BEAM UTILIZATION RATIO REPORT Orion Building Design System 18.0 (04.2012) / Page: BD-1
2 1 0.16
1B14 150/450 0.09 0.08 0.16 0.16
1B13 150/450 0.16 0.08 0.09 0.16
3 1 0.16
1B16 150/450 0.09 0.08 0.16 0.16
1B15 150/450 0.16 0.08 0.09 0.16
4 1 0.16
1B18 150/450 0.09 0.08 0.16 0.16
1B17 150/450 0.16 0.08 0.09 0.16
5 1 0.16
1B20 150/450 0.09 0.08 0.16 0.16
1B19 150/450 0.16 0.08 0.09 0.16
6 1 0.68
1B22 150/450 0.40 0.36 0.68 0.68
1B21 150/450 0.68 0.36 0.40 0.68
A 1 0.63
1B1 150/450 0.36 0.34 0.63 0.63
1B2 150/450 0.54 0.29 0.54 0.54
1B3 150/450 0.53 0.29 0.53 0.53
1B4 150/450 0.54 0.29 0.54 0.54
1B5 150/450 0.63 0.34 0.36 0.63
C 1 0.63
1B6 150/450 0.36 0.34 0.63 0.63
1B7 150/450 0.54 0.29 0.54 0.54
1B8 150/450 0.53 0.29 0.53 0.53
1B9 150/450 0.54 0.29 0.54 0.54
1B10 150/450 0.63 0.34 0.36 0.63
Project: FEEDMILLbasedsaje
BILIK SEJUK MA (*1WS-4NFR-3KN8-FCMZ)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-1
Axis: 1 Storey: 1 Material: C25 / Grade 460 (Type 2) (Links: Grade 250 (Plain))
1B12 L=5000mm 1B11 L=5000mm
BwxH (mm) 150 x 450 150 x 450
Flange BfxHf --- ---
Loads
UDL G=7.08 Q=0 kN/m UDL G=7.08 Q=0 kN/m
26.819
23.109
Shear
Force
(Env.)
-23.109
-26.819
24.001 24.001
14.284 14.284
Moment
(Env.)
-12.649 -12.649
Top SupBar
Side Bars
Project: FEEDMILLbasedsaje
BILIK SEJUK MA (*1WS-4NFR-3KN8-FCMZ)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-2
Axis: 2 Storey: 1 Material: C25 / Grade 460 (Type 2) (Links: Grade 250 (Plain))
1B14 L=5000mm 1B13 L=5000mm
BwxH (mm) 150 x 450 150 x 450
Flange BfxHf --- ---
Loads
UDL G=1.62 Q=0 kN/m UDL G=1.62 Q=0 kN/m
6.173
5.251
Shear
Force
(Env.)
-5.251
-6.173
5.592 5.592
3.187 3.187
Moment
(Env.)
-2.892 -2.892
Top SupBar
Side Bars
Project: FEEDMILLbasedsaje
BILIK SEJUK MA (*1WS-4NFR-3KN8-FCMZ)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-3
Axis: 3 Storey: 1 Material: C25 / Grade 460 (Type 2) (Links: Grade 250 (Plain))
1B16 L=5000mm 1B15 L=5000mm
BwxH (mm) 150 x 450 150 x 450
Flange BfxHf --- ---
Loads
UDL G=1.62 Q=0 kN/m UDL G=1.62 Q=0 kN/m
6.171
5.253
Shear
Force
(Env.)
-5.253
-6.171
5.587 5.587
3.192 3.192
Moment
(Env.)
-2.891 -2.891
Top SupBar
Side Bars
Project: FEEDMILLbasedsaje
BILIK SEJUK MA (*1WS-4NFR-3KN8-FCMZ)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-4
Axis: 4 Storey: 1 Material: C25 / Grade 460 (Type 2) (Links: Grade 250 (Plain))
1B18 L=5000mm 1B17 L=5000mm
BwxH (mm) 150 x 450 150 x 450
Flange BfxHf --- ---
Loads
UDL G=1.62 Q=0 kN/m UDL G=1.62 Q=0 kN/m
6.171
5.253
Shear
Force
(Env.)
-5.253
-6.171
5.587 5.587
3.192 3.192
Moment
(Env.)
-2.891 -2.891
Top SupBar
Side Bars
Project: FEEDMILLbasedsaje
BILIK SEJUK MA (*1WS-4NFR-3KN8-FCMZ)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-5
Axis: 5 Storey: 1 Material: C25 / Grade 460 (Type 2) (Links: Grade 250 (Plain))
1B20 L=5000mm 1B19 L=5000mm
BwxH (mm) 150 x 450 150 x 450
Flange BfxHf --- ---
Loads
UDL G=1.62 Q=0 kN/m UDL G=1.62 Q=0 kN/m
6.173
5.251
Shear
Force
(Env.)
-5.251
-6.173
5.592 5.592
3.187 3.187
Moment
(Env.)
-2.892 -2.892
Top SupBar
Side Bars
Project: FEEDMILLbasedsaje
BILIK SEJUK MA (*1WS-4NFR-3KN8-FCMZ)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-6
Axis: 6 Storey: 1 Material: C25 / Grade 460 (Type 2) (Links: Grade 250 (Plain))
1B22 L=5000mm 1B21 L=5000mm
BwxH (mm) 150 x 450 150 x 450
Flange BfxHf --- ---
Loads
UDL G=7.08 Q=0 kN/m UDL G=7.08 Q=0 kN/m
26.819
23.109
Shear
Force
(Env.)
-23.109
-26.819
24.001 24.001
14.284 14.284
Moment
(Env.)
-12.649 -12.649
Top SupBar
Side Bars
Project: FEEDMILLbasedsaje
BILIK SEJUK MA (*1WS-4NFR-3KN8-FCMZ)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-7
Axis: A Storey: 1 Material: C25 / Grade 460 (Type 2) (Links: Grade 250 (Plain))
1B1 L=4800mm 1B2 L=4800mm 1B3 L=4800mm
BwxH (mm) 150 x 450 150 x 450 150 x 450
Flange BfxHf --- --- ---
Loads
UDL G=7.08 Q=0 kN/m UDL G=7.08 Q=0 kN/m UDL G=7.08 Q=0 kN/m
25.924 23.81 23.789
Shear
Force
(Env.)
-22.076 -23.796 -23.789
22.309
19.082 19.179 18.918 18.918
12.668
Moment
(Env.)
-11.907 -10.222 -10.423
Top SupBar
Side Bars
Project: FEEDMILLbasedsaje
BILIK SEJUK MA (*1WS-4NFR-3KN8-FCMZ)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-8
Axis: A Storey: 1 ... Material: C25 / Grade 460 (Type 2) (Links: Grade 250 (Plain))
1B4 L=4800mm 1B5 L=4800mm
BwxH (mm) 150 x 450 150 x 450
Flange BfxHf --- ---
Loads
UDL G=7.08 Q=0 kN/m UDL G=7.08 Q=0 kN/m
23.796 22.076
Shear
Force
(Env.)
-23.81 -25.924
22.309
19.179 19.082
12.668
Moment
(Env.)
-10.222 -11.907
Top SupBar
Side Bars
Project: FEEDMILLbasedsaje
BILIK SEJUK MA (*1WS-4NFR-3KN8-FCMZ)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-9
Axis: C Storey: 1 Material: C25 / Grade 460 (Type 2) (Links: Grade 250 (Plain))
1B6 L=4800mm 1B7 L=4800mm 1B8 L=4800mm
BwxH (mm) 150 x 450 150 x 450 150 x 450
Flange BfxHf --- --- ---
Loads
UDL G=7.08 Q=0 kN/m UDL G=7.08 Q=0 kN/m UDL G=7.08 Q=0 kN/m
25.924 23.81 23.789
Shear
Force
(Env.)
-22.076 -23.796 -23.789
22.309
19.082 19.179 18.918 18.918
12.668
Moment
(Env.)
-11.907 -10.222 -10.423
Top SupBar
Side Bars
Project: FEEDMILLbasedsaje
BILIK SEJUK MA (*1WS-4NFR-3KN8-FCMZ)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-10
Axis: C Storey: 1 ... Material: C25 / Grade 460 (Type 2) (Links: Grade 250 (Plain))
1B9 L=4800mm 1B10 L=4800mm
BwxH (mm) 150 x 450 150 x 450
Flange BfxHf --- ---
Loads
UDL G=7.08 Q=0 kN/m UDL G=7.08 Q=0 kN/m
23.796 22.076
Shear
Force
(Env.)
-23.81 -25.924
22.309
19.179 19.082
12.668
Moment
(Env.)
-10.222 -11.907
Top SupBar
Side Bars
Project: FEEDMILLbasedsaje
BILIK SEJUK MA (*1WS-4NFR-3KN8-FCMZ)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-11
Project: FEEDMILLbasedsaje