ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties

Against Major Flood

NEGROS OR. 1ST DISTRICT ENGINEERING OFFICE


Project Name Scope of Work Physical Allocation Implementing
Target (lm.) (P’000) Office

1. Construction of Flood Construction of 500.00 50,000 Negros Or. 1st


Control along Brgy. San Flood DEO
Jose, Manjuyod, Mitigation
Negros Oriental Structure
2. Construction of Flood Construction of 500.00 50,000 Negros Or. 1st
Control along Talaptap Flood DEO
River at Brgy. Cabugan, Mitigation
Bindoy, Negros Structure
Oriental
3. Construction of Flood Construction of 500.00 25,000 Negros Or. 1st
Control along Domolog Flood DEO
River at Brgy. Domolog, Mitigation
Bindoy, Negros Structure
Oriental
4. Construction of Flood Construction of 400.00 20,000 Negros Or. 1st
Control along Martilo Flood DEO
River, La Libertad, Mitigation
Negros Oriental Structure
5. Construction of Flood Construction of 250.00 17,000 Negros Or. 1st
Control along La Flood DEO
Libertad River, La Mitigation
Libertad, Negros Structure
Oriental
6. Construction of Flood Construction of 600.00 15,000 Negros Or. 1st
Control along Calamba Flood DEO
River, Guihulngan City, Mitigation
Negros Oriental Structure
7. Construction of Flood Construction of 400.00 10,000 Negros Or. 1st
Control along Kinayan Flood DEO
River, Guihulngan City, Mitigation
Negros Oriental Structure
8. Construction of Flood Construction of 600.00 10,000 Negros Or. 1st
Control along Hilaitan Flood DEO
River, Guihulngan City, Mitigation
Negros Oriental Structure
9. Construction of Flood Construction of 700.00 5,624 Negros Or. 1st
Control along Hibaiyo Flood DEO
River, Guihulngan City, Mitigation
Negros Oriental Structure
10. Construction of Flood Construction of 300.00 15,000 Negros Or. 1st
Control along Flood DEO
Linothangan River, Mitigation
Canlaon City, Negros Structure
Oriental