BAB VII

PENUTUP

7.1 Hasil Perhitungan

Pada struktur bangunan perkantoran yang harus mampu menahan beban


hidup
250kg/m2 . Material yang digunakan fc’ = 35 Mpa, danfy = 400 Mpa.
SedangkantebalPelat= 150 mm.Sehinggadiperolehgaya-gayadalamsebagaiberikut
:

1. Momen Geser
Nama Mu Pakai Vu Pakai
Balok Mu1 Mu2 Mu3 Vu1 Vu2
B.1 -1008,00 1787,43 -1612,80 2318,40 3597,20
B.2 -2016,00 3689,14 -3225,60 4636,80 7424,40
B.3 -2142,00 3926,86 -3427,20 4926,60 7902,80
B.4 -2142,00 3926,86 -3427,20 4926,60 7902,80
B.5 -1134,00 2025,14 -1814,40 2608,20 4075,60
B.6 -6695,56 6745,60 -6695,56 4603,20 6745,60
B.7 -18425,02 20057,60 -18425,02 12667,20 20057,60
B.8 -20624,29 22553,60 -20624,29 14179,20 22553,60
B.9 -19891,20 21721,60 -19891,20 13675,20 21721,60
B.10 -12560,29 13401,60 -12560,29 8635,20 13401,60
B.11 -2950,11 5002,40 -4720,17 4175,54 6195,28
B.12 -7275,45 13162,69 -11640,72 10297,56 16301,48
B.13 -8273,61 15045,83 -13237,77 11710,34 18633,68
B.14 -9937,20 18184,40 -15899,52 14064,96 22520,68
B.15 -4946,42 8768,69 -7914,27 7001,09 10859,68
B.16 -225,31 554,29 -540,75 1243,73 1784,80
B.17 -225,31 554,29 -540,75 1243,73 1784,80
B.18 -225,31 554,29 -540,75 1243,73 1784,80
B.19 -225,31 554,29 -540,75 1243,73 1784,80
B.20 -225,31 554,29 -540,75 1243,73 1784,80
B.21 -4872,66 7987,50 -7796,25 5977,13 8573,25
B.22 -11517,19 20523,21 -18427,50 14127,75 22028,25
B.23 -13732,03 24701,79 -21971,25 16844,63 26513,25
B.24 -9302,34 16344,64 -14883,75 11410,88 17543,25
B.26 -2577,27 2768,75 -2577,27 2835,00 4430,00
B.27 -5440,91 6018,75 -5440,91 5985,00 9630,00
B.28 -6013,64 6668,75 -6013,64 6615,00 10670,00
B.29 -4581,82 5043,75 -4581,82 5040,00 8070,00
B.31 -7428,65 7577,60 -7428,65 5107,20 7577,60
B.32 -19158,11 20889,60 -19158,11 13171,20 20889,60
B.33 -22823,56 25049,60 -22823,56 15691,20 25049,60

Nama Mu Pakai Vu Pakai


Balok Mu1 Mu2 Mu3 Vu1 Vu2
B.34 -16958,84 18393,60 -16958,84 11659,20 18393,60
B.36 -823,20 1506,40 -1317,12 2163,84 3464,72
B.37 -1402,01 2598,40 -2243,22 3685,29 5976,32
B.38 -1402,01 2598,40 -2243,22 3685,29 5976,32
B.39 -1209,08 2234,40 -1934,52 3178,14 5139,12

Sedangkan gaya-gaya dalam pada kantilever yaitu :

P q DL q LL PDL PLL
Balok (kg/m) (kg/m) (kg) (kg)
B.25 1650 313,75 6862,5 1640,625
B.30 1542 313,75 10762,5 2734,375
B.35 1650 313,75 11895,0 2843,75
B.40 720 313,75 5175,0 2515,625

2. Perencanaan Tulangan

Dari hasilperhitungandiperolehmasing-masingjumlahtulanganpadabalokyaitu :

a. PosisitulanganLenturpadabalok

Nama Tulangan Lentur


Balok Tumpuan Lapangan Tumpuan
B.1 1 D22 1 D22 1 D22
B.2 1 D22 1 D22 1 D22
B.3 1 D22 2 D22 1 D22
B.4 1 D22 2 D22 1 D22
B.5 1 D22 1 D22 1 D22
B.6 2 D22 2 D22 2 D22
B.7 4 D22 4 D22 4 D22
B.8 4 D22 5 D22 4 D22
B.9 4 D22 5 D22 4 D22
B.10 3 D22 4 D22 3 D22
B.11 1 D22 2 D22 2 D22
B.12 2 D22 4 D22 3 D22
B.13 2 D22 4 D22 3 D22
B.14 2 D22 4 D22 4 D22
B.15 1 D22 2 D22 2 D22

Nama Tulangan Lentur


Balok Tumpuan Lapangan Tumpuan
B.16 1 D22 1 D22 1 D22
B.17 1 D22 1 D22 1 D22
B.18 1 D22 1 D22 1 D22
B.19 1 D22 1 D22 1 D22
B.20 1 D22 1 D22 1 D22
B.21 1 D22 2 D22 2 D22
B.22 3 D22 5 D22 4 D22
B.23 3 D22 5 D22 5 D22
B.24 2 D22 4 D22 4 D22
B.26 1 D22 1 D22 1 D22
B.27 1 D22 2 D22 1 D22
B.28 2 D22 2 D22 2 D22
B.29 1 D22 1 D22 1 D22
B.31 2 D22 2 D22 2 D22
B.32 4 D22 4 D22 4 D22
B.33 5 D22 5 D22 5 D22
B.34 4 D22 4 D22 4 D22
B.36 1 D22 1 D22 1 D22
B.37 1 D22 1 D22 1 D22
B.38 1 D22 1 D22 1 D22
B.39 1 D22 1 D22 1 D22
b. Posisi sengkangtulangan geser pada balok

Jarak Sengkang perzona (mm) Jrk Sengkang (0,5 d) (mm) Sengkang yg dipakai (mm)
S1 S2 S1 S2 S1 S2
1273,584 470025,6604 50 50 50 50
527010,6635 283133,744 100 100 100 100
955220,1181 245182,1537 100 100 100 100
955220,1181 245182,1537 100 100 100 100
1061,32 257157,6507 100 100 100 100
795,99 947,6071429 150 150 150 150
267711,4784 440547,7531 200 200 200 200
500653,2531 293338,3648 200 200 200 200
394630,9533 326967,2673 200 200 200 200
459364,7095 326215,7509 150 150 150 150
909,7028571 203057,2164 100 100 100 100
346317,7083 356763,7462 150 150 150 150
328372,6096 363115,9544 150 150 150 150
2313071,832 224873,2422 150 150 150 150
178020,1954 1187116,974 150 150 150 150
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
707,5466667 824,8601036 150 150 150 150
337600,9743 383725,4422 150 150 150 150
3261768,439 209374,2099 200 200 200 200
289441,0085 466364,7149 150 150 150 150
1061,32 1349,135593 100 100 100 100
795,99 947,6071429 150 150 150 150
795,99 947,6071429 150 150 150 150
795,99 947,6071429 150 150 150 150
795,99 947,6071429 150 150 150 150
321367,3447 373154,0532 200 200 200 200
309998,3585 374141,1383 200 200 200 200
194384,5127 746978,8353 200 200 200 200
1061,32 1349,135593 100 100 100 100
177586,3876 744244,6015 100 100 100 100
177586,3876 744244,6015 100 100 100 100
1061,32 1349,135593 100 100 100 100
7.2. Kesimpulan

Adapun kesimpulan yang dapat ditarik dalam pengerjaan tugas besar ini
adalah :

1. Cara yang digunakan untuk mengidentifikasi beban untuk fungsi struktur


adalah dengan memperhitungkan aturan menegenai pembebanan yang tertera
dalam SNI, yang memperhitungkan beban mati dan beban hidup yang
kemudian difaktorkan berdasarkan aturan.
2. Cara yang digunakan dalam menganalisi plat dan balok lantai dengan metode
koefisien momen dan geser yang merupakan metode pendekatan dalam SNI.
Dalam metode ini kita memperhitungkan pembebanan dengan metode tributary
area dan distribusi beban.
3. Perencanaan struktur dibuat berdasarkan momen lentur dan geser yang
didapatkan pada saat analisis struktur yang dipengaruhi oleh diameter tulangan
dan sengkang, momen lentur dan geser dan syarat perencanaan yang terdapat
dalam SNI.

7.3. Saran

Mungkin Saran yang kami berikan hampir tidak ada, karena sebelum
pengerjaan laporan tugas besar ini kami telah dibimbing tentang metode,
perhitungan, serta asistensi selama mengerjakan laporan tugas besar ini.
Adapun Saran yang dapat kami berikan untuk selanjutnya pengerjaan tugas
besar ini, agar dosen memberikan modul terkait tugas besar yang diberikan agar
mahasiswa bias lebih efektif dalam mengerjakan tugas besar ini.
TUGAS BESAR
STS – 6502: PERANCANGAN STRUKTUR BETON I

7