REKAPITULASI MAN POWER

PERIODE : JANUARI 2018


PEKERJAAN : PEMBANGUNAN T/L 150kV RENGAT-PANGKALAN KERINCI (SECTION 1) DAN GI 150 Kv RENGAT EXT
KONTRAKTOR : PT. PERFECT CIRCLE ENGINEERING
WAKTU PELAKSANAAN : 360 HARI KALENDER
KONTRAK NO : 178.PJ.PLN2017/DAN.02.02/UIPII/2017 TGL. 11 AGUSTUS 2017

JANUARI 2018
No POSISI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1 Project Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 Conscruction Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 Purchasing 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
5 Supervisor Foundation 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
6 Supervisor Safety 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7 Supervisor Erection
8 Spervisor EM
9 Surveyor 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
10 Logistic 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2
11 Store keeper 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Team Foundation Bore
12 Pile 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

13 Team Foundation SF 3 3 3 3 3 3 5 5 5 5 5 6 6 6 6 6 6 6 6 6 6
14 Team Erection
15 Driver 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
16 Pembantu Surveyor 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
17 Humas 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
18 Mandor 4 4 4 5 5 5 7 7 7 7 7 8 8 8 8 8 8 8 8 8 8
ERINCI (SECTION 1) DAN GI 150 Kv RENGAT EXT

JANUARI 2018 Keterangan


22 23 24 25 26 27 28 29 30 31
1 1 1 1 1 1 1 1 1 1 orang/hari
1 1 1 1 1 1 1 1 1 1 orang/hari
1 1 1 1 1 1 1 1 1 1 orang/hari
2 2 2 2 2 2 2 2 2 2 orang/hari
3 3 3 3 3 3 3 3 3 3 orang/hari
1 1 1 1 1 1 1 1 1 1 orang/hari
orang/hari
orang/hari
2 2 2 2 2 2 2 2 2 2 orang/hari
2 2 2 2 2 2 2 2 2 2 orang/hari
2 2 2 2 2 2 2 2 2 2 orang/hari

3 3 3 3 3 3 3 3 3 3 team/hari

9 9 9 9 9 9 9 9 9 9 team/hari
team/hari
2 2 2 2 2 2 2 2 2 2 orang/hari
2 2 2 2 2 2 2 2 2 2 orang/hari
1 1 1 1 1 1 1 1 1 1 orang/hari
12 12 12 12 12 12 12 12 12 12 orang/hari