SHRI ARVIND ENGINEERING

DAILY PROGRESS REPORT MONTH OF ………………………………………………………………………………………….


S.N. DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 SCAFOLDING ERECTION

2 SCAFOLDING DISTAMENTLING

3 SPIDEK & SPACEK ASSAMBLY

4 SPIDEK & SPACEK ERECTION

5 FILL GREED ERECTION

6 DISTRIBUTION PIPE ERECTION

7 NOZZAL & ADAPTER FIXING

8 DRIFT ELIMINATOR ASEMBLY

9 DRIFT ELIMINATOR ERECTION

10 MOTER GEAR BOX & DRIVE SHAFT ALIGMENT

11 FAN HUB ERECTION

12 FAN ALIGMENT

13 SCREEN INSTALATION

14 FAN STACK ERECTION

15 FAN STACK ALIGMENT

DAILY PROGRESS REPORT MONTH OF ……………………………………………………………………………


S.N. DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

14 OIL LINE FIXING

15 SLUICE GATE INSTALATION

16 FRP LOWER FIXING

17 REMOVAL WALK WAY INSTALATION

18 REMOVAL WALK WAY (GANG WAY)

19 TRAP DOOR INSTALATION

20 FRP INSTALATION

21 JIB CRANE

22 CAGE LADDER