Monitoring No Description on progress already sent List for Rotating WMS 1 Allignment BFW Pump 2 Allignment FD Fan
List for Static WMS
1 Assembly, Dissambly and Transporting Crane 250T v 2 Installation Economizer and Stack v 3 Installation Boiler Package v 4 Installation Deaerator v 5 Installation Deaerator Structure v 6 Installation Economizer Structure v 7 Installation Stack Structure v 8 Installation BFW Pump v 9 Installation Burner 10 Installation Blowdown Tank v 11 Installation Inlet Duct and Casing v 12 Installation Boiler Structure 13 Installation FD Fan v 14 Installation Sootblower 15 Installation Dosing Pump 16 Installation FD Fan Structure v 17 Installation BFW Pump Structure v 18 Installation Refractory of Boiler oring approved