1.1.1.1 CARTEL DE OBRA IMPRESION EN BANNER DE 3.60M X 2.40M. (SOPORTE DE MADERA) 1.00 und
a) CARTEL DE OBRA. 1.00 1.00 - - - 1.00
1.1.2.1 LIMPIEZA DE TERRENO MANUAL 389.15 m²
a) LIMPIEZA DE TERRENO 1.00 1.00 43.00 9.05 - 389.15
1.1.2.2 TRAZO Y REPLANTEO 389.15 m²
a) TRAZO Y REPLANTEO 1.00 1.00 43.00 9.05 - 389.15
1.1.3.1 EXCAVACION PARA CIMIENTOS Y VEREDAS 131.46 m³
a) EJE 1-1,2-2,3-3,4-4, 5-5, TRAMO A-B 5.00 1.00 0.60 0.40 0.60 0.72
c) EJE 1-1,2-2,3-3,4-4,5-5, TRAMO B-G 2.00 5.00 3.12 0.40 0.60 7.49
d) EJE 1-1,2-2,4-4,5-5, TRAMO H-J 2.00 4.00 2.65 0.40 0.60 5.09
e) EJE 3-3, TRAMO H-I 1.00 1.00 2.65 0.40 0.60 0.64
EJE B-B,C-C,D-D,E-E,F-F,G-G, H-H,I-I,
f) 10.00 4.00 0.60 0.40 0.60 5.76
TRAMO 1-5
g) EJE J-J TRAMO 1-2 y 4-5 2.00 1.00 0.60 0.40 0.60 0.29
h) EN VEREDAS 2.00 1.00 43.00 2.00 0.60 103.20
1.1.3.2 EXCAVACION MANUAL PARA ZAPATAS 252.23 m³
a) Z1 1.00 59.00 1.50 1.50 1.90 252.23
I)
1.1.3.3 RELLENO COMPACTADO CON MATERIAL PROPIO 142.17 m³
a) EN RELLENO Z1 1.00 59.00 1.50 1.50 1.00 132.75
b) EJE 1-1,2-2,3-3,4-4, 5-5, TRAMO A-B 5.00 1.00 0.60 0.40 0.20 0.24
d) EJE 1-1,2-2,3-3,4-4,5-5, TRAMO B-G 2.00 5.00 3.12 0.40 0.20 2.50
e) EJE 1-1,2-2,4-4,5-5, TRAMO H-J 2.00 4.00 2.65 0.40 0.20 1.70
f) EJE 3-3, TRAMO H-I 1.00 1.00 2.65 0.40 0.20 0.21
h) EJE J-J TRAMO 1-2 y 4-5 2.00 1.00 0.60 0.40 0.20 0.10
1.1.3.4 NIVELACION DE TERRENO 473.00 m²
a) AREA DE NICHOS 1.00 1.00 43.00 9.00 - 387.00
b) AREA DE VEREDAS 1.00 1.00 43.00 2.00 - 86.00
1.1.3.5 ELIMINACION DE EXCESO DE CORTE CON VOLQUETE CARGUIO A MANO 498.80 m³
a) VOL= 1.00 498.80 - - - 498.80
1.1.4.1.1 SOLDADO DE CONCRETO E= 4" MEZCLA C:H 1:12 132.75 m²
a) Z1 1.00 59.00 1.50 1.50 - 132.75
1.1.4.2.1 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO: HORMIGON + 30% PIEDRA 35.33 m³
a) EJE 1-1,2-2,3-3,4-4, 5-5, TRAMO A-B 5.00 1.00 0.60 0.50 0.60 0.90
b) EJE 1-1,2-2,3-3,4-4,5-5, TRAMO B-C y G-H 2.00 5.00 3.45 0.50 0.60 10.35
c) EJE 1-1,2-2,3-3,4-4,5-5, TRAMO B-G 2.00 5.00 3.12 0.50 0.60 9.36
d) EJE 1-1,2-2,4-4,5-5, TRAMO H-J 2.00 4.00 2.65 0.50 0.60 6.36
e) EJE 3-3, TRAMO H-I 1.00 1.00 2.65 0.50 0.60 0.80
f) EJE B-B,C-C,D-D,E-E,F-F,G-G, H-H,I-I, TRAMO 1-5 10.00 4.00 0.60 0.50 0.60 7.20
g) EJE J-J TRAMO 1-2 y 4-5 2.00 1.00 0.60 0.50 0.60 0.36
1.1.4.3.1 SOBRECIMIENTO: CONCRETO F'C = 175 KG/CM2. 14.72 m³
a) EJE 1-1,2-2,3-3,4-4, 5-5, TRAMO A-B 5.00 1.00 0.60 0.25 0.50 0.38
b) EJE 1-1,2-2,3-3,4-4,5-5, TRAMO B-C y G-H 2.00 5.00 3.45 0.25 0.50 4.31
c) EJE 1-1,2-2,3-3,4-4,5-5, TRAMO B-G 2.00 5.00 3.12 0.25 0.50 3.90
d) EJE 1-1,2-2,4-4,5-5, TRAMO H-J 2.00 4.00 2.65 0.25 0.50 2.65
e) EJE 3-3, TRAMO H-I 1.00 1.00 2.65 0.25 0.50 0.33
f) EJE B-B,C-C,D-D,E-E,F-F,G-G, H-H,I-I, TRAMO 1-5 10.00 4.00 0.60 0.25 0.50 3.00
g) EJE J-J TRAMO 1-2 y 4-5 2.00 1.00 0.60 0.25 0.50 0.15
1.1.4.3.2 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 58.88 m²
a) EJE 1-1,2-2,3-3,4-4, 5-5, TRAMO A-B 5.00 1.00 0.60 - 0.50 1.50
b) EJE 1-1,2-2,3-3,4-4,5-5, TRAMO B-C y G-H 2.00 5.00 3.45 - 0.50 17.25
c) EJE 1-1,2-2,3-3,4-4,5-5, TRAMO B-G 2.00 5.00 3.12 - 0.50 15.60
d) EJE 1-1,2-2,4-4,5-5, TRAMO H-J 2.00 4.00 2.65 - 0.50 10.60
e) EJE 3-3, TRAMO H-I 1.00 1.00 2.65 - 0.50 1.33
g) EJE J-J TRAMO 1-2 y 4-5 2.00 1.00 0.60 - 0.50 0.60
1.1.5.1.1 ZAPATAS CONCRETO F'C= 210 KG/CM2 79.65 m³
a) Z1 1.00 59.00 1.50 1.50 0.60 79.65
1.1.5.2.1 CONCRETO F'C=175 KG/CM2 33.14 m³
a) C1 1.00 59.00 0.30 0.25 5.20 23.01
b) C1 1.00 30.00 0.30 0.25 4.50 10.13
1.1.5.2.3 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 120.15 m²
a) C1 4.00 89.00 0.30 0.25 4.50 120.15
1.1.5.3.1 CONCRETO F'C=175 KG/CM2, VIGAS 18.45 m³
a) EJE 1-1,2-2,3-3,4-4,5-5 TRAMO A-D. 1.00 5.00 12.15 0.25 0.25 3.80
b) EJE 1-1,2-2,3-3,4-4,5-5 TRAMO D-F. 1.00 5.00 10.15 0.25 0.25 3.17
c) EJE 1-1,2-2,4-4,5-5 TRAMO F-J. 1.00 4.00 18.45 0.25 0.25 4.61
d) EJE 3-3. TRAMO F-I. 1.00 1.00 14.28 0.25 0.25 0.89
f) EJE J-J TRAMO 1-2 Y 4-5. 1.00 2.00 2.30 0.25 0.25 0.29
1.1.5.3.3 ENCOFRADO Y DESENCOFRADO EN VIGAS 73.80 m²
a) EJE 1-1,2-2,4-4,5-5 TRAMO A-D. 1.00 5.00 12.15 - 0.25 15.19
b) EJE 1-1,2-2,3-3,4-4,5-5 TRAMO D-F. 1.00 5.00 10.15 - 0.25 12.69
c) EJE 1-1,2-2,4-4,5-5 TRAMO F-J. 1.00 4.00 18.45 - 0.25 18.45
d) EJE 3-3. TRAMO F-I. 1.00 1.00 14.28 - 0.25 3.57
EJE B-B, C-C,D-D, D'-D',E-E, F-F, F'-F',
e) 1.00 10.00 9.10 - 0.25 22.75
G-G, H-H, I-I ; TRAMO 1-5.
f) EJE J-J TRAMO 1-2 Y 4-5. 1.00 2.00 2.30 - 0.25 1.15
1.1.5.4.1 CONCRETO F'C=175 KG/CM2, VIGAS 13.50 m³
a) EJE 1-1,2-2,3-3,4-4, 5-5, TRAMO A-B 5.00 1.00 0.60 0.25 0.35 0.26
c) EJE 1-1,2-2,3-3,4-4,5-5, TRAMO B-G 2.00 5.00 4.40 0.25 0.35 3.85
d) EJE 1-1,2-2,4-4,5-5, TRAMO H-J 2.00 4.00 3.90 0.25 0.35 2.73
e) EJE 3-3, TRAMO H-I 1.00 1.00 3.90 0.25 0.35 0.34
g) EJE J-J TRAMO 1-2 y 4-5 2.00 1.00 0.60 0.25 0.35 0.11
1.1.5.4.3 ENCOFRADO Y DESENCOFRADO EN VIGAS 41.21 m²
a) EJE 1-1,2-2,3-3,4-4, 5-5, TRAMO A-B 5.00 1.00 0.60 - 0.35 1.05
EJE 1-1,2-2,3-3,4-4,5-5, TRAMO B-C y
b) 2.00 5.00 3.45 - 0.35 12.08
G-H
c) EJE 1-1,2-2,3-3,4-4,5-5, TRAMO B-G 2.00 5.00 3.12 - 0.35 10.92
d) EJE 1-1,2-2,4-4,5-5, TRAMO H-J 2.00 4.00 2.65 - 0.35 7.42
e) EJE 3-3, TRAMO H-I 1.00 1.00 2.65 - 0.35 0.93
g) EJE J-J TRAMO 1-2 y 4-5 2.00 1.00 0.60 - 0.35 0.42
1.1.5.5.1 CONCRETO F'C=175 KG/CM2, LOSA ARMADA 186.93 m³
a) LOSAS INTERMEDIAS 1 PISO 5.00 1.00 8.85 5.05 0.10 22.35
b) LOSA INTERMEDIA 1 PISO 5.00 1.00 9.65 5.05 0.10 24.37
c) LOSA INTERMEDIA 1 PISO 5.00 1.00 8.85 5.05 0.10 22.35
d) LOSAS LATERALES OSARIO 1 PISO 8.00 2.00 5.05 1.05 0.10 8.48
e) LOSAS INTERMEDIA 2 PISO 5.00 1.00 8.85 5.05 0.10 22.35
f) LOSAS INTERMEDIAS 2 PISO 5.00 1.00 9.65 5.05 0.10 24.37
g) LOSAS INTERMEDIAS 2 PISO 5.00 1.00 13.00 5.05 0.10 32.83
h) LOSAS LATERALES OSARIOS 2 PISO 8.00 2.00 5.05 1.05 0.10 8.48