004) 0.8(19/11/2004) 0.9
(Date) m. m.
MC before prime (c / s)

Section (km) 6.60 6.80 7.00 7.20 7.40 7.60 7.80 8.00 8.20 8.40 8.60 8.80 9.00 9.20 9.40 9.600 9.800

* Delete if not applicable


Prepared by : Contract: PTB5-02/03-1706 From km Form
SEAL WORK Route: DR08560 0.000 AB 7
AFRICON Section: ROAD BETWEEN STERKSPRUIT-TELLEBRIDGE (01/1993)
Date: Carriageway: FULL WIDTH To km Sheet no
8/04/2005 Seal type: CAPE SEAL 3.400 1 of 7

Section 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800 3.000 3.200 3.40

Date opened to traffic


Permeability (l/h)

Type Appl. Strip


Slurry Total : Full width m. m.
(kg/m2) (m2/m3) * m. m. (123m²/m³)(5.9 %) (123m²/m³)(5.9 %) (123m²/m³)(5.9 %) (123m²/m³)(5.9 %)
and TEXTURE SLURRY L : m. m.
Binder cont obtained (Date) R: m. m. 23/3/2005) 24/3/2005) (1/04/2005) (2/04/2005)
RALUMAC L1 : m. m.
(Date) L2 : m. m.
Recommended hot Nett appl. (l/m2) 1.5 (ℓ/m²) 1.43 (ℓ/m²) 1.5 (ℓ/m²) 1.35 (ℓ/m²) 1.43 (ℓ/m²)
Design - Tol. // Design + Tol. (l/m2) 1.47 // 1.53 ( ℓ/m²) 1.40 // 1.46 ( ℓ/m²) 1.47 // 1.53 ( ℓ/m²) 1.32 // 1.38 ( ℓ/m²) 1.40 // 1.46 ( ℓ/m²)
m. m.
Total cold Nett Obtained m. m.
m. m.
m. m.
Final Spray Type // Grade. // Source // Appl. STABLE MIX ANOINIC 60 DILUTED WITH 50% OF WATER- BLOEMFONTEIN- 1ℓ/m²
6 m. 9 m. 1.0(10/03/2005) 1.0(19/03/2005) 1.0(19/03/2005) 1.0(16/03/2004)
l/m2 Actual Obtained 3 m. 6 m. 1.0(10/03/2005) 1.0(19/03/2005) 1.0(19/03/2005) 1.0(16/03/2004)
Cold * 0 m. 3 m. 1.0(10/03/2005) 1.0(19/03/2005) 1.0(19/03/2005) 1.0 1.0(16/03/2004)
Hot* (Date ) m. m.
Aggr. Type // Size // Source // Appl.
2 nd Layer m. m.
Actual Obtained m. m.
(m2 / m3) m. m.
(Date) m. m.
2 nd Spray / Type // Size // Source // Appl.
m. m.
l/m2 Actual Obtained m. m.
m. m.
Hot * (Date) m. m.
Aggr. Type // Size // Source // Appl. Blue Dolerite -19mm chrushed stone - Quarry 5.3 - 83m²/m³
1 st Layer 5.4 m. 8.6 m. 122(09/03/2005) 128(09/03/2005) 120(15/03/2005) 125(15/03/2005) 127(05/03/2005) 118(16/03/2005) 125(16/03/2005) 122
Actual Obtained 2.7 m. 5.4 m. 121(09/03/2005) 120(09/03/2005) 124(15/03/2005) 125(15/03/2005) 123(05/03/2005) 118(16/03/2005) 121(16/03/2005) 118
(m2 / m3) 0 m. 2.7 m. 121(09/03/2005) 120(09/03/2005) 124(15/03/2005) 125(15/03/2005) 123(05/03/2005) 118(16/03/2005) 121(16/03/2005) 118
(Date) m. m.
1 st Spray / Type // Size // Source // Appl. 80/100 Penetration Bit - Bloemfontein - 1.5ℓ/m²
5.4 m. 8.6 m. 1.52(09/03/2005) 1.52(09/03/2005) 1.52(15/03/2005) 1.44(15/03/2005) 1.48(05/03/2005) 1.53(16/03/2005) 1.36(16/03/2005) 1.45
l/m2 Actual Obtained 2.7 m. 5.4 m. 1.51(09/03/2005) 1.48(09/03/2005) 1.53(15/03/2005) 1.47(15/03/2005) 1.47(05/03/2005) 1.53(16/03/2005) 1.36(16/03/2005) 1.47
0 m. 2.7 m. 1.51(09/03/2005) 1.53(09/03/2005) 1.49(15/03/2005) 1.44(15/03/2005) 1.47(05/03/2005) 1.53(16/03/2005) 1.36(16/03/2005) 1.47
Hot * (Date) m. m.
MC after prime (c / s)
Type // Size // Source // Appl. 3/12 TRH PRIME - BLOEMFONTEIN - 0.8ℓ/m²
Fogspray Slow Shoulder 6.8 m. 10.2 m. 0.81(04/03/2005) ### 0.8(04/03/2005) 0.8(04/03/2005) 0.81(04/03/2005) 0.8
Actual Obtained 3.4 m. 6.8 m. 0.81(04/03/2005) ### 0.8(04/03/2005) 0.8(04/03/2005) 0.81(04/03/2005) 0.8
l/m2 0 m. 3.4 m. 0.82(04/03/2005) 0.8(04/03/2005) 0.81(04/03/2005) 0.8
(Date) m. m.
MC before prime (c / s)

Section (km) 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.20 2.40 2.60 2.80 3.00 3.200 3.400

* Delete if not applicable


Prepared by : Contract: From km Form
SEAL WORK Route: AB 7
Section: (01/1993)
Date: Carriageway: To km Sheet no
Seal type: of

Section

Date opened to traffic


Permeability (l/h)

Type Appl. Strip


Slurry Total : L: m. m.
(kg/m2) (m2/m3) * R: m. m.
and TEXTURE SLURRY L : m. m.
Binder cont obtained (Date) R: m. m.
RALUMAC L1 : m. m.
(Date) L2 : m. m.
Recommended hot Nett appl. (l/m2)
Design - Tol. // Design + Tol. (l/m2)
m. m.
Total cold Nett Obtained m. m.
m. m.
m. m.
Final Spray Type // Grade. // Source // Appl.
m. m.
l/m2 Actual Obtained m. m.
Cold * m. m.
Hot* (Date ) m. m.
Aggr. Type // Size // Source // Appl.
2 nd Layer m. m.
Actual Obtained m. m.
(m2 / m3) m. m.
(Date) m. m.
2 nd Spray / Type // Size // Source // Appl.
m. m.
l/m2 Actual Obtained m. m.
m. m.
Hot * (Date) m. m.
Aggr. Type // Size // Source // Appl.
1 st Layer m. m.
Actual Obtained m. m.
(m2 / m3) m. m.
(Date) m. m.
1 st Spray / Type // Size // Source // Appl.
m. m.
l/m2 Actual Obtained m. m.
m. m.
Hot * (Date) m. m.
MC after prime (c / s)
Type // Size // Source // Appl.
Fogspray m. m.
Actual Obtained m. m.
l/m2 m. m.
(Date) m. m.
MC before prime (c / s)
Section (km)

* Delete if not applicable

You might also like