QFM – DT – 043-01

PROJECT/ BUILDING HSE MEASUREMENT PLAN Rev: 02


Date: 15.09.2015
Page: 1 of 2

Attachment B: Project/ Building HSE Measurement Plan Rev No: EST/002


Project Title: EPIC OF EMERGENCY ALARM & PA SYSTEM AT VARIOUS LOCATIONS IN DUKHAN
Date: 23/07/2017

Item Item Measurement Acceptance Interval Example Equipment & Measure In- Immediate Response for Response Remarks
No. Description Criteria Sampling Point Accuracy charge* Deviation In-charge
(requirements)

1 Noise N/A N/A N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A N/A


2 Wind

As per QP Heat Continous Contractor As per QP Heat Stress Contractor


Celsius/ Hygrometer(
Heat & Stress monitoring and Supervisor / Management Plan Work Supervisor / As per Qatar
3 Relative Work site valid
Humidity Management recorded every HSE /rest rotation, water HSE Law
humidity under the sun calibration)
Plan hour requirement)

N/A N/A N/A N/A N/A N/A N/A N/A N/A


Waste
4
Disposal

Gas Contractor Contractor


As per QP-REG- As required for Near and 4 Gas Tester No entry, provide forced Personnel
Testing LEL,Toxic, Authorized Gas Supervisor /
5 and CO, Oxygen
S-001 (section confined space inside confined (valid
Tester
ventilation until reading is
HSE
must be CSE
5.18.1) activities space calibration) acceptable level trained
Monitoring
QFM – DT – 043-01
PROJECT/ BUILDING HSE MEASUREMENT PLAN Rev: 02
Date: 15.09.2015
Page: 1 of 2
N/A N/A N/A N/A N/A N/A N/A N/A N/A

6 Illumination

Note-1 : Measurement performed by entities outside of DT control (i.e. Asset Holder and GS) access to records shall be obtained
2 : For projects, the measurement plan shall be developed by Project HSE and approved by Department HSE.
3 : For buildings, the measurement plan shall be developed by PEPS HSE and approved by GS focal point for HSE/ Building Services

ESR0001c (e-signed) EST/1(e-signed)

Project HSE Departmental HSE