SITE TEST REPORT

ABB TEST REPORT FOR REB500


BCU RELAY

SUBSTATION NAME: 400/230KV S/S PGCIL


TESTING OF CONTROL & RELAY PANEL
Panel Details:
CUSTOMER : M/S. L & T Constructions
END CUSTOMER : M/s.PGCIL
LOCATION : 410 RP-1 KAMUTHI LINE-2
DESIGNATION : BB MAIN1 Protection Relay
RELAY TYPE : REB500
SR.NO : 1968049250003
Aux. Volts : 220V DC
Nominal Current : 1A
Settings:
CT –Primary Current 3000 A
CT-Secondary Current 1A

1. MEASUREMENT CHECK:
 3φ -Current injected in all phases & measurements checked.

CHANNEL
CH. NO INJECTED MEASURED COMMENTS
RATING
1 1A 1A 2998 A Bay-410 R _Phase Current
2 1A 1A 3000 A Bay-410 Y _Phase Current
3 1A 1A 2999 A Bay-410 B _Phase Current

REMARKS: Measurement Checked OK

M/s GE INDIA LTD M/s L & T CONSTRUCTIONS M/s PGCIL

NAME Mr G.RAMESH Mr RATHIESH Mr G.KARTHICK


DESIGNATION COMMISSIONING ENGINEER T&C ENGINEER
SIGNATURE
SITE TEST REPORT

ABB TEST REPORT FOR REB500


BCU RELAY

2. DIFFERENTIAL PROTECTION:
a)Differential Relay Stability testing(Bay-410 and Bay-411):

Bay-1 Bay-2 ID
Diff. Current in
Curent in pri(A) Current in pri(A) pri(A)
Bay-410-I1 3000 (ø = 0º) Bay-411-I1 3000 (ø = 180º) IDL1 0.262
Bay-410-I2 3000 (ø = 240º) Bay-411-I2 3000 (ø = 60º) IDL2 0.394
Bay-410-I3 3000 (ø = 120º) Bay-411-I3 3000 (ø = 300º) IDL3 0.203

b)Differential Pickup:

i) BAY-410 (Secondary):

Phase Diff. Pickup in Amps Operating time


Expected Actual
R 0.200 0.221 32.80 ms
Y 0.200 0.217 35.70ms
B 0.200 0.219 41.10ms

REMARKS: Differential Checked OK

3. LOCAL BREAKER BACKUP:

BAY-410

Setting:
=>In sec=0.2A

PHASE ACTUAL PICKUP T1 T2

M/s GE INDIA LTD M/s L & T CONSTRUCTIONS M/s PGCIL

NAME Mr G.RAMESH Mr RATHIESH Mr G.KARTHICK


DESIGNATION COMMISSIONING ENGINEER T&C ENGINEER
SIGNATURE
SITE TEST REPORT

ABB TEST REPORT FOR REB500


BCU RELAY

RYB 0.198A 110ms 239ms

REMARKS: LBB Checked OK

Checklist
Binary Inputs Checked as per relay assignment OK
Binary Outputs Checked as per relay assignment OK
LED Indicators Checked as per relay assignment OK
Earthing Checked as per scheme assignment OK
Inspect for physical damage/defects Checked-OK

Remarks:
Relay found healthy and fit for service.

M/s GE INDIA LTD M/s L & T CONSTRUCTIONS M/s PGCIL

NAME Mr G.RAMESH Mr RATHIESH Mr G.KARTHICK


DESIGNATION COMMISSIONING ENGINEER T&C ENGINEER
SIGNATURE