If you buy welding consumables for nuclear construction under ASME Section III, you need to read this article which was published in the AWS Welding Journal November 2013 under the boring title: "Tips for Purchasing Welding Consumables for Nuclear Work."
Dissimilar Metals in Heating and Air Conditioning Piping Systems
As published in the ASHRAE Journal, April, 2009
Random Radiography: What the Fabricator and Owner Need to Agree On
as published in Pactical Welding Today, July, 2005
Exploring Temper Bead Welding
as published in the Welding Journal, July 2005 Requires AWS membership to view
Original version of the above article with readable figures
How Good Do Piping System Welds Really Need to Be?
Video of the Burst Test (2Mb file) Described in Above Article
Welding Galvanized Steel - Safely
Welding Grade 91 Revised 9/12
Welding Workmanship
Purge Time Spreadsheet for Piping
World's Best Tungsten Grinder
Backing Flux for Root Passes on Stainless Steel
Rust on Stainless Steel! -- Oh My God!!!
World's Best Pipe Welding Positioner and Gripper
go to: www.weldpositioner.com
Doing GMAW? World's Best Training Tape and Books at:
http://www.weldreality.com/ Reference Materials for Welding Engineers and those who hope to become one
Weldability of Ferritic Steels, Norman Bailey, Abington Publishing
Welding Metalurgy and Weldability of Nickel-based Alloys by DuPont, Lippold
and Kiser, Wiley Publishing
Welding Metallurgy and weldability by Lippold, Wiley Publising
Welding Metallurgy And Weldability Of Stainless Steels by Lippold. and
Kotecki availabe at www.daminakotecki.com
Branch Connection Reinforcing Pad Calculations
ASME B31.9-2012, Building Services Piping, contains a method for determining whether a reinforcing pad is needed for a branch connection. This spreadsheet contains that formula and input data. The industry owes the late Mr. Paul Bourquin, Founding Chairman of B31.9 committee, a big "Thank you!" for developing this formula and the spreadsheet. and for getting it into B31.9 .