1) The current version of ISO 3834 Part 1 is:

a] 2008 b] 2005 c] 2010 d] 2015

2) The full form of ISO :-

a] International Standard Organization b] Indian Standard Organization


c] International Organization for Standardization
d] Italian Standard Organization

3) ISO 3834 : 2005 is referring to :-

a] ISO 9001: 2008 b] ISO 9001:2000 c] ISO 9001:2015 d] ISO 9000:2005

4) ---------- is known as a special process:-

a] Milling b] Painting c] Drilling d] Threading

5) Which of the following is a true statement:-

a] ISO 3834 is a mandatory standard in fabrication industry.


b] ISO 3834 certification has to be obtained along with ISO 9001.
c] ISO 3834 has a legal status in India.
d] ISO 3834 can be obtained with out having ISO 9001 certification.

6) Equipment maintenance documented plans and records are required for :-

a] ISO 3834-Part 1
b] ISO 3834-Part 2
c] ISO 3834-Part 3
d] ISO 3834-Part 5

7) The Technical review need not include :-

a] Sequence of welds
b] Post Weld Heat Treatment
c] Sub-contracting
d] Plant Layout

8) ISO 3834-Part 5, Table 3, the NDT personnel should be qualified as per :-

a] ISO 14731
b] SNT-TC-1A
c] ISO 9712
d] ASME Section IX
---2---

9) ISO 3834-Part 2, Clause 18, Quality records shall be retained for minimum:-

a] 10 years
b] 5 years
c] 3 years
d] No requirement

10) ISO 3834 Certification can not be obtained for :-

a] ISO 3834-Part 1
b] ISO 3834-Part 2
c] ISO 3834-Part 3
d] ISO 3834-Part 4

11) ---------- is necessary element for all ISO 3834 Part 2, 3 & 4:-

a] Equipment Maintenance
b] Welding Procedure Specifications
c] Treaceability
d] Review of requirements

12) The standard ISO 9606-1 is used for:-

a] Welder qualification for manual or partly mechanized welding processes


b] Welder qualification for fully mechanized welding process
c] Both a & b are correct
d] Welder qualification for manual welding process

13) ISO 14731 defines:-

a] Tasks and responsibilities for Welding Coordinators


b] Tasks and responsibilities for qualified welders
c] Both a & b are correct
d] Tasks and responsibilities for NDE operators

14) Heat input is related with :-

a] Voltage
b] Current
c] Travel speed
d] All of the above

15) According to ISO 15614, a welder who satisfactory complete the test for the
qualification of WPS:-

a] needs to weld a specific new test to be qualified in accordance with ISO 9606-1
b] automatically qualified in accordance with ISO 9606-1 with the relevant range of
qualification
c] Must be previously qualified to be allowed to weld a test pieces for the qualification
of that WPS
d] None of the above is correct