SEMIEMPERICAL ESTIMATE OF PILE CAPACITY CONFORMING AASHTO LRFD-2007

PROJECT: DHAKA MAWA BHANGA HIGHWAY PROJECT


GWT:
γw:
0
9.8
m
kN/m3
CLIENT:

OWNER:
HPCP & DICL
BANGLADESH ARMY
DMB BH- 01
CATEGORY OF PILE: BORED PILE Pile Capacity (kN)

Rel. Density/

Resistance, qp
Consistency
Thickness

Diameter of

Diameter of

Diameter of
Resistance;fs
Noncohesive

(Corrected)
Stress, σz0'
Cohesive/

Unit Skin
Effective

Unit Tip
Graphical

Pile(m)

Pile(m)

Pile(m)
Layer
Layer

Liquefaction

SPT
Depth (m) γt SPT SPT Representation of
Analysis
N-Value

N-VALUE (F.S)
# Start End (m) Type kN/m3 (kPa) N N60 N160 (kPa) (kPa) 0 10 20 30 40 50 60 0 1 2 3 4 1 1.2 1.5
1 0
1 0 1.45 1.45 S 17 5.2 0 0 VLOOSE 0 0.0 0 0.00 0.00 0.00
2 1.45 2.45 1 S 17 14.0 2 3 VLOOSE 4 0.0 0 0.00 0.00 0.00
3 2.45 3.45 1 S 17 21.2 2 3 VLOOSE 4 0.0 0 0.00 0.00 0.00
4 3.45 4.45 1 S 17 28.4 5 7 LOOSE 9 0.0 0 5 0.00 0.00 0.00
5 4.45 5.45 1 S 17 35.6 6 8 LOOSE 11 0.0 0 0.00 0.00 0.00
6 5.45 6.45 1 S 17 42.8 7 9 LOOSE 12 0.0 0 0.00 0.00 0.00
7 6.45 7.45 1 S 17 50.0 9 12 LOOSE 15 0.0 0 0.00 0.00 0.00
8 7.45 8.45 1 S 17 57.2 7 9 LOOSE 11 0.0 0 11 10 0.00 0.00 0.00
9 8.45 9.45 1 S 17 64.4 10 13 LOOSE 15 0.0 0 0.00 0.00 0.00
10 9.45 10.95 1.5 S 17 73.4 11 15 MEDIUM 16 0.0 0 0.00 0.00 0.00
11 10.95 12.45 1.5 S 17 84.2 7 9 LOOSE 10 0.0 0 0.00 0.00 0.00
15
12 12.45 13.95 1.5 S 17 95.0 5 7 LOOSE 7 0.0 0 0.00 0.00 0.00
13 13.95 15.45 1.5 S 17 105.8 12 16 MEDIUM 16 0.0 0 0.00 0.00 0.00
14 15.45 16.95 1.5 S 17 116.6 14 19 MEDIUM 17 0.0 0 0.00 0.00 0.00
15 16.95 18.45 1.5 S 17 127.4 16 21 MEDIUM 19 0.0 0 0.00 0.00 0.00
21 20
16 18.45 19.95 1.5 S 17 138.2 23 31 MEDIUM 27 59.9 1763.333 555.68 777.61 1179.74
17 19.95 21.45 1.5 S 17 149.0 24 32 MEDIUM 27 58.4 1840 667.56 916.68 1362.62
18 21.45 22.95 1.5 S 17 159.8 19 25 MEDIUM 21 56.4 1456.667 655.76 878.44 1269.66
19 22.95 24.45 1.5 S 17 170.6 20 27 MEDIUM 22 53.7 1533.333 25 760.16 1008.53 1441.31
20 24.45 25.95 1.5 S 17 181.4 22 29 MEDIUM 23 50.4 1686.667 879.44 1161.30 1650.33
21 25.95 27.45 1.5 S 17 192.2 24 32 MEDIUM 25 48.1 1840 995.07 1309.70 1853.89
22 27.45 28.95 1.5 S 17 203.0 22 29 MEDIUM 22 50.8 1686.667 1034.66 1347.57 1883.17
23 28.95 30.45 1.5 S 17 213.8 26 35 MEDIUM 25 53.5 1993.333 31 30 1198.92 1563.95 2189.77
24 30.45 31.95 1.5 S 17 224.6 34 45 DENSE 33 56.2 2606.667 1447.71 1901.03 2683.38
25 31.95 33.45 1.5 S 17 235.4 24 32 MEDIUM 22 58.9 1840 1339.45 1722.95 2370.46
26 33.45 34.95 1.5 S 17 246.2 20 27 MEDIUM 18 61.6 1533.333 1355.87 1723.38 2334.87
35
27 34.95 36.45 1.5 S 17 257.0 28 37 MEDIUM 25 64.3 2146.667 1617.38 2075.73 2847.56
28 36.45 37.95 1.5 S 17 267.8 30 40 MEDIUM 26 67.0 2300 1762.70 2259.75 3095.65
29 37.95 39.45 1.5 S 17 278.6 32 43 DENSE 28 69.7 2453.333 1912.26 2448.86 3350.11
. 30 39.45 40.95 1.5 S 17 289.4 34 45 DENSE 29 72.4 2606.667 2066.07 2643.06 3610.92
40
Note:
Notes:
Analysed By: Priodeep Chowdhury
»Sub soil up to depth (10 x diameter of pile) below tip consistency and composition shall be compatible and confirmed by test.
»Pile length is evaluated from existing river bed level or ground level.
»Where Factor of Safety against Liquefaction is less than one, skin resistance is ineffective.
Checked By: Md. Roknuz Zaman
»Factor of Safety against Skin Resistance and Tip Resistance has been considered as 3.0. DEVELOPMENT CONSTRUCTIONS LTD.
»Structural Capacity of 1.0m, 1.2m & 1.5 m diameter piles are 6500 kN, 9500 kN & 14500 kN respectively.