Designed Group Date May, 2018 Structure: COMPOSITE BRIDGES Job No.
Checked Group Date May, 2018
Approved Date May, 2018 Subject: SD 677. ADVANCED BRIDGE
DESIGN
A B C D E
11 600
75 30 0 75 7 5 3 00 75
150 1 50
920
920
20 0 15 50 7 500 15 50 2 00
1400
1400
245
245
100
100
SLOP E=2.5 % SLOPE= 2 .5% SL OPE =2.5% SL OPE= 2.5%
2 50
305
305
250
250
150
150
1500
2 00 2 00
1500
1500
1500
1250
1240
1185
44
44
44
NE OP RENE
B EARINGS
8 70 45 0 18 00 450 1800 4 50 1 800 450 1 800 45 0 870 200 40 0/20 0/44
109 5 22 50 225 0 22 50 2 250 109 5
C
L C
L C C C
L
L L
BEA M 1 BEAM 2 BEA M 3 BEAM 4 BEAM 5
SECTION 1-1
SCA LE 1:25
Braking forces, Earth pressure, Seismic and Temperature stresses, Surcharge and
Resultant deck load will be considered in the design of bridge sub-structure,
foundation and bridge bearings as appropriate.
3
University of Dar Es Salaam, PROJECT: ASSIGNMENT NO # 1
College Of Engineering and Technology. (CoET) DESIGN OF COMPOSITE BRIDGE
E-mail:
Designed Group Date May, 2018 Structure: COMPOSITE BRIDGES Job No.
Checked Group Date May, 2018
Approved Date May, 2018 Subject: SD 677. ADVANCED BRIDGE
DESIGN
12KN/m
48KN/m
12KN/m
48KN/m
0.6m 0.6m
2.25m 2.25m 2.25m
4
University of Dar Es Salaam, PROJECT: ASSIGNMENT NO # 1
College Of Engineering and Technology. (CoET) DESIGN OF COMPOSITE BRIDGE
E-mail:
Designed Group Date May, 2018 Structure: COMPOSITE BRIDGES Job No.
Checked Group Date May, 2018
Approved Date May, 2018 Subject: SD 677. ADVANCED BRIDGE
DESIGN
A. For Shear,
V = 113.75KN
V V V V
a = 0.25m
a 1.0 1.0 1.0
V = 113.75KN
V V V V a = 3.5m
a 1.0 1.0 1.0
7.50KN/m 7.50KN/m