P0022-CS-E-0015

RAPID PROJECT REFINERY TANK FARM

Sheet 1 of 1

REV 1

TESTING OF LIGHTING FIXTURE & REFERENCE DRAWING:


LIGHTING SYSTEM
TAG DESCRIPTION: TAG NO: RATING
LOCATION SYSTEM/DUTY: VOLTAGE
ITEM

VOLTAGE CIRCUIT TEST


DESCRIPTION OF CHECK
DATA
PANEL NO. BRANCH CIRCUIT
CIRCUIT NO. VOLTAGE RESULT REMARKS

RESULT: CALIBRATION DETAILS:


ACCEPTED REJECTED
INSPECTION: Verify the following are in accordance CONTRACTOR IPMT
with design documents
1 Test operation and setting of time switches photoelectric
3 Insulation resistance measurement see this form P0022-CS-E-003
4 Lighting circuit test
5 Inspect phase sequence of receptacle
6 Calibration details of equipment measuring tester
C REMARKS/OBSERVATIONS:

CONTRACTOR QA/QC INSPECTOR IPMT/QA/QC INSPECTOR


NAME: NAME:

SIGNATURE: SIGNATURE:
DATE: DATE: