STUDENT DEVELPEMENT PROGRAM

Students overall development is ensured through mini projects, unit tests, invited talks and
workshops/seminars. Details of the activities for three academic years are provided in
Table 1 through Table 3.
Table 1 Activities for 2016-17
Sl. Gap Action taken Date Resource person with % of Relevance to
No. designation students POs, PSOs
1 Complex Technical talk on 13/08/2016 Mr. Raghavendra K, 90 PO4, PO6, PSO2
problems, Ethics “Demand Side Assistant Executive
Management” Engineer HESCOM,
Navanagar Hubballi
2 Modern tool, Workshop on 19/08./016 Mr. Ramesh, 85 PO5,PO9,PO10,P
team work “LABVIEW” to LABVIEW Bangaluru SO1, PSO3
21/08/2016
3 Modern tool, Workshop on 12/11/2016 Mr. Kazim Ustad, 90 PO5,PO9 ,PSO1,
team work “PLC Ladder SOPAN O& M Co. Pvt. PSO3
Programming” Ltd., Pune
4 Real problem Technical talk on 03/03/2017 Mr. Raghavendra K 90 PO6,
analysis safety “Substation Assistant Executive PSO1,PSO3
measures. equipments” Engineer HESCOM,
Navanagar, Hubballi
5 Project, team Technical talk on 22/04/2017 Mr.Mallikajun Kambliyal 87 PO08,
work “Energy CEO, PO09,PO11,
Auditing” Sunshub Renewable , PSO3
Hubballi.
6 Synthesis of the Field Visit on 04/03/2017 Mr.C.B Chouhan 85 ,PO6,PO7
information, “220KV Assistant Executive, PSO1,PSO3
safety Substation” 220KV /110KV/11KV
Bidnal Substation,
Hubballi
7 Synthesis of the Field visit on 06/03/2017 Mr.C.B Chouhan, 91 PO6,PO7
information, “220KV Assistant Executive, PSO1,PSO3
safety Substation” 220KV /110KV/11KV
Bidnal Substation,
Hubballi
8 Synthesis of the Field visit on 11/04/2017 Mr.C B Chouhan, 88 PO6,PO7
information, “220KV Assistant Executive, PSO1,PSO3
safety Substation” 220KV /110KV/11KV
Bidnal Substation,
Hubballi
9 Modern tool, Three days 04/05/2017 Mr. Kalaikovan, Trainer 84 PO5,PO9,PO10,P
team work workshop on to and Pradeepkumar, O12,PSO1,
“PLC and 06/05/2017 Assistant Trainer PSO3,PSO2
SCADA System” PROLOFIC Banagalure.
Table 1 Activities for 2016-17 (Contd.)

10 Engineering Lecture on 13/10/2017 Prof. Punagin 80 PO1,PO2,PSO1


knowledge “Electric Circuit 22/10/2017 (Ex. Principal, KLECET
Analysis” 23/10/2017 Belagavi)
24/10/2017
25/10/2017
11 Engineering Mini Projects 08/04/2017 In House faculty 60 PO3,PO9, PO10,
knowledge, team PSO2
work
12 Communication, ADVITIYA 23/09/2016 Tech Fest Committee of 32 PO9,PO10,
team work (i) Paper and the institute PO12,
presentation 24/09/2016 PSO2,PSO3
(ii) Wire your
ways

Table 2. Activities for 2015-16


Sl. Gap Action taken Date Resource person with % of Relevance to
No. designation students POs, PSOs
1 Complex Technical talk on 23/04/2016 Mr.Shivanand Mariguddi 70 PO2, PO6, PSO2
problems, “Latest Manager, Drive
Ethics developments in Department, Ericsson ,
variable speed Australia
drive”
2 Project, team Technical talk on 22/04/2016 Mr. Mohamed Ashraf 85 PO12,PSO3
work “Networking” Mujawar , Network
Engineer, NIT, Bangalore
3 Synthesis of the Industrial visit to 06/02/2016 Mr. Pramod, 80 PO6,PO7
information, Kirloskar Ltd. Assistant Engg, Kirloskar PSO1,PSO3
safety Hubballi Electric Company,
Hubballi
4 Synthesis of the Field Visit to “3 13/05/2016 In house faculty 90 PO3,PO6,PO7
information, MW solar power PSO1,PSO3
safety plant” Chikodi

5 Engineering Lecturer on 06/10/2015 Prof. Punagin, 90 PO1,PO2,PSO1


knowledge “Electric Circuit 07/10/2015 (Ex. Principal, KLECET
Analysis” 13/10/2015 Belagavi)
6 Engineering Mini Projects 13/04/2016 In House faculty 80 PO3,PO9, PO10,
knowledge, PSO2
team work
7 Communication ADVITIYA 26/09/2015 Tech Fest Committee of the 30 PO9,PO10,PO12,
team work (i)Paper and institute PSO2,PSO3
presentation 27/09/2015
(ii)Wire your
ways
Table 3 Activities for 2014-15
Sl. Gap Action taken Date Resource person with % of Relevance to
No. designation students POs, PSOs
1 Synthesis of Technical talk 20/08/2014 Mr. Beevinmara, Executive 85 PO6,PSO2
the on “Safety for Engineer, HESCOM,
information, electric Navanagr Hubli
safety engineers”
2 Modern tool, Work shop on 17/09/2014 Mr. Prashanth A, 80 PO5,PO9,PSO1,
team work “LABVIEW” to Application Engineer PSO2
19/09/2014 VI solutions Bangalore

3 Modern tool, Work shop on 15/09/2014 Mr. Shivakumar Manager, 85 PO5,PO6,PO9,PS


team work “PLC Ladder to Prolific Automation. O1, PSO2
Programming” 17/09/2014 Pvt.Ltd, Bangalore

4 Communicatio ADVITIYA 22/09/2014 Tech Fest Committee of the 10 PO9,PO10,PO12


n, team work 2014 and institute
(i)Paper 23/09/2014
presentation
(ii)Wire your
ways
coordination