Maharashtra State Electricity Distribution Co. Ltd.

. .#"~ ,. Office of the Chief Engineer (Power Purchase)


"Prakashgad", 5th Floor, Station Road, Sandra (E), Mumbai -400 051.
IVIIU-IAVITARAN
Maharoshtr(ll Stato Eloctr'fclty Ol$tribution Co, Ltd.
Tel.: (P) 26580645, (0) 26474211, Fax: (022) 2658 0656
Email: cepp@mahadiscom.in, Website: www.mahadiscom.com

(A Govt. of Maharashtra Undertaking)


CIN: U40109MH2005SGC153645

No, CE(PP)/SOLAR/GC/~ 3 112 2 Date: ~1 9 DEe 2017


To
The Chief Engineer (STU),
Prakashganga, 5th Floor, A Wing,
Plot C-19, E-Block, BKC,Bandra (E),
Mumbai - 400051. .
Sub: Grant of grid connectivity permissions in respect of solar power projects getting
connected to MSEDCL'ssubstation.
Ref: i) GoM RE policy dated 20.07.2015 and methodology for its implementation dated
09.09.2015.
ii) Various proposals received and recommendation letters received from MEDA.
With reference to the above subject, it is to inform that many solar power projects
holderswith project capacity from 1 MW to 10 MW are approaching this office for getting
connectivity at MSEDCL's substations.

As per the G. R. dated 09.09.2015 for Methodology for implementation of GoM RE Policy
- 2015 dated 20.07.2015, a Grid Committee has been formulated under the Chairmanship of
Chief Engineer (STU) which comprises representatives of MSEDCL, MSETCL & MEDA as
members for taking decisions regarding grant/cancellation/extension of Grid connectivity
permissions in respect of Solar and Wind Power projects in the State of Maharashtra.

Further, as per the procedure laid down in the Methodology, all the proposals regarding
grant of solar & wind grid connectivity shall be put up before the grid committee and the grid
connectivity shall be approved on the basis of the decision of Committee.

In this regard, this office is in receipt of proposals from MEDA requesting Grid
connectivity at MSEDCL's substation. Accordingly, this office has obtained the technical
feasibility reports from the concerned field offices.

The feasibility in respect of following proposals is received by this office which is to be


put up before the committee.
S Projec
Neare
r. t MEDA Remarks
Name of Site Project Site st
N Capac Letter No
S/Stn.
0 itv
1 M/s Dhumketu At village Naigaon, Tal. 10 33/11 PGN/GSPP- Tech feasibility report
Solar LLP Patoda, Dist. Beed MW KV 351/2017/ received from circle
Rohat 4365 Dated: office.
wadi 24.10.17.
It is therefore requested to put up the proposals before the Grid Committee for suitable
decision.
This is for your information and further needful please. ~

Chief Engineer (PZ'rChaSe)


Copy s.w.rs.to:
i) The Director(Operations),MSEDCL, Mumbai
ii) The Executive Director (Dist.l-cornm), MSEDCL,Mumbai.
Copy f. w. c. to:
The General Manager (PG-II), Maharashtra Energy Development Agency, (MEDA),
Sr.No.191, Phase-l,MHADA Commercial Complex,2nd floor.Opp, Tridal Nagar, Yerwada,
Pune-411 006.