You are on page 1of 16
Licht SPY || Rar Ne |! Transit 17 January 2018 AUTHORITY MEMORANDUM TO t MR. DOMINIC F. KABIGTING OIC, Administrative Department THRU : MR. RANDALE B. ORILLE Acting Manager, MIS Division SUBJECT =: STATUS OF LRT PROJECTS We are pleased to transmit to your office copy of the status of LRT projects as of 31 December 2017 for posting to our website. Thank you. ELEANORE T, DOMINGO Manager, Planning Department ce: Engr. Fernando C, Quiambao, Project Implementation Officer - Unified PMO ‘Address: Line 2 Depot, Marcos Highway, Santolan, Pasig City, M.M., Republic ofthe Philippines Teunkline: 6473479 / 647348: / 6473484 / 6473485 / 6473487 17 January 2018 MEMORANDUM TO ; MR. DOMINIC F. KABIGTING OIC, Administrative Department THRU : MR. RANDALE B. ORILLE ‘Acting Manager, MIS Division SUBJECT: STATUS OF LRT PROJECTS We are pleased to transmit to your office copy of the status of LRT projects as of 31 October 2017 for posting to our website. Thank you. ELEANORE-T. DOMINGO Manager, Planning Department ' ALLAN A. ARQUIZA o1g PROS cc: Engr. Fernando C. Quiambao, Project Implementation Officer - Unified PMO Coosa ur no Eas LIGHT RAIL TRANSIT AUTHORITY PROJECT STATUS REPORT ‘As of Decenber 31, 2017 Giorgi (Pho) Ce Tena Bry 1, LOCALLY: FUNDED PROJECTS Description: The project involves major repalcehabiltaton of existing fines 1 and 2 oling stocks, systems, structures, and facies such as repair lot viedut ofthe cariagenay, ral replacement, replacement of parapet {als in between staions, replacement of gantry anchor bolts al RT kevenue fines, ohabiltaiontepair of ght rail vehicles (LRVS), et. Jobjectives: Designed to address the problems of deteriorating roling ltocks, tracks and facilitos. To increase the number of running tans/LRVs fan wit futher enhance the safety and reliability of the LRT systems. National Government Total: P 7.078 B (based on ota! budgetary requirement from 2011-2016 ont) 2014 to 2020 [A total of 86 projects (2019-2017) were already completed. The olherrehabilaton projects ave sl under lrccurement process (LRTA BAC & PS-DBN) andlor for preparationiresiow and approval of conracs, Terms lot Reference (TOR) and Program of Werk (POW), 12017 Completed Projects 1. Upgrading and Replacement of Ai-conloning System at Line 2 Manlne Stations (January 24, 2017) 2. Installation of Lightning Protection at Santolan Staton (February 3, 2017) [3 Supply, Delivery, Installation, Testing and Commissioning of Socuriy Surveltance (IP CCTV System) (February 24, 2017) 1, Systomatic Replaceman of Gantry Anchor Bols al LAT 1 Revenve Line end Connecting Line |(March t, 2017) 5, Construction of Covered Walkway al Sanilan Station (East Wing) (March 25,2017) (6. Tun-Out Replacement (May 28,2017) 7. Supply and Dekvery of Rall Expansion Joints incuding Accessories (July 7, 2017) ls. Re-ating Equipment (July 7, 2017) 9. Refurtishmont of Brake Operating Unit (BOU) System (July 12, 2017) 0, Supply, Delivery, Installation, Testing and Commissioning of Conveyance System (Cctober #7, 2017) ) Status: On-going Implementation 1. Supply and instalation of UPS and Battery Bank. a all Line 2 Telecom Equipment Room (TER) (80% actual accomplishment, 20% slippage | Terget completion dale: June 2, 2018) 2, Replacement of Waterline Piing System (90.18% actual accomplish, 9.82% slippage | Target complotion dete: October 22, 2017) a. Systematic Replacement of Rong Sock Gangviey (Contractor's equos foie exertion forward VOPEC by PHO Rehab | Target completion dale: November 17,2017) 4. Suply. Ooivery, instalation, Testing and Commisloning of Rolin Stock Simulator 40.0% acti accomplishment, 56.0% sippage|Terget completion date: January 2, 2018) 5. Scissor Lit and Sef-propelled Articulaing Boom (Awaiting response fom GPPB on th inquty of LATA {Loge Department for he clarification of FAT ssu0 6. Acquistion of Transet Wheels (Target completion dale: May 28, 2048) 7, Replacement of rake Operating Unit (BOU) System (Target completion dat: May 8, 2018) Page cfd —______r Eoerent y= [1.2 LRT Line 2 West Extension Projects loescription: The project involves the design and construction of the letersion fr the existng LAT Line 2, th atoal length approximately 3.02 kms ram the Recto station extending westward to the Pier 4 area including tho tunback track, The tree (3) proposed adztonal stations include: (a) [rutuban Station- located next othe Cluster Mal (b) DvisoriaStation- located west ofthe Reclo Avenue and Asuncion ret intersection; ana (o) Pier 4 Staton located SOmeters noth of Zaragoza Steet The projct wil include ightotway acquisiion (ROWA), 2s well a3 procurement ofadiional electomechanical requicements including five (5) neve 4-car rong stocks, FUNDING Eells National Government LIGHT RAIL TRANSIT AUTHORITY PROJECT STATUS REPORT ‘As of December 31,2017 Gecekers ) PHP 10,118.46 (NEDA approved) Buel Ceres uuent moie-2021 Baty * Pre-pracurement Conference is scheduled on Janwary 10, 2018 * On going preparation of bid documents by PS-DBM. © On October 2, 2017, all documents were submited to PS-DBM fr the procurement of Consultancy [Services forthe Concept Design of Givi Works, Electro-Mecharical System (EMS) and Roling Stock, Je MOA forthe transfer of GAA 2018 and 2017 allotment was executed fast September 5, 2017 J» TOR, POW and Approved Budget ofthe Contract (ABC) was already concurred by DOT. J Acquisition of Environmental Compliance Certfcate (ECC) ison process. Je On May 19, 2015, the NEDA Board approved the Line 2 West Extension Project Note: Fund for Ooi Engineering Design (DEO) for LAT Live 2 West Exfenson Project PHP 2006 (C20) sil for cowntcacing by the OOTr. Ational funding of PHP 1.1198 (2016) and PHP 100M (2017 ar stl for downtacing by ino DoT ‘Transport Interchan: Description: The project volves constuction of passenger walkway to and from the LRT2 and MRT Cubao Station. A fly elevated valkway for passengers drect transfer from one riway tne to another. & National Government PHP 450M 217-2018 = On-going evaualion and discussion regarding he proposal, and awaiting nal drat of plans by the Finvest Land tne prior to the execution of MOA, J Received an unsolicited proposal rom Flinves! Lan, inc. regarding the construction of Transport nterchange/Wakway in Cubzo Staton. }» Received on January 31,2017 te signed MOA re: Transfer of Funds from DOTr to LRTA forthe LRT Line [2 West Extension and Transport Interchange Projects. Not: implementation period o be determined, Fund tl for downivedng by he COT. Page ott PROJECT NAME 2, FOREIGN: ASSISTED PROJECTS Gis SOURCE LIGHT RAIL TRANSIT AUTHORITY PROJECT STATUS REPORT ‘As of December 31, 2017 Gllaatnese (Php) Cie on Cee cueLt es J2-4 Line 1 South Extension Project! Project background: The project involves the extension ofthe existing [20,7 kins by an addtional 11.7 km, of which approximately 10.5 km wl be Jlovated and 1.2 km wil be at-grade. The extension wil sta from the existing line's last station at Baclaran and wl traverse tha cites of JPerenaque and Las Pinas in Metro Mania and reach the city of Bacoor. he implementation is through a Public-Private Partnership (PPP) IFnancing Arrangement scheme. The GOP/Public sector components shall le through Oficial Development Assistance (ODA) from Japanese Intemational Cooperation Agency (JICA) and National Government Subsidy JAppcopsation Jovjectives: The project seeks to (a) immediately provide safe, liable and lenvironment- iendly transportation services in Metvo trite end the suburbs (b) immediatly alleviate the worsening trafic conto in the JParanaque-Les Pinas-Cavite area and (c) catalyze commercial |Sevetopment around the ri stations, (GP, JICA-ODA ‘and Private Sector Original otal: PHP 61.5278 \GPH: PHP 30.5938 PS: PHP 30 9348, Revision (Total: PHP 60.8118 \GPH: PHP 29.8768, IPS: PHP 30.9348 IRevision2: (Total: PHP 64.9158, \cPH: PHP 25.3608, IPs: PHP 39.5658 (NEDA Approved) riginat [April 2013 to [april 2017, IRevisec: lath Qtr 2017 to 3rd Qtr 2021 |G0P Portion: 1. Right-OF Way Acquisition (ROWA) sta: Acquired 9.09% equivalent o 202 lots of the required 217 fot of private and pubic ts, Remaining fois are under negotiation andlor expropriation. 2. Relocation site Status: 100% physically completad forthe construction of row houses and amenities, 3, utility Retocation Status: Test relocation fr 34.5KV was completed on November 6, 2017 end the draft MOA for Telcos |companies were submited tothe Legal Depariment of LRTA for egal opinion and awatng the Tecos' submission of updete of Relocation plan, schedule and cos. 4. Relocation of informal Settler Families ('SFs) status: Relocated 43.02% (SF equivalent to 484 ISFs out of 1125 (SF lUnder Package + (525 ISFs): Completed relocation of 484 ISFs ou of 25 IS at Gen Tia, Cavite, There are 7 1SFs relocated in NAIC, Caio & 53 IS opted for C5 Project (n-Ciy) Relocation. Moreover, §(SFs lonted for Beik-Probinsya and 32 ISFs were nt present during actual relocation. Lasly, BSAAC dsquaified 4 ses. Under Package 2 {185 SFs)& 3 (375 ISF6: LRMC wil undertake the actual location, There's anon going bidding forthe dh relocation consultant. ODA Portion; 1, Procurement of Rolling Stock (30trainsets or 120 LRVS) status: DOTr and Milsubishi signed the contract forthe procurement of 120LRVs on [December 1, 2017 2, Expansion of Existing Depot at Baclaran and Construction of New Satellite Depot at Zapote status: On-going procurement. Pre-bid conference conducted lst October 12, 2017. Site vist by lrospectve bidders started on October 13,2017 ‘Funds fr Line 1 SEP ere drecly appropriated and released fo DOT. LRTANS roe s Project Management only and al disbursements are for DOTY’ account Pages of Eelam tur 2.2 Line 2 East Extension Project? Project background: Extension ofthe existing LRT Line by 3.793km Jeasivard from the existing Santoan Staton at Marcos Highway, terminaing atthe intersection of Marcos Highway and Suuong Highway. With two (2) laditiona siatons proposed: 1) Emerald Staion in ont of Robson's evo East Mal and Sta. Lucia East Grand Mellin Canta; and (2) Masinag station near tho junction of Maros & Sumulong Highway in Masinag, JAntpolo City, Jovjectives: The projct wil provide rapid and reliable mode of transit othe east of Manila, and to varios strategic commercial industal, and Jeducatona disticts in Metco Mana eter through direct access frm LRT Line 2 itself or through interconnections with other LRTS or modes of frensport Finns Ceci PH and JICA-ODA LIGHT RAIL TRANSIT AUTHORITY PROJECT STATUS REPORT ‘As of December 31,2017 Gace ctr (Php) Total: PHP 9.5118 GGPH: PHP 6.3988 (ODA: PHP 3.1138 (NEDA Approved) Een) Tita) lorginat l20t2 to2016 Irevisec iaot4-zc17 (excluding DLP) Ge |GOP Portion: a. Consultancy Services for Civil Works Contractor: FOSC-KRNA-Soosung Joint Venture Scopa: DED, Tendering Assistance, Constrvtion Supervision and Defects Liability Pri (DLP) Assistance [Status 100% physically completed as of Decernber 31, 2017 lb, Civil Works Package 1- Construction of Viaduct |Contractor: OM. Consuni, nc, (OMCI) |Scope: Construction of 3.789km Vieduct Status: 100% physically completed. Jin inspection withthe DOTI-PMES, PMO, Consultant & Contractor conducted last May 28-30, 2017 lc. civil Works Package 2- Design and Build of Stations Contractor: D.M, Consunj, nc. (OMG) {contract Duron: 18 months Scope: Design and Build of Two (2) Statons |stalus: On-going construction activities a! Masinag and Emerald Staion, Physical accomplishment 24.83% la. Consultancy Services for ElectroMechanical Contractor: CMX Consortia | Scope: Preparation of Performance Specifications and Tender Documents, Construction Supervision, DLP Assistance, status: On going assistance in the tendering of Contractor. Ongoing intertacing with Civit Works, Physical accomplishment $2.36% lb. Design and Construction of Electro-echanical Equipment - Package 3 Stelus: On-going negotiation, PS-DOTr-TWG Financial bd evaluation reprt forthe rejection of Meruben' lonict Vv with concurrence of ICA, Request to proceed wih the negotiation with Marubeni-DMCI JV approved| by ICA, "ine 2 EEP budgets drety appropriated and released fo DOT, LRTAYS roles Project Management only and al disbursemenls are for DOTr's account Page dod LicHT AE |] Rai “wll” || Transit AUTHORITY MEMORANDUM TO - MR. DOMINIC F. KABIGTING OIC, Administrative Department THRU 7 MR. RANDALE B. ORILLE Acting Manager, MIS Division SUBJECT =: STATUS OF LRT PROSECTS We are pleased to transmit to your effi 31 January 2048 for post website, ing to cur Thank you. : ELEANORE; DOMINGO Manager, Plarining Department ce: Engr. Fernando C. Quiambao, Project Implerertaton Oficer - Unified MO ‘address: Line 2 Depot, Marcos Highway, Santolan, Pasig City, M.M., Republic of the Philippines ‘Trunkline: 6673479 / 6473481 / 6673484 / 6873485 / 6473487, copy of the status of LRT projects as of LIGHT RAIL TRANSIT AUTHORITY PROJECT STATUS REPORT ‘As of January 34,2017 Lene = FUNDING PROJECT CosT Heels SOURCE (GoD Tae Seely SUMS 1, LOCALLY. FUNDED PROJECTS: [A total of 36 projects {2013-2017} were already comploted. The other rehabilitation projacis are sill under procurement process (LRTA BAG & PSDB) andor fr preparaliontevew and approval ol contacts, Terms Jot Reference (TOR) and Program of Werk (POW, 2017 Completed Projects: 1. Upgrading and Replacement of Ai-ondonng Syam at Line 2 Minne Stafon January 24,2017) 2. instalation of Lightning Proecon at Sanilen Staton (February 3, 2017) Supply, Delve, salon Testing aad Conmssoring of Securty Suvellance (CCT System) |(February 24, 2017) 4. Systematic Replacement of Ganty Anchor Bois et LAT 1 Revenue Line and Connecting Line \(March 1, 2017) |6. Construction of Covered Walkway at Santolan Station (East Wing) (March 25, 2017) abilitation Projects [6. Turn-Out Replacement (May 29, 2017) 7. Suppl and Delivery of Rall Expansion Joins incluing Accestoes (uly 7, 2017) 3: Tho projec imelvs mer tpaetehabilteton of oxsing 1. Resaing Equity 7, 2017) lines + and 2 ling stocks ystems, sbucures, and fies suc as Serer a. Refurbishment of Brake Operaing Unt (BOL) Systm (ly 12 2017) lepai co iedut ofthe criagenay, ral replacement, replacement of sere 10. Suppl, Dever, salto, Testing and Carmissonng of Conveyance System parent watsinbtwcen tans, repaceret of gaty anchor bast | Ghent foudetay requenont] 201102000 (elaber 17,2017) [LRT revenue fins, rehabilaionirepat of ight al veces (RVs), ec. lobjectives: Designed to address the problems of deteriorating roling [stocks tacks and facies. To lnrease the numberof runing trains RVs} land wil futher enhance the sofety end reliability of tie LRT systems. {rom 2011-2016 only) status: On-going Implementation I. Supply and Insalion of UPS and Bally Bork tal Line 2 Telecom Equipment Room (TER) (e0% actual accomplish, -20% sippago | Tarot completion dot: June 21, 2018) 2. Replacement of Wolrine Piping System (90.18% actual accomplishment, 982% sippago | Targot completion dts: Octobor 22,2017) 3. Systematic Roplacement of Rong Stock Gangway (Ongoing istttion, Coiactor request fr tne extension forwarded fo VOPEC by PMO Rehab | Target completion dale: Noverber 17,2017) 1s. Supply, Delivery, asain, esting and Commissioning of Roling Stock Simulator |Awating doivory. 40.0% actual accomplishment, 60.0% slnpage Target completion date: January 2, 2018) 5. Scissor Lit and Set-propeed Aculaing Bcom (Awalig response fiom GPPB on tho Inquity of LATA ILoga Doperiment forthe claricaton of FAT issuo ) 6. Acquistion of Trainsst Wheels (Anating delve. Tago compton da: May 28, 2018) 7. Replacoment of Bako Operating Uni (BQU) Sytem (Awaling delivery argo completion dete: May 5, 2019) Pago old Goons i LRT West Extension Projects Description: The projec inves tho design and construction ofthe lexiension for the existing LRT Line 2 wth atta length approximately {3:02kms from the Recto station extending westward lo the Pir 4 area including the turnback tack, The three (8) proposed additonal saions include: (e) Tutuban Staton- located nex tothe Custer Mal; (b) Divisora |stationJocated west ofthe Recto Avanue and Asuncion Strest intersection; and c) Pie 4 Station locaod S0meters north of Zaragoza, [see |The projet wil include ghtot- vay acquislion (ROWA), 2s wel as [procurement of addtional electomechanical requements inching five [6) now 4-car olin stocks. Gone Reis Nafonal Government LIGHT RAIL TRANSIT AUTHORITY PROJECT STATUS REPORT As of January 31, 2017 Cel ata sueMen Goologeee Gi) Sats fe Approve Terms of Relerence (TOR) and Progcam of Work (POW) wih concurence by DOT |. Pre-pocurament Confrence is schoduod on January 10,2018 Jen going preparton of bid documents by PS-DBM. Js On Oatber 2, 2017 al documents were subilted fo PS-08M forthe procurement of Consutancy Senicos or te Concept Oesgnof Civ Works, Electro-Mecherical System (EMS) and Rong Stock. J MOA for tho tanserof GAA 2018 and 2017 loiment was exocutod last September 8, 2017. + TOR, POW and Approved Budget of the Contract (ABC) wos akeady concured by DOTr. > Acqisiion of Enronmentl Compliance Catice (ECO) is on proces. # On May 19,2015, the NEDA Board appoved the Line 2 West Extension Projet Note: Fund fer Detivs Engineering Design (ED) fe LRT Lie 2 Vet dnson Pojoct PHP 200M (CY2048) sor ccomieding by he OO. Addtona unig of PHP 1.1198 2016 and PHP 1004 (2017) asi fr downoad by Ine Dor. PHP 10,118.46M (NEDA approved) aie2021 4.3 Transport Interchange Project - Cubao Interchange Description: The project invokes constuction of passonger wakway to land from the LRT2 and MRT3 Cubao Station. A ful elevated wakway for lpassongers direct transfer om ono ratway line to another. ZL atonal Government [s On-going evaluation and dlscussionrogarding te proposal, and awaling final dra of plans by he Filnvest Land in. prior tothe execution of MOA. ¢ Received an unsolised proposal from Fllnves! Land, In. regarding the constuction of Transport Interchange Wakway in Cubao Station. ¢ Received on January 31, 2017 tho signed MOA re Transfer of Funds fom DOTr lo LRTA forthe LRT Line 2 {West Extension and Transpo Interchange Projets. Noto: inplementatin period to be determined Fund sli or downloedng by the DOT PHP 4508 2017-2018 Page of LIGHT RAIL TRANSIT AUTHORITY PROJECT STATUS REPORT ‘As of Januery 31,2017 z RC uccce enn ERO ECU Rollie (Gal) IMPLEMENTATION NUS |2, FOREIGN- ASSISTED PROJECTS \c0° Porton: 1. Right OF Woy Acquistion (ROWA) sits: Acquired 9.08% enivalnt to 202 ete of the requked 27 lots of private and pub is. Realing ts are under negoaon andlor exproniton, ; 2 Relocation Site j2.1 Line 1 South Extension Project |Status; 100% physically completed for the construction of row houses and amenities. inal Project background The project ivohes the extension of he eisting ee aie [20.7 kms by an adlonal 11.7 km. of which approximael 10.5 kr wi be \GPH: PHP 30.6998 status; Test relocation for 34.5KV was completed on November 6, 2017 and the daft MOA for Telsos [evted and 1.2m i bea grade. Te extension wil stat rm the Ps: PHP 20 9948 lomparies vor submitod tothe Legol Department of LRTAforlagal pinion and ung th Teles! essing in’ nt ttn ot Bactaran and wil averse the cle of ojo Sena sinned nies vee eased [Paranaque and Las Pinas in Metro Manila and reach the city of Bacoor, IRevisiont: [April 2013 to fhoimplemenitonis tough aPublPrvaeParnarship FPP) | gow. yoa.ona [ota PP 60.8148. [Api 207 4. Relocation of informal Seton Failes (Fs) encing Arangement scheme. The GOPIPub sect comporens shal] a priate |GPH: PHP 298768 Sts Reload 9.02% iF equivalent o 484 SF out of 1126 ISFs. fe through Oficial Development Assistance (ODA) om Japanese Sector |PS:PHP 309348 fReviced lUnder Package 1 (525) ISFs: Completed relocation of 484 ISFs out of 626 at Gen. Tres Cavite, There re 7 ternational Cooperation Agendy (CA) end National Gover lath atr.2017 to _|ISFs relocated in Naio, Cavite & 53 ISFs opted for C5 Project (In-City) Relocation, Moreover, § ISFs opted for [Subst Approotatn. levis: lr at.2021 [Bat Prbinsya and 32 (SF wae not resent dng th all rlcalion Las, BSAAC dua 4 SF. ee Hota PHP 6491s Under Package 2 (166 ISF)& 3 (975 SF): LRMC il undareke th actal location There's an on-gohg lotjcivs: The projet cooks to) immediatly pov sal, cote and ean a home tue iienereauee lnvzonmt- indy ranepotaton eens in Mo Mania and tho eee Isburbs (medals ho worsening Kats conn inthe petiipee ikbeue Paranaque-Las Pinas-Cavie area and (c) catalyze commercial 1, Procurement of Rolling Stock (0 trainsets or 120 LRVe) evelopment eound tho statons. sis: OOTrandNtsbih signed the contac he procurement of 120 LRVS cn [Decomer , 2017. Target Schedule of NTP February 2018 I. Expansion of Existing Dopot at Baclaran and Construction of New Satelite Depot st Zapoto Sis: On-going procurement. Presid conference conducted lst October 12, 2017. St stb prospect fcers started on October 12, 2017 Funds forLine 1 SEP ae crelly appropited and reloased to DOT. LRTAS rol Is Projact Management only and all disbursements are for DOTY’ account Pagodcta Eoelsat [2.2 Line 2 East Extension Project? Project background: Extension ofthe existing LRT Line 2 by 3.783km leastad rom the existing Santolan Staton at Marcos Highway, terminating al the intersection of Marcos Highway and Sumulong Highway. With io (2) ational station proposed: (1) Emerad Staton in front of Robinson's Mero East Mal and Sta, Lucia East Grand Malin Canta; and (2) Masinag Station noar the junction of Marcos & Sumulong Highway in btasinag, Antipolo Ci lobjectives: The projec wl provide reid and rlcble mode of tans to te east of Manila, and to various tatogic commercial indus, nd leducaional cstct in Molo Mara ether through diect access from LRT Line 2itset or rough interconnections with other LRTS or modes of lranspot. A Guo Cores GPH and JIGA-ODA LIGHT RAIL TRANSIT AUTHORITY PROJECT STATUS REPORT ‘As of January 34, 2017 Echoes uD} GPH: PHP 6.3988 ODA: PHP 3.1198 (NEDA Approved) CC ae icuent Origins: 2012102016 Revsed jote-2o17 excusing OL?) STATUS [GOP Portion: la. Consultancy Services for Civil Works |Contrctor FOSC:KRNA-Soosung Joint Venture |Scopa: DED, Tendaring Assistance, Construction Suporision and Defects Labilty Patiod (DLP) Assistance Status: Request for reakgnment and extension of contract duration by the Consutant was approved by DOTT. Consultant requesting for adltional conrat to supervise the constuction of Package 2 - Design and Build of Stations. Physiol accomplishment: 100% as of December 31,2017 bv Works Package 1- Construction of Viaduct contacto: .N, Consun Ic. (MC!) Scope: Constuton of 3:7094m Viaduct sia: 100% physical completed, (Joitnspecion vith he DOTr-PMES, PMO, Consutant & Contactor lconducie fast May 2020, 2017) lo. Civil Works Package 2- Design and Bulld of Stations |Contractor: .M. Gonsunj nc. (MCI) [Contract Duration: 18 months 'Scope: Design and Bud of Two (2) Stations Status: On-going construction activites ot Masinag and Emerald Stations. Physical accomplishment: 32.96% as of January 34, 2018 loDA Portion: la. Consultancy Services for Electro-Mechanical Icontractor: CM Consortium |scope: Praparaion of Performance Speccatons and Tender Documents, Construction Supervision, DLP lasistance, status: On-going assistance in tho tendering of Contact [Physical accomplishment 62.77% as of January 31,2018 n-gong interfacing vith Civ. Works. lb. Design and Construction of Electro-Mechanical Equlpmont - Package 3 ‘Stas: On-going negotlaton, Wih approval to proceed in the negoltion wih Maruben-DNECI JV. Payodot The 2 EEP budge! is crecly approptated and released fo DOT. LRTA'S rol Is Projct Management only and l disbursements are for OOTFs account LicHT FR || Rav Ne || Transit 16 March 2018 a AUTHORITY MEMORANDUM To 7 MR, DOMINIC F. KABIGTING OIC, Administrative Department THRU > MR. RANDALE BLE Acting Manager, sion SUBJECT : STATUS OF LRT PROJECTS ‘We are pleased to transmit to your office copy of the status of LRT projects as of 28 February 2018 for posting to our website. Thank you. ELEANORET. DOMINGO Manager, Planning Department ce: Engr. Fernando C. Quiambao, Project Implementation Officer - Unified PMO Address Line 2 Depot, Marcos Highway, Santolan, Pasig City, M.M., Republic of the Philippines Teunkline: 6473479 / 6473481 / 6473484 / 6473685 / 6473487 16 March 2018 MEMORANDUM To : MR. DOMINIC F. KABIGTING OIC, Administrative Department THRU i MR. RANDALE Be Le Acting Manager, bo vision SUBIECT STATUS OF LRT PROJECTS We are pleased to transmit to your office copy of the status of LRT projects as of 28 February 2018 for posting to our website. Thank you. ELEANORE T. DOMINGO Manager, Planning Department tials by: AUZAN A. ARQUIZA Ox, CPRD Bp et cc: Engr. Fernando C. Quiambao, Project Implementation Officer - Unified PMO iaclgad Us Talons Recs Gaeeatcae (Gp) LIGHT RAIL TRANSIT AUTHORITY PROJECT STATUS REPORT ‘As of Februsry 28,2018, GA pera ne 1, LOCALLY- FUNDED PROJECTS 114 LRT Rehabilitation Projects |Description: The project involes major repainiehabiitaion of Jexiting lines 1 and 2 rong stocks, systems, stuctues, and [x total 38 projects (C¥2011-2016) were already compleled. The olervehabitalon projects are sl under procurement rocoss(LRTA BAC & PS-DBM) andlor fo preparaionreview and approval of contacts, Tems of Reference (TOR) and Program af Wok (POW), 018 Completed Projects 1. Supply and installation of UPS and Battery Bank at all Line 2 Telecom Equipment Room (TER) |ebruary 28, 2018) Iz. Replacement of Waterline Piping System (February 26,2018) JRecto Avenue and Asuncion Streot intersection; and (c) Pier 4 Staion located SOmeters noth of Zaragoza Stee. [The project wil include right-of-way acquisition (ROWA), a8 wel as procurement of additonal electromechanical requirements inciding ve (5) now 4-car roting stocks. cits such 2 rpairf viaduct fhe caragway, Total? 70788 a replacement replacement of parapet wal in between stations, (based on total cplacement of gantry anchor bats at LRT revenue fines, National |" budgetary 2011 102020 _ Status: On-going Implementation chabitaoniepairof light all vehicles (LRVS), ec Goverment | seauiremtent from 1, Systematic Replacoment of Roling Stock Gangway (hstaltion completcam, testing sil on-going. Request for 105 2011-2016 ony) calendar days Time Extension aproved) lobjctves: Designed to adiess te problems of deteriorating z. Supply, Delivery, Instalation, Testing and Commissioning of Relig Stock Simulator Jroling stocks, tracks and facilities, To increase the number of (ar final inspection. Request for Time Extension under evaluatiorvapproval of PS-DBM) lunning trainsiLRVs and wil further enhance the safely and 3. Scissor Lift and Self-propelled Articulating Boom (Factory Acceptance Test scheduled on March 19-24, 2018. clabilty ofthe LRT systems. [Awaiting delivery afer FAT.) 4 Acquisition of Trainset Wheels (wating dover. Targa completion date: May 28 2016) 5. Replacement of Brake Operating Unit (BOU) System (Awaiting delivery. Target completion ote May, 2018) |L2LRT Line 2 West Extension Projects /« Bid submission and opening of REI was held on February 1, 2018. For evaluation of eligible bidders. Saar eee « Approved Terms of Relerence (TOR) and Program of Work (POM) wth concurrence by DOT eee ae eee * ani Conference is scheduled on January 10, 2 Ine exlonsan rt sing LRT Lie 2, ih length ae Japproximately 3.02 kms from the Recto station extending westward 's On October 2, 2017, all documenis were submitted to PS-DBM for the procurement of Consultancy Services for the Patent een ore Emerge yt concept Design of cil Works, lecro-Mechanial System (EMS) and Rating Sock bo ' sn 3 Sia 118. é srl ee eo Terao ete, | cocemnt| coher] 10202 |eNOAlrotander of GAA 216 an 207 aleinen wes exces Sepembe & 2017 « TOR, POW and Approved Budget ofthe Contract (ABO) was areal concurred by DOT. «Acquisition of Envicnmental Gomplance Cetiicale (ECC) i an process. ‘On May 18,2015, the NEOA Board approved the Line 2 West Extension Project, oto: Fund tor Detailed Engineering Design (DEO) for LRT Line 2 West Extension Project: PHP 200M (CY201) sil for \dswntoadng by the DOT. Adtona funding of PHP 1.1198 (2016) nd PHP 100M (2017) are stil or downtoadng by the com. Page sa PROJECTNAME Ge. Celt LIGHT RAIL TRANSIT AUTHORITY PROJECT STATUS REPORT ‘As of February 28, 2018, Gol gone (aD Dire Laren Ease 11.3 Transport Interchange Project - Cubao Interchange he proectinvoives constuction of passenger atonal + On-going evaluation and discussion regarding the proposal, and awaiting final drat of plans by the Filinvast Land Inc. prior the execution of MOA, + Received an unsolicited proposal tom Filnvest Land, Inc. regarding the construction of Transpo interchange/Welkway in Description: ‘PHP 4508 2017-2018 |Cubao Station. sshvay atom Bo LRN Cabo Satan Ay | Goverment Recodo amr, 207 te Sed HOR Tlf Funds DOT Io LRTA re LR Ln 2 et ety eee de erent eee sre eoe eee eee |Hote : Implementation period to be determined; Fund stil for downloading by the DOTr. 12, FOREIGN- ASSISTED PROJECTS ao» een og ight Accson (O04) A rota PHP ets: eos 80% svc 22s oe oo 217 et pres ar pb. Renan os er Line som Extnson Proje s1sT0 ests nr oxen : Pare stig 2 ny onan 7. tahch ope ry foe aan jesdating ee reoubeioes “eat PS: PHP 30.904B us: 1 )hysically completed for the construction of row hous amenities. 10.5 km will be elevated and 1.2 km will be at-grade. The extension [Ses 100 erica completed a Ses and ame sista om he xan ne’ it ston acto atte | geayy isin eve te es of Parra nd Las Prasat el and Tot eke |, O'6 ane oor atone SK eeson or atrten ienong adel ra Yeh fewneciy fsa: soa | AR iron he implementations tough @ PublicPvate Patnership (PPP) | GPHWCA-] oss oss April 2017 Financing Arrangement scheme, The GOP/Public sector ps ee 20.8768 Revises, _ {Relocation of informal Sttior Families (ISFs) smoot sa te eogh a Deepen essence FPAESEC ns pp noe) REVS as Rcd LOPLI oat 4h scutl 1255s {ODA from Japanese interational Cooperation Agency (ICA) and ‘3rd ‘Qtr. ‘go21 _ |URder Package 1 (625) ISFs: Completed relocation of 484 ISFs out of 526 at Gen, Trias Cavite. National Government Subsidy Approptiation. Revision?2: |Under Package 2 (165 ISFs) & 3 (375 ISFs): LRMC will undertake the actual relocation. There's an on-going bidding for the Tota lan roteston cst |Objectives: The project seaks to (a) immediately provide safe, 64.9188 ie cd error in angen ses nto eine cid ae Manila and the suburbs (b) immediately alleviate the worsening 25.3508 1. Procurement of Rolling Stock (30 trainsets or 120 LRVs) afc condiion in the Paranaque-Las Pinas-Cavite area and (c) PS: PHP 39,565 |Slatus: For issuance of Notice lo Proceed (NTP). Target schedule of NTP is 4st quarter of 2018, eto commer eee and bel Son. Roa Approved) l2 Expansion of Existing Depot at Baclaran and Construction of New Satelite Depot at Zapote Status: ongoing procurement. Final Technical Evaluation was presented on February 1, 2018. Funds for Line 1 SEP are Grecly appropriated and released to DOTT. LRTAS role is Prec Management only and al dsbursements are for DOTS account repel a FUNDING Rois LIGHT RAIL TRANSIT AUTHORITY PROJECT STATUS REPORT ‘sof February 28,2018 Eels: (ans rel Tata, Ries 12.2 Line 2 East Extension Project” Project background: Extension ofthe existing LRT Line 2 by 3.792km eastard from the existing Santolan Staton at Marcos Highway, terminating athe intersection of Marcos Highway and Sumuiong Highway, With two (2) adona tations proposed: (1) Emerald Station infront of Robinson's Melo East Mell and Sta, Luca East Grand Maltin Cainia; and (2) Masinag Staton near the Junction of Marcos & Sumutong Highivay in Masinag, Antipolo City Objectives: The projec ill prove rapid and reliable mode of transit tothe eas of Manila, and to various strategic commercial industrial, and educational discs in Meto Manila ether through [ict access fiom LRT Line 2 sel or trough interconnections with Jother LRT or modes of vansport GPH and JICA-ODA {Total: PHP 9.5118] GPH: PHP 6.3988 ODA: PHP 3.1138 (NEDA Approved) Orignat 2012 to 2018 Revised: 20142017 Revise: 2014-2019 (exctding DLP) |30° Port |. Consultancy Services for Civil Works \Contrator: FDSC-KRNA-Soosung Joint Venture Scope: DED, Tendering Assistance, Construction Supervision and Defects Lily Period (DLP) Assistance status: 100% physically completed as of Deoember 31, 2017. However, tie Consuitant requesting for edlitonal contrac fo supervise the constuction of Package 2- Design and Buld of Stations. b. civil Works Package 1- Construction of Viaduct Contactor: 0.M. Consunj, Ic. (ONC) Scope: Construction of 3.783km Viaduct Status: 100% physically compleled. Joint inspection with the DOT-PMES, PMO, Consultant & Contactor conducted last May 129-90, 2017 c. Civil Works Package 2- Design and Build of Stations IContractor:.M, Consunji Ie. (OMCI) (Contract Duration: 18 months Scope: Design and Build of Two (2} Stations status: On-going construction aviv al Masinag and Emerald Stations. Physical accomplishmeat: 41.70% as of February 28, 2018 |oDA Portion: ‘Consultancy Services for Electro-Mechanical Icontracor: CMX Consortium scope: Preparation of Performance Specifications and Tender Documents, Construction Supervision, DLP Assistanc. Status: On-going assistance inthe tendering of Contactor. On-going interfacing with Civil Works. [Physical accomplishment: 83.22% as of February 28, 2018 I, Design and Construction of Electro-Mechanical Equipment - Package 3 status: On-going negotiation, With JICA approval to proceed in the negotiation with Macubenk-OMC! WV. "ne 2 EEP budgel is rely appropiated and leased to DOT, LRTAS rola is Project Management only and al Gsbursements are fr OOT?s account : Papel

You might also like