Republic of the Philippines

Office of the City Engineer


City of Zamboanga

Construction
Rehabilitation
Replacement
Completion

Statement of Work Accomplished as of _______________________


Construction of Footbridge @ Sitio Mala , Panubigan, Zamboanga City

Weighted ACTUAL PERCENT ACCOMPLIS


ITEM QUANTITY UNIT TOTAL COST
DESCRIPTION
NO.
Percent PREVIOUS THIS
% % %
SPL-1 HAULING OF MATERIALS 15.00 TRIPS 152,080.32 7.625760% 20.32% 54.68%
103 LAYOUT AND EXCAVATION 1.00 LOT 75,305.04 3.776019% 20.32% 54.68%
SPL-2 FABRICATION OF PRECAST CONCRETE PILE 76.00 UNITS 455,690.30 22.849669% 20.32% 54.68%
404 REINFORCING STEEL 4540.56 KGS 306,773.73 15.382549% 20.32% 54.68%
405 STRUCTURAL CONCRETE 37.43 CU.M 348,732.61 17.486492% 20.32% 54.68%
SPL-3 RAILINGS 37.43 LN.M 618,300.10 31.003409% 20.32% 54.68%
SPL-4 TEMPORARY FACILITY 1.00 UNIT 17,947.66 0.899949% 20.32% 54.68%
SPL-5 SAFETY & HEALTH 1.00 LOT 13,800.64 0.692005% 20.32% 54.68%
SPL-6 PROJECT BILLBOARD/SIGNANGE 5.76 SQ.M 5,666.73 0.284147% 20.32% 54.68%
TOTAL 1,994,297.13 100.0%
Certified as implemented in accordance with plans and specifications
Certified that all materials used for the said project
pass all requirements of the MTQC and in conformity
QAHAR A. MAMACOL RAYMOND F. BUCOY to the standard qualifications and special provision of
Contractor Project Engineer CEO Proj. Engineer the contract

Conformed: Approved: SHERWIN ALAN RABAGO


Chief MTQC Division
ENGR. ROMEO P. HISO Engr. CHRISTOPHER Q. NAVARRO, MPA
Const. & Maint Chief City Engineer

AYESHIA GENERAL TR
c of the Philippines
the City Engineer
of Zamboanga

Billing No. ___________________________________


Effectivity of Contract _________________________
Expiration of Contract _________________________
Accomplishment to date _______________________

lished as of _______________________
@ Sitio Mala , Panubigan, Zamboanga City

Weighted Accomplished to
ACTUAL PERCENT ACCOMPLISHED Total
date

TOTAL
- -
%
75.00% 6.608994% 131,802.97
75.00% 3.776019% 75,305.04
75.00% 21.647073% 431,706.96
75.00% 15.240924% 303,949.31
75.00% 21.692811% 432,619.11
75.00% 4.160983% 82,982.36
75.00% 0.899949% 17,947.66
75.00% 0.692005% 13,800.64
75.00% 0.284147% 5,666.73
75.00% 1,495,780.78

TOTAL AMOUNT TO DATE ₱1,495,780.78


LESS PREVIOUS COLLECTION ₱405,151.20
AMOUNT DUE THIS COLLECTION ₱1,090,629.58

Certified that the amount and work ccomplished stated


above are correct and all labor & materials in connection
with the project were already paid and payment thereof
is inquired.
above are correct and all labor & materials in connection
with the project were already paid and payment thereof
is inquired.

AYESHIA GENERAL TRADING CONSTRUCION & MAINTENANCE


Contractor
Republic of the Philippines
OFFICE OF THE CITY ENGINEER
City of Zamboanga

Date
THE CITY ENGINEER
Zamboanga City

Sir,

As per inspection conducted of Construction of Footbridge at Sitio Mala, Panubigan, Zamboanga City, which
is undertaked by contract with AYESHIA GEN. TRADING CONSTRUCTION & MAINTENANCE it was found out that
the contractor accomplished the following items of work

Actual %
Weighted Percent Accomplished
Item No. Description to Accomplished %
% Date
SPL-1 HAULING OF MATERIALS 7.625760% 75.00% 6.608994%
103 LAYOUT AND EXCAVATION 3.776019% 75.00% 3.776019%
SPL-2 FABRICATION OF PRECAST CONCRETE PILE 22.849669% 75.00% 21.647073%
404 REINFORCING STEEL 15.382549% 75.00% 15.240924%
405 STRUCTURAL CONCRETE 17.486492% 75.00% 21.692811%
SPL-3 RAILINGS 31.003409% 75.00% 4.160983%
SPL-4 TEMPORARY FACILITY 0.899949% 75.00% 0.899949%
SPL-5 SAFETY & HEALTH 0.692005% 75.00% 0.692005%
SPL-6 PROJECT BILLBOARD/SIGNAGE 0.284147% 75.00% 0.284147%

In this connection. It is recommended that the contractor can collect 75% completion equivalent to P1,495,780.78
of the contract

Very truly yours,

RAYMOND F. BUCOY CRISZALDY PONCE


CEO Project Engineer Asst. Project Engineer