HAND BORING LOG 01

PROJECT : DED IRIGASI TAMBAK KOLONO GROUND WATER ELEVATION : - 1,0 M BORING METHOD : HAND CORE
KAB. KONAWE SELATAN
LOCATION : KOLONO KAB. KONAWE SELATAN BORING STARTED : 24 NOVEMBER 2016 BORE HOLE NO. : HB-01
SITE NO : BORING FINISHED : 24 NOVEMBER 2016 DRILL MASTER : AEP
SITE NAME : TAMBAK KOLONO BORING DEPTH : 3.00 METER LOGGED BY : AEP
GROUND SURFACE ELEVATION : 0,00 M

Recovery %

R.O.D. %
Standard Penetration Test

Number of Blows ( Blow/cm)


Undisturbed Sample
Elevation in Meter

Relative Density
Depth in Meter

Consistency

Depth in Meter
Casing

Colour
Scale

_______
Log

Description
N - Value (Blows/30 cm)

0,00410,004
20,004
30,00440,004
50,004
60,004
0.0
0

hitam keabu- Lapisan lempung sedikit berpasir halus.


abuan

3.0
3
End Of Boring

LEGEND : Undisturbed samples Disturbed samples

Clay Silt Sand Gravel Limestone


HAND BORING LOG 02
PROJECT : DED IRIGASI TAMBAK KOLONO GROUND WATER ELEVATION : - 1,0 M BORING METHOD : HAND CORE
KAB. KONAWE SELATAN
LOCATION : KOLONO KAB. KONAWE SELATAN BORING STARTED : 24 NOVEMBER 2016 BORE HOLE NO. : HB-02
SITE NO : BORING FINISHED : 24 NOVEMBER 2016 DRILL MASTER : AEP
SITE NAME : TAMBAK KOLONO BORING DEPTH : 3.00 METER LOGGED BY : AEP
GROUND SURFACE ELEVATION : 0,00 M

Recovery %

R.O.D. %
Standard Penetration Test

Number of Blows ( Blow/cm)


Undisturbed Sample
Elevation in Meter

Relative Density
Depth in Meter

Consistency

Depth in Meter
Casing

Colour
Scale

_______
Log

Description
N - Value (Blows/30 cm)

0,00410,004
20,004
30,00440,004
50,004
60,004
0.0
0
coklat Lapisan lempung sedikit berpasir halus.

hitam keabu- Lapisan lempung sedikit berpasir halus.


abuan

3.0
3
End Of Boring

LEGEND : Undisturbed samples Disturbed samples

Clay Silt Sand Gravel Limestone


HAND BORING LOG 03
PROJECT : DED IRIGASI TAMBAK KOLONO GROUND WATER ELEVATION : - 1,0 M BORING METHOD : HAND CORE
KAB. KONAWE SELATAN
LOCATION : KOLONO KAB. KONAWE SELATAN BORING STARTED : 24 NOVEMBER 2016 BORE HOLE NO. : HB-03
SITE NO : BORING FINISHED : 24 NOVEMBER 2016 DRILL MASTER : AEP
SITE NAME : TAMBAK KOLONO BORING DEPTH : 3.00 METER LOGGED BY : AEP
GROUND SURFACE ELEVATION : 0,00 M

Recovery %

R.O.D. %
Standard Penetration Test

Number of Blows ( Blow/cm)


Undisturbed Sample
Elevation in Meter

Relative Density
Depth in Meter

Consistency

Depth in Meter
Casing

Colour
Scale

_______
Log

Description
N - Value (Blows/30 cm)

0,00410,004
20,004
30,00440,004
50,004
60,004
0.0
0

coklat Lapisan lempung sedikit berpasir halus.

hitam keabu- Lapisan lempung sedikit berpasir halus.


abuan

3.0
3
End Of Boring

LEGEND : Undisturbed samples Disturbed samples

Clay Silt Sand Gravel Limestone

You might also like