PEMERINTAH KOTA PEKANBARU

DINAS PENDIDIKAN
JALAN PATTIMURA NO. 40 A TELP. (0761) 42788
PEKANBARU

KEGIATAN :

PEMBANGUNAN SMAN BARU

ENGGINER ESTIMATE
(EE)

PEKERJAAN :
PEMBANGUNAN SMAN BARU , 4 RKB BERTINGKAT

LOKASI :

PEKANBARU
REKAPITULASI ( OWNER ESTIMATE )
KEGIATAN : PEMBANGUNAN SMAN BARU
PEKERJAAN : PEMBANGUNAN SMAN BARU , 4 RKB BERTINGKAT
LOKASI : TAMPAN

NO PEKERJAAN JUMLAH HARGA

1 2 3

LANTAI I
I PEKERJAAN PERSIAPAN Rp. 5,500,000.00
II PEKERJAAN TANAH DAN PONDASI Rp. 117,749,236.93
III PEKERJAAN STRUKTUR Rp. 248,174,425.44
IV PEKERJAAN DINDING & PLESTERAN Rp. 120,691,716.24
V PEKERJAAN PINTU DAN JENDELA Rp. 70,243,470.05
VI PEKERJAAN PLAFOND Rp. 46,729,872.51
VII PEKERJAAN LANTAI Rp. 126,634,400.86
VIII PEKERJAAN ALAT PENGGANTUNG Rp. 18,495,020.00
IX PEKERJAAN INSTALASI LISTRIK Rp. 9,117,600.00
X PEKERJAAN INSTALASI AIR Rp. 2,473,450.00
XI PEKERJAAN PENGECATAN Rp. 29,203,790.79
XIII PEKERJAAN TANGGA 1 UNIT Rp. 16,575,449.88
XIV PEKERJAAN LUAR BANGUNAN Rp. 24,173,874.82
JUMLAH HARGA LANTAI I Rp. 835,762,307.52

LANTAI II
I PEKERJAAN STRUKTUR Rp. 93,058,783.74
II PEKERJAAN DINDING & PLESTERAN Rp. 108,559,772.24
III PEKERJAAN PINTU DAN JENDELA Rp. 59,449,912.05
IV PEKERJAAN KUDA - KUDA & ATAP Rp. 122,128,430.00
V PEKERJAAN PLAFOND Rp. 36,224,252.00
VI PEKERJAAN LANTAI Rp. 54,650,452.00
VII PEKERJAAN ALAT PENGGANTUNG Rp. 18,145,290.00
VIII PEKERJAAN INSTALASI LISTRIK Rp. 10,236,200.00
IX PEKERJAAN PENGECATAN Rp. 27,341,149.82
JUMLAH HARGA LANTAI II Rp. 529,794,241.84
( A ) JUMLAH HARGA PEKERJAAN Rp. 1,365,556,549.36
( B ) Pajak Pertambahan Nilai (PPN) = (A) x 10% Rp. 136,555,654.94
( C ) Jumlah Total Harga Pekerjaan = (A) + (B) Rp. 1,502,112,204.29
DIBULATKAN Rp. 1,502,112,000.00

Terbilang :
Satu Milyar Lima Ratus Tiga Puluh Tujuh Juta Empat Ratus Lima Puluh Sembilan Ribu Rupiah.

Pekanbaru, 2013

DIBUAT OLEH :
KEPALA BIDANG PENGEMBANGAN SM
DINAS PENDIDIKAN KOTA PEKANBARU
Selaku Kuasa Pengguna Anggaran/PPK

H. ADDAURI, M.Pd
Nip. 195703141978011002
OWNER ESTIMATE ( O E )
KEGIATAN : PEMBANGUNAN SMAN BARU
PEKERJAAN : PEMBANGUNAN SMAN BARU , 4 RKB BERTINGKAT
LOKASI : TAMPAN

HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
( Rp. ) ( Rp. )

A. LANTAI I

I. PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi 1.000 Ls 1,500,000.00 1,500,000.00
2 Pek. Pembongkaran 1.000 Ls 2,000,000.00 2,000,000.00
3 Pek. Pasang Bouwplank / Pengukuran 1.000 Ls 1,500,000.00 1,500,000.00
4 Pek. Pasang Papan Nama proyek 1.000 Bh 500,000.00 500,000.00
Sub Total 5,500,000.00

II. PEKERJAAN TANAH DAN PONDASI


1 Pek. Galian Tanah Pondasi 105.605 M3 26,560.00 2,804,868.80
2 Pek. Urugan Kembali Bekas Galian 35.202 M3 12,732.00 448,187.62
3 Pek. Urugan Pasir Bawah Pondasi 6.966 M3 150,240.00 1,046,526.77
4 Pek. Cor Lantai Kerja 1 : 3 : 5 6.966 M3 674,440.00 4,697,946.71
5 Pek. Cor Pondasi Setempat ( P1 ) Beton Bertulang 7.840 M3 2,854,540.00 22,379,593.60
6 Pek. Cor Pondasi Setempat ( P ) Beton Bertulang 2.160 M3 3,094,540.00 6,684,206.40
7 Pek. Cor Kolom ( K ) bawah lantai Beton Bertulang 1.472 M3 5,855,490.00 8,619,281.28
8 Pek. Cor Kolom ( K1 ) bawah lantai Beton Bertulang 0.431 M3 5,891,490.00 2,540,705.06
8 Pek. Cor Balok Sloof ( S ) Beton Bertulang 4.008 M3 3,704,470.00 14,847,515.76
9 Pek. Cor Balok Sloof ( S1 ) Beton Bertulang 8.448 M3 4,100,470.00 34,640,770.56
10 Pek. Pas. Batu Bata camp. 1 : 4 Pas 1 Batu 69.656 M2 219,320.00 15,276,844.26
11 Pek. Pas. Raben Batu Bata camp. 1 : 4 139.311 M2 27,010.00 3,762,790.11
Sub Total 117,749,236.93

III. PEKERJAAN STRUKTUR


1 Pek. Cor Kolom ( K ) Beton Bertulang 5.587 M3 5,855,490.00 32,715,793.73
2 Pek. Cor Kolom ( K1 ) Beton Bertulang 1.455 M3 5,891,490.00 8,572,117.95
3 Pek. Cor Kolom ( K2 ) Beton Bertulang 0.330 M3 5,375,490.00 1,773,911.70
4 Pek. Cor Kolom ( K3 ) Beton Bertulang 0.176 M3 4,655,490.00 819,366.24
5 Pek. Cor Kolom ( K4 ) Beton Bertulang 0.864 M3 4,655,490.00 4,022,343.36
6 Pek. Cor Kolom Praktis 11/11 Beton Bertulang 1.310 M' 64,720.00 84,750.84
7 Pek. Cor Balok Lantai (B) Beton Bertulang 10.158 M3 4,729,730.00 48,044,597.34
8 Pek. Cor Balok Lantai (B1) Beton Bertulang 5.395 M3 5,593,730.00 30,179,292.10
9 Pek. Cor Balok Lantai (B2) Beton Bertulang 2.881 M3 4,243,730.00 12,228,053.37
10 Pek. Cor Balok Lantai (B3) Beton Bertulang 0.092 M3 4,674,800.00 431,671.03
11 Pek. Cor Balok Lantai (B4) Beton Bertulang 0.442 M3 4,614,800.00 2,037,895.68
12 Pek. Cor Balok Lantai (BA) Beton Bertulang 0.000 M3 5,130,800.00 0.00
13 Pek. Cor Plat Lantai, t = 12 cm Beton Bertulang 23.376 M3 4,187,860.00 97,893,405.19
14 Pek. Cor Kanopi Beton t = 8 cm 1.819 M3 3,827,860.00 6,963,642.91
15 Pek. Cor Balok Praktis/Latai 37.200 M' 64,720.00 2,407,584.00
Sub Total 248,174,425.44

IV. PEKERJAAN DINDING & PLESTERAN


1 Pek. Pas. Dinding Bata 1 : 2 123.376 M2 111,700.00 13,781,099.20
2 Pek. Pas. Dinding Bata 1 : 4 358.642 M2 102,490.00 36,757,218.58
3 Pek. Plasteran Dinding Bata 1 : 2 246.752 M2 53,510.00 13,203,699.52
4 Pek. Plasteran Dinding Bata 1 : 4 688.834 M2 46,740.00 32,196,101.16
5 Pek. Pas. Relief dinding luar bawah kusen jendela 26.100 M' 120,000.00 3,132,000.00
6 Pek. Pas. Batu Andesit pada dinding depan bagian luar 19.800 M2 328,280.00 6,499,944.00
(Setinggi ambang kosen)
7 Pek. Pas. Plasteran Tali Air 1.000 Ls 3,500,000.00 3,500,000.00
8 Pek. Ornamen Kaki Tiang Teras (relief + batu andesit) 6.000 Unit 1,500,000.00 9,000,000.00
9 Pek. Afwerking Beton 80.741 M2 32,470.00 2,621,653.78
Sub Total 120,691,716.24
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
( Rp. ) ( Rp. )

V. PEKERJAAN PINTU DAN JENDELA


1 Pek. Pas. Kosen Pintu Dan Jendela 2.844 M3 10,013,450.00 28,482,257.18
2 Pek. Pas. Pintu Panel (Kayu Surian) 13.345 M2 407,450.00 5,437,420.25
3 Pek. Pasang Jendela Kaca Bingkai 5 mm (Bening) 34.650 M2 459,750.00 15,930,337.50
4 Pek. Pasang Kaca Mati 5 mm (Buram) 2.760 M2 150,337.00 414,930.12
5 Pek. Pasang Ventilasi papan jalusi 21.940 M2 416,250.00 9,132,525.00
6 Pek. Pasang Pintu Folding gate 12.760 M2 850,000.00 10,846,000.00
Sub Total 70,243,470.05

VI. PEKERJAAN PLAFOND


1 Pek. Pas. Rangka Plafond Metal Furing 404.912 M2 70,200.00 28,424,822.40
2 Pek. Pas. Plafond Gypsum Board t = 9 mm 404.912 M2 37,850.00 15,325,919.20
3 Pek. Pas. List Gypsum 263.407 M' 11,310.00 2,979,130.91
Sub Total 46,729,872.51

VII. PEKERJAAN LANTAI


1 Pek. Urugan Tanah Bawah Lantai dipadatkan 45.900 M3 96,840.00 4,444,956.00
2 Pek. Urugan Pasir Bawah Lantai 11.475 M3 150,240.00 1,724,004.00
3 Pek. Cor Lantai 1 : 3 : 5 16.538 M3 674,440.00 11,153,551.50
4 Pek. Pas. Lantai Keramik Ruangan 40 x 40 cm 498.600 M2 189,170.00 94,320,162.00
5 Pek. Pas. Lantai Keramik Selasar 40 x 40 cm 65.500 M2 189,170.00 12,390,635.00
6 Pek. Pas. Plint Keramik 10/40 cm 104.294 M' 24,940.00 2,601,092.36
Sub Total 126,634,400.86

VIII. PEKERJAAN ALAT PENGGANTUNG


1 Pek. Pas. Kunci Tanam 2x slaag 6.000 Bh 138,320.00 829,920.00
2 Pek. Pas. Engsel Pintu 27.000 Bh 27,110.00 731,970.00
3 Pek. Pas. Grendel Pintu 12.000 Bh 28,110.00 337,320.00
4 Pek. Pas. Engsel Jendela 154.000 Bh 23,740.00 3,655,960.00
5 Pek. Pas. Grendel Jendela 154.000 Bh 23,110.00 3,558,940.00
6 Pek. Pas. Hak Angin Jendela 154.000 Bh 40,610.00 6,253,940.00
7 Pek. Pas. Tangan - tangan Jendela 77.000 Bh 40,610.00 3,126,970.00
Sub Total 18,495,020.00

IX. PEKERJAAN INSTALASI LISTRIK


1 Pek. Pas. Titik Lampu & Stop Kontak 24.000 Ttk 175,000.00 4,200,000.00
2 Pek. Pas. Stop Kontak 5.000 Ttk 13,800.00 69,000.00
3 Pek. Pas. Saklar Tunggal 4.000 Bh 18,400.00 73,600.00
4 Pek. Pas. Saklar Ganda 3.000 Bh 20,000.00 60,000.00
5 Pek. Pas. Lampu TL ARM Reflexion Mirror 2 x 18 wat 12.000 Bh 325,000.00 3,900,000.00
6 Pek. Pas. Lampu Save Energy 18 Wat 7.000 Bh 45,000.00 315,000.00
7 Pek. Pas. Main Panil Box (Standar PLN) 1.000 Unt 500,000.00 500,000.00
Sub Total 9,117,600.00

X. PEKERJAAN INSTALASI AIR


1 Pek. Pas. Instalasi Air Bersih PVC Ø 1/2" 5.000 M' 15,240.00 76,200.00
2 Pek. Pas. Instalasi Air Bersih PVC Ø 3/4" 50.000 M' 17,570.00 878,500.00
3 Pek. Pas. Instalasi Air Bekas PVC Ø 3" 15.000 M' 101,250.00 1,518,750.00
Sub Total 2,473,450.00

XI. PEKERJAAN PENGECATAN


1 Pek. Cat Air Dinding dan Kolom 1,016.327 M2 16,080.00 16,342,534.94
2 Pek. Cat Air Plafond 404.912 M2 16,080.00 6,510,984.96
3 Pek. Cat Vernish Pintu Panil 26.690 M2 32,630.00 870,894.70
4 Pek. Cat Minyak Jendela, papan jalusi, kusen pintu, jendela 180.897 M2 30,290.00 5,479,376.19
Sub Total 29,203,790.79
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
( Rp. ) ( Rp. )

XII. PEKERJAAN MEJA LABOR


1 Pek. Cor Meja Labor 0.830 M3 3,827,860.00 3,178,654.94
2 Pek. Pas. Lantai Keramik Meja Labor 20/20 10.380 M2 164,170.00 1,704,084.60
3 Pek. Pas. Dinding Keramik Meja Labor 20/25 8.650 M2 155,670.00 1,346,545.50
4 Pek. Pas. Kosen Klas II 0.179 M3 6,263,450.00 1,122,410.24
5 Pek. Pas. Pintu Panel Klas II 8.259 M2 414,750.00 3,425,254.35
6 Pek. Pasang Engsel Pintu Meja Labor 7.560 M' 20,000.00 151,200.00
7 Pek. Pas. Kunci Meja labor 8.000 Bh 40,000.00 320,000.00
8 Pek. Pas. Wastafel Meja Labor 4.000 Bh 400,000.00 1,600,000.00
9 Pek. Pas. Kran Air 4.000 Bh 37,230.00 148,920.00
Sub Total 12,997,069.63

XIII. PEKERJAAN TANGGA 1 UNIT


1 Pek. Galian Pondasi 0.225 M3 26,560.00 5,976.00
2 Pek. Urugan Pasir Bawah Lantai 0.019 M3 150,240.00 2,817.00
3 Pek. Cor Lantai Kerja 1 : 3 : 5 0.019 M3 674,440.00 12,645.75
4 Pek. Cor Pondasi Tangga 0.100 M3 2,854,540.00 285,454.00
5 Pek. Urugan Tanah Kembali 0.075 M3 12,732.00 954.90
6 Pek. Cor Plat Tangga dan Bordes t = 12 cm 1.504 M3 4,187,860.00 6,297,871.38
7 Pek. Balok tangga 15/20 0.090 M3 3,128,470.00 281,562.30
8 Pek. Cor Beton Bertulang Anak Tangga 0.702 M3 4,187,860.00 2,939,877.72
9 Pek. Pas. Lantai Keramik Tangga 12.540 M2 189,170.00 2,372,191.80
10 Pek. Pas. Stop Noising anak tangga 24.000 M' 25,000.00 600,000.00
11 Pek. Pas. Dinding Railing Tangga camp. 1 : 4 7.931 M2 102,490.00 812,848.19
12 Pek. Pas. Plester Dinding Railing Tangga camp. 1 : 4 15.862 M2 46,740.00 741,389.88
13 Pek. Cat air dinding railing tangga 15.862 M2 16,080.00 255,060.96
14 Pek. Pas. Pipa Stainless diatas dinding tangga 9.834 M' 200,000.00 1,966,800.00
Sub Total 16,575,449.88

XIV. PEKERJAAN LUAR BANGUNAN


1 Pek. Parit Keliling Bangunan 49.200 M1 156,850.00 7,717,020.00
2 Pek. Urugan Tanah dibawah rabat Keliling Bangunan dipadatkan 19.720 M3 96,840.00 1,909,684.80
3 Pek. Urugan Pasir Bawah Rabat Sekeliling Bangunan 4.930 M3 150,240.00 740,683.20
4 Pek. Cor Rabat Sekeliling Bangunan 6.015 M3 674,440.00 4,056,486.82
5 Pek. Pas. Bangku Selasar 19.500 M' 500,000.00 9,750,000.00
Sub Total 24,173,874.82

B. LANTAI II

I. PEKERJAAN STRUKTUR
1 Pek. Cor Kolom( K' ) Beton Bertulang 5.587 M3 5,411,490.00 30,235,076.93
2 Pek. Cor Kolom ( K1' ) Beton Bertulang 1.455 M3 5,399,490.00 7,856,257.95
3 Pek. Cor Kolom ( K2 ) Beton Bertulang 0.330 M3 5,375,490.00 1,773,911.70
4 Pek. Cor Kolom ( K4 ) Beton Bertulang 0.176 M3 4,655,490.00 819,366.24
5 Pek. Cor Kolom Praktis 11/11 Beton Bertulang 0.864 M' 64,720.00 55,918.08
6 Pek. Cor Balok Praktis 11/11 Beton Bertulang 1.310 M' 64,720.00 84,750.84
7 Pek. Cor Kanopi Beton t = 8 cm 1.800 M3 3,827,860.00 6,890,148.00
8 Pek. Cor Ring Balok ( R ) Beton Bertulang 7.000 M3 4,705,730.00 32,940,110.00
9 Pek. Cor Ring Balok Janggutan ( R' ) Beton Bertulang 2.800 M3 4,429,730.00 12,403,244.00
Sub Total 93,058,783.74

II. PEKERJAAN DINDING & PLESTERAN


1 Pek. Pas. Dinding Bata 1 : 2 123.376 M2 111,700.00 13,781,099.20
2 Pek. Pas. Dinding Bata 1 : 4 358.642 M2 102,490.00 36,757,218.58
3 Pek. Plasteran Dinding Bata 1 : 2 246.752 M2 53,510.00 13,203,699.52
4 Pek. Plasteran Dinding Bata 1 : 4 688.834 M2 46,740.00 32,196,101.16
5 Pek. Pas. Relief dinding Selasar 25.000 M' 120,000.00 3,000,000.00
6 Pek. Pas. Plasteran Tali Air 1.000 Ls 3,500,000.00 3,500,000.00
7 Pek. Afwerking Beton 80.741 M2 32,470.00 2,621,653.78
8 Pek. Pas. Pagar Pipa Stainless diatas dinding selasar 7.000 M' 500,000.00 3,500,000.00
Sub Total 108,559,772.24
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
( Rp. ) ( Rp. )

III. PEKERJAAN PINTU DAN JENDELA


1 Pek. Pas. Kosen Pintu Dan Jendela 2.834 M3 10,013,450.00 28,374,862.93
2 Pek. Pas. Pintu Panel (Kayu Surian) 14.620 M2 407,450.00 5,956,919.00
3 Pek. Pasang Jendela Kaca Bingkai 5 mm (Bening) 33.750 M2 459,750.00 15,516,562.50
4 Pek. Pasang Kaca Mati 5 mm (Buram) 2.760 M2 150,337.00 414,930.12
5 Pek. Pasang Ventilasi papan jalusi 22.070 M2 416,250.00 9,186,637.50
Sub Total 59,449,912.05

IV. PEKERJAAN KUDA - KUDA & ATAP


1 Pek. Pas. Kuda-kuda Konstruksi Baja Ringan 375.000 M2 185,000.00 69,375,000.00
2 Pek. Pas. Atap Genteng Metal 375.000 M2 77,840.00 29,190,000.00
3 Pek. Pas. Perabung dan Jurai Atap 25.000 M' 59,050.00 1,476,250.00
4 Pek. Pas. Bola - Bola Atap 23.000 M' 38,620.00 888,260.00
5 Pek. Pas. Talang Air/jurai dalam 40.000 M' 46,490.00 1,859,600.00
6 Pek. Pas. Singap ukiran (GRC) + Cat 4.000 M2 781,410.00 3,125,640.00
7 Pek. Pas. Listplank Lebah Bergayut 76.000 M' 124,420.00 9,455,920.00
8 Pek. Pas. Listplank Papan 2 x 2/20 116.000 M' 51,360.00 5,957,760.00
9 Pek. Pas. Selembayung Ukir (GRC) + Cat 2.000 Ps 400,000.00 800,000.00
Sub Total 122,128,430.00

V. PEKERJAAN PLAFOND
1 Pek. Pas. Rangka Plafond Metal Furing 235.000 M2 70,200.00 16,497,000.00
2 Pek. Pas. Rangka Plafond Kayu 50.600 M2 80,900.00 4,093,540.00
3 Pek. Pas. Plafond Gypsum Board t = 9 mm 235.000 M2 37,850.00 8,894,750.00
4 Pek. Pas. Plafond Lambreziring 50.600 M2 102,420.00 5,182,452.00
5 Pek. Pas. List Gypsum 66.000 M' 11,310.00 746,460.00
6 Pek. Pas. List Profil Kayu 85.000 M' 9,530.00 810,050.00
Sub Total 36,224,252.00

VI. PEKERJAAN LANTAI


1 Pek. Pas. Lantai Keramik Ruangan 40 x 40 cm 235.000 M2 189,170.00 44,454,950.00
2 Pek. Pas. Lantai Keramik Selasar 40 x 40 cm 50.600 M2 189,170.00 9,572,002.00
3 Pek. Pas. Plint Keramik 10/40 cm 25.000 M' 24,940.00 623,500.00
Sub Total 54,650,452.00

VII. PEKERJAAN ALAT PENGGANTUNG


1 Pek. Pas. Kunci Tanam 2x slaag 6.000 Bh 138,320.00 829,920.00
2 Pek. Pas. Engsel Pintu 30.000 Bh 27,110.00 813,300.00
3 Pek. Pas. Grendel Pintu 12.000 Bh 28,110.00 337,320.00
4 Pek. Pas. Engsel Jendela 150.000 Bh 23,740.00 3,561,000.00
5 Pek. Pas. Grendel Jendela 150.000 Bh 23,110.00 3,466,500.00
6 Pek. Pas. Hak Angin Jendela 150.000 Bh 40,610.00 6,091,500.00
7 Pek. Pas. Tangan - tangan Jendela 75.000 Bh 40,610.00 3,045,750.00
Sub Total 18,145,290.00

VIII. PEKERJAAN INSTALASI LISTRIK


1 Pek. Pas. Titik Lampu & Stop Kontak 31.000 Ttk 175,000.00 5,425,000.00
2 Pek. Pas. Stop Kontak 5.000 Ttk 13,800.00 69,000.00
3 Pek. Pas. Saklar Tunggal 3.000 Bh 18,400.00 55,200.00
4 Pek. Pas. Saklar Ganda 5.000 Bh 20,000.00 100,000.00
5 Pek. Pas. Lampu TL ARM Reflexion Mirror 2 x 18 wat 12.000 Bh 325,000.00 3,900,000.00
6 Pek. Pas. Lampu Save Energy 18 Wat 14.000 Bh 45,000.00 630,000.00
7 Pek. Pas. Sub Panil Box (Standar PLN) 1.000 Unt 57,000.00 57,000.00
Sub Total 10,236,200.00
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
( Rp. ) ( Rp. )

IX PEKERJAAN PENGECATAN
1Pek. Cat Air Dinding dan Kolom 1,016.327 M2 16,080.00 16,342,534.94
2Pek. Cat Air Plafond 235.000 M2 16,080.00 3,778,800.00
3Pek. Cat Vernish Pintu Panil 29.240 M2 32,630.00 954,101.20
4Pek. Cat Minyak Jendela, papan jalusi, kusen pintu dan jendela, 156.258 M2 30,290.00 4,733,039.68
Listplank
5 Pek. Cat Minyak Lambrezering 50.600 M2 30,290.00 1,532,674.00
Sub Total 27,341,149.82

Pekanbaru, 2013

DIBUAT OLEH :
KEPALA BIDANG PENGEMBANGAN SM
DINAS PENDIDIKAN KOTA PEKANBARU
Selaku Kuasa Pengguna Anggaran/PPK

H. ADDAURI, M.Pd
Nip. 195703141978011002
CV.ASRI ENGINEERING CONSULTANT
PERENCANAAN SEKOLAH

CALCULATION SHEET SMUN DI KEC.TAMPAN

Panjang Lebar Tinggi


No Uraian Jumlah Sat Ket
(M1) (M1) (M1) Volume

I PEKERJAAN PONDASI
1 Pekerjaan Galian
a Galian Pondasi Tapak Setempat
Tipe P2 16.00 1.20 1.20 1.20 27.65 M3 29.76 0.05
Tipe P1 6.00 0.80 0.80 0.55 2.11 M3 0.05

b Galian Balok Sloof


Balok 20/30 (S) 0.05
Melintang 4.00 10.20 0.55 0.50 11.22 M3 32.95
1.00 2.50 0.55 0.50 0.69 M3
Memanjang 3.00 22.50 0.55 0.50 18.56 M3
2.00 4.50 0.55 0.50 2.48 M3

Balok Sloof 25/40 (S1) 0.05


Memanjang As A,C 2.00 22.50 0.60 0.70 18.90 M3
Memanjang As C 1.00 25.40 0.60 0.70 10.67 M3
Gudang, r. simpan 1.00 6.60 0.60 0.70 2.77 M3

Balok Sloof 15/20 (S2)


Memanjang 3.00 4.00 0.60 0.40 2.88 M3 0.05
Melintang 4.00 8.00 0.60 0.40 7.68 M3
Melintang S2' 2.00 2.20 0.60 0.40 1.06 M3
105.61 M3

2 Pekerjaan Urugan Pasir


a Pondasi Tapak Setempat
Tipe P1 16.00 1.20 1.20 0.05 1.15 M3
Tipe P 6.00 0.80 0.80 0.05 0.19 M3

b Balok Sloof
Balok 20/50 (S)
Melintang As 1, 3, 5, 6 4.00 6.87 0.55 0.05 0.76 M3
Melintang 6.00 2.10 0.60 0.05 0.38 M3

Balok Sloof 20/40 (S1)


Memanjang As A, B,C 3.00 33.00 0.60 0.05 2.97 M3
Gudang, r. simpan 1.00 6.60 0.60 0.05 0.20 M3

Balok Sloof 15/20 (S2)


Memanjang 3.00 4.00 0.60 0.05 0.36 M3
Melintang 4.00 8.00 0.60 0.05 0.96 M3
6.97 M3

3 Pekerjaan Cor Lantai Kerja


a Pondasi Tapak Setempat
Tipe P1 16.00 1.20 1.20 0.05 1.15 M3
Tipe P 6.00 0.80 0.80 0.05 0.19 M3

b Balok Sloof
Balok 20/50 (S)
Melintang As 1, 3, 5, 6 4.00 6.87 0.55 0.05 0.76 M3
Melintang 6.00 2.10 0.60 0.05 0.38 M3

Balok Sloof 20/40 (S1)


Memanjang As A, B, C 3.00 33.00 0.60 0.05 2.97 M3
Gudang, r. simpan 1.00 6.60 0.60 0.05 0.20 M3

Balok Sloof 15/20 (S2)


Memanjang 3.00 4.00 0.60 0.05 0.36 M3
Melintang 4.00 8.00 0.60 0.05 0.96 M3
6.97 M3

4 Pekerjaan Cor Pondasi Setempat


- Tipe P1 16.00 1.40 1.40 0.25 7.84 M3
- Tipe P 6.00 1.20 1.20 0.25 2.16 M3
10.00 M3

5 Pekerjaan Cor Kolom bawah lantai


- Tipe K (20/40) 16.00 1.15 0.20 0.40 1.47 M3
1.47 M3

6 Pekerjaan Cor Kolom bawah lantai


- Tipe K1 (25/25) 6.00 1.15 0.25 0.25 0.43 M3
0.43 M3

7 Pekerjaan Cor Balok Sloof 20/50 (S)


- Melintang As 1,3,5,6 4.00 6.87 0.20 0.50 2.75 M3
- Melintang 6.00 2.10 0.20 0.50 1.26 M3
4.01 M3

8 Pekerjaan Balok Sloof 20/40 (S1)


Memanjang As A, B, C 3.00 33.00 0.20 0.40 7.92 M3
Gudang, r. simpan 1.00 6.60 0.20 0.40 0.53 M3
8.45 M3

9 Pekerjaan Balok Sloof 15/20 (S2)


- Melintang - 1.62 0.15 0.20 - M3
- Memanjang - 3.87 0.15 0.20 - M3
- M3

10 Pekerjaan Pasang Pondasi Batu Bata


Balok 20/50 (S)
Melintang As 1, 3, 5, 6 4.00 6.87 1.00 0.40 10.99 M2
Melintang 6.00 2.10 1.00 0.40 5.04 M2

Balok Sloof 20/40 (S1)


Memanjang As A, B, C 3.00 33.00 1.00 0.50 49.50 M2
Gudang, r. simpan 1.00 6.60 1.00 0.50 3.30 M2

Balok Sloof 15/20 (S2)


Melintang 1.00 1.62 1.00 0.15 0.24 M2
Memanjang 1.00 3.87 1.00 0.15 0.58 M2
69.66 M2

II PEKERJAAN STRUKTUR
1 Pek. Cor Kolom 30/40
Tipe K 2 (30/40) 12.00 3.88 0.30 0.40 5.59 M3
5.59 M3

2 Pek. Cor Kolom 25/25


Tipe K1 (25/25) 6.00 3.88 0.25 0.25 1.46 M3
1.46 M3

3 Pek. Cor Kolom 11/20


Tipe K2 (11/20) 3.00 3.40 0.11 0.20 0.22 M3
Tipe K2 (11/20) 2.00 2.40 0.11 0.20 0.11 M3
0.33 M3

4 Pek. Cor Kolom K3 (20/20)


Tipe K3 (20/20) 2.00 2.20 0.20 0.20 0.18 M3
0.18 M3

5 Pek. Cor Kolom K4 (10/30)


Tipe K4 (10/30) 8.00 3.60 0.10 0.30 0.86 M3
0.86 M3

5 Pek. Cor Kolom Praktis


Kolom Praktis 15.00 0.15 0.15 3.88 1.31 M'
1.31 M'
6 Pek. Cor Balok Lantai 25/60 (B)
Melintang As1,3,5,6 6.00 10.22 0.25 0.60 9.20 M3
Melintang 2.00 4.00 0.25 0.48 0.96 M3
10.16 M3

7 Pek. Cor Balok Lantai 20/40 (B1)


Memanjang As A 1.00 22.48 0.20 0.40 1.80 M3
Memanjang As B 1.00 22.48 0.20 0.40 1.80 M3
Memanjang As C 1.00 22.48 0.20 0.40 1.80 M3
5.40 M3

8 Pek. Cor Balok Lantai (B2) Janggutan


Memanjang As C 1.00 22.48 0.15 0.48 1.62 M3
Memanjang Janggutan As C 1.00 22.48 0.06 0.60 0.81 M3
Melintang As. 1, 6 2.00 2.10 0.15 0.48 0.30 M3
Melintang Janggutan As. 1, 6 2.00 2.10 0.06 0.60 0.15 M3
2.88 M3

9 Pek. Cor Balok Lantai (B3)


Memanjang As B 2.00 0.81 0.15 0.38 0.09 M3
0.09 M3

10 Pek. Cor Balok Lantai (B4) Janggutan


Memanjang 1.00 2.95 0.15 0.38 0.17 M3
Memanjang Janggutan 1.00 2.95 0.06 0.20 0.04 M3
Melintang 1.00 3.45 0.15 0.38 0.20 M3
Melintang Janggutan 1.00 3.45 0.06 0.20 0.04 M3
0.44 M3

11 Pek. Cor Balok Lantai (BA)


Memanjang 1.00 33.00 0.20 0.23 1.52 M3
Melintang - 1.35 0.20 0.23 - M3
1.52 M3

12 Pek. Cor Balok Gantung Pada Folding Gate


Melintang 6.87 0.20 0.40 - M3
- M3

13 Pek. Cor Plat Lantai


Luasan Plat Lantai 1.00 22.48 10.20 1.00 229.30 M2
Luasan Void 1.00 10.00 3.45 1.00 34.50 M2
Volume plat lantai 1.00 194.80 1.00 0.12 23.38 M3
23.38 M3

14 Pek. Cor Kanopi Beton


Memanjang 1 6.00 4.25 0.60 0.08 1.22 M3
Memanjang 2 2.00 3.75 0.60 0.08 0.36 M3
Memanjang 3 4.00 1.05 0.70 0.08 0.24 M3
1.82 M3

15 Pek. Cor Balok Latai


Memanjang As. A 6.00 4.25 1.00 1.00 25.50 M'
Memanjang As. A 2.00 3.75 1.00 1.00 7.50 M'
Memanjang As. C 4.00 1.05 1.00 1.00 4.20 M'
37.20 M'

III PEKERJAAN DINDING DAN PLESTERAN


1 Pek. Pas. Dinding 1 : 2
Memanjang 1.00 360.00 1.00 0.20 72.00 M2
Melintang 1.00 256.00 1.00 0.20 51.20 M2
Melintang As. 3 1.00 0.88 1.00 0.20 0.18 M2
123.38 M2

2 Pek. Pas. Dinding 1 : 4


Memanjang 1.00 67.68 1.00 4.00 270.72 M2
Melintang 1.00 40.00 1.00 4.00 160.00 M2
Melintang 1.00 4.20 1.00 3.40 14.28 M2
Melintang As. 3 1.00 0.88 1.00 4.00 3.52 M2
Melintang As. 3 1.00 6.87 1.00 0.60 4.12 M2
Luasan kosen 94.00 M2
358.64 M2
3 Pek. Pas. Dinding Keramik km/wc 20/25
Km/wc 1 1.00 6.18 1.00 1.50 9.27 M2
Bak 1.00 1.20 1.00 0.60 0.72 M2
Wastafel 1.00 5.37 1.00 1.50 8.06 M2
16.61 M2

4 Pek. Pas. Border/list dinding keramik


1.00 6.18 1.00 1.00 6.18 M'
1.00 5.37 1.00 1.00 5.37 M'
11.55 M'

5 Pek. Relief dinding dibawah kosen


3.00 8.70 1.00 1.00 26.10 M'
26.10 M'

6 Pek. Pas. Batu andesit pada dinding luar


1.00 18.00 1.00 1.10 19.80 M2
19.80 M2

7 Pek. Plesteran tali air


1.00 1.00 1.00 1.00 1.00 Ls
1.00 LS

8 Pek. Pas. Ornamen Kaki Teras


6.00 1.00 1.00 1.00 6.00 Unit
6.00 Unit

9 Pek. Afwerking tiang kolom


Tipe K (25/40) 4.00 1.04 1.00 3.40 14.12 M2
Tipe K (25/40) 14.00 0.92 1.00 3.40 43.79 M2

Tipe K1 (25/25) 4.00 0.87 1.00 3.40 11.83 M2


Tipe K1' (25/25) 5.00 1.00 1.00 2.20 11.00 M2
80.74 M2

IV PEKERJAAN PLAFOND
1 Pek. Pas. Rangka Plafond
R. Kelas 2.00 8.00 18.00 1.00 288.00 M2
Gudang 2.00 4.50 2.00 1.00 18.00 M2
Teras 1 2.00 22.48 2.20 1.00 98.91 M2
404.91 M2

3 Pek. Pas. List Gypsum


R. Kelas 2.00 1.00 1.00 31.72 63.44 M'
Gudang 2.00 1.00 1.00 13.48 26.96 M'
Teras 2.00 1.00 1.00 86.50 173.00 M'
263.41 M'

V PEKERJAAN LANTAI
1 Pek. Urugan Tanah dibawah lantai dipadatkan
Bangunan utama 1.00 22.50 10.20 0.20 45.90 M3
45.90 M3

2 Pek. Urugan Pasir dibawah lantai


R. Kelas 1.00 22.50 10.20 0.05 11.48 M3
11.48 M3

3 Pek. Cor Lantai 1 : 3 : 5


R. Kelas 1.00 22.50 10.50 0.07 16.54 M3
16.54 M3

4 Pek. Pas. Lantai Keramik 20/20


Km1 1.00 2.00 1.75 1.00 3.50 M2
Km2 1.00 2.00 1.75 1.00 3.50 M2
Bak Mandi dan kloset 1.00 0.60 0.60 1.00 0.36 M2
6.64 M2

5 Pek. Pas. Lantai Keramik 40/40


R. Kelas 2.00 8.00 18.00 1.00 288.00 M2
Gudang 2.00 4.50 2.00 11.70 210.60 M2
498.60 M2
6 Pek. Pas. Lantai Keramik 40/40 selasar
Type 1 1.00 22.50 2.20 1.00 49.50 M2
Type 2 1.00 4.00 4.00 1.00 16.00 M2
65.50 M2

7 Pek. Pas. Plint Keramik


R. Kelas 2.00 18.49 1.00 1.00 36.98 M'
Gudang 1.00 13.57 3.50 1.00 47.50 M'
dibawah tangga 1.00 19.82 1.00 1.00 19.82 M'
104.29 M'

VI PEKERJAAN TANGGA
1 Pek. Galian Pondasi
1.00 1.25 0.30 0.60 0.23 M3
0.23 M3

2 Pek. Urugan Pasir bawah tangga


1.00 1.25 0.30 0.05 0.02 M3
0.02 M3

3 Pek. Cor Lantai kerja


1.00 1.25 0.30 0.05 0.02 M3
0.02 M3
4 Pek. Cor Pondasi Tangga
1.00 1.25 0.20 0.40 0.10 M3
0.10 M3

5 Pek. Cor Plat Tangga dan Bordes


Plat Tangga 1.00 6.64 1.30 0.12 1.04 M3
Bordes 1.00 3.00 1.30 0.12 0.47 M3
1.50 M3

6 Pek. Cor Balok Tangga


1.00 3.00 0.15 0.20 0.09 M3
0.09 M3

7 Pek. Cor Anak Tangga


18.00 1.00 1.30 0.03 0.70 M3
0.70 M3

8 Pek. Keramik Tangga


Bordes 1.00 3.00 1.30 1.00 3.90 M2
Anak Tangga 18.00 0.40 1.20 1.00 8.64 M2
12.54 M2

9 Pek. Pas. Stop noising tangga


Anak Tangga 20.00 1.00 1.20 1.00 24.00 M'
24.00 M'

10 Pek. Pas. Dinding Railing Tangga


1.00 7.21 1.10 1.00 7.93 M2
7.93 M2

11 Pek. Plesteran dinding


2.00 7.21 1.10 1.00 15.86 M2
15.86 M2

12 Pek. Pipa Stainless


1.00 8.94 1.10 1.00 9.83 M'
9.83 M'

VII PEKERJAAN LUAR BANGUNAN


1 Pek. Parit Keliling Bangunan
Memanjang 1.00 25.40 1.00 1.00 25.40 M'
Melintang 2.00 11.90 1.00 1.00 23.80 M'
49.20 M'

2 Pek. Urugan Tanah dibawah rabat keliling bangunan


Memanjang 2.00 37.40 1.00 0.20 14.96 M3
Melintang 2.00 11.90 1.00 0.20 4.76 M3
19.72 M3

3 Pek. Urugan Pasir dibawah rabat keliling bangunan


Memanjang 2.00 37.40 1.00 0.05 3.74 M3
Melintang 2.00 11.90 1.00 0.05 1.19 M3
4.93 M3

4 Pek. Cor rabat keliling bangunan


Memanjang 2.00 37.40 1.00 0.06 4.56 M3
Melintang 2.00 11.90 1.00 0.06 1.45 M3
6.01 M3

5 Pek. Pas. Bangku Selasar


Tipe 1 3.00 2.50 1.00 1.00 7.50 M'
Tipre 2 3.00 4.00 1.00 1.00 12.00 M'
19.50 M'
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KEGIATAN : PEMBANGUNAN SMAN BARU
PEKERJAAN : PEMBANGUNAN SMAN BARU , 4 RKB BERTINGKAT
LOKASI : TAMPAN

NO. JENIS BAHAN SATUAN HARGA SATUAN KETERANGAN

1 2 3 4 5

I TENAGA KERJA
1 MANDOR ORANG / HARI 84,000.00
2 KEPALA TUKANG ORANG / HARI 82,000.00
3 TUKANG ORANG / HARI 73,000.00
4 PEKERJA ORANG / HARI 58,000.00

II BAHAN
A BAHAN PASANGAN
1 PASIR URUG M3. 110,000.00
2 PASIR PASANG M3. 125,000.00
3 PASIR BETON / COR M3. 173,000.00
4 TANAH URUG / TIMBUN M3. 65,500.00
5 KERIKIL / KORAL BETON M3. 200,000.00
6 BATU BATA Uk 5 x 10 x 20 BH. 675.00
7 PORTLAND CEMENT / SEMEN PADANG TYPE I KG. 1,320.00
8 PORTLAND CEMENT WARNA KG. 2,500.00
9 PAVING BLOK TEBAL 6 CM BH. 1,800.00

B BAHAN KAYU
1 KAYU KELAS I ( KULIM ) M3. 6,800,000.00
2 KAYU KELAS II M3. 3,675,000.00
3 KAYU LAMBERZIRING (JELUTUNG) M3. 5,100,000.00
4 PAPAN/KAYU SURIAN M3. 3,500,000.00
5 KAYU KELAS III M3. 2,100,000.00
6 KAYU CEROCOK / KAYU UBAR BTG. 26,000.00
7 KAYU DOLKEN DIA. 5 - 10 CM PANJANG 400 CM BTG. 15,000.00
8 KAYU PROFIL M' 3,700.00
9 PAPAN LISPLANK UKIR M' 84,000.00
10 PAPAN SINGAP UKIR (GRC) M2. 630,000.00
11 SELEMBAYUNG UKIR PASANG 400,000.00

C BAHAN BESI
1 BESI BETON KG. 12,000.00
2 KAWAT IKAT BETON (BANDRAT) KG. 17,000.00
3 RANGKA PLAFOND METAL FURING M' 9,000.00
4 RANGKA KUDA-KUDA BAJA RINGAN M2 185,000.00

D BAHAN PENUTUP LANTAI DAN DINDING


1 KERAMIK UKURAN 40X40 CM BH. 15,000.00
2 KERAMIK UKURAN 30X30 CM BH. 7,200.00
3 KERAMIK UKURAN 20X25 CM BH. 3,300.00
4 KERAMIK UKURAN 20X20 CM BH. 2,600.00
5 PLIN KERAMIK 10X30 CM BH. 2,400.00
6 PLIN KERAMIK 10X40 CM BH. 3,750.00
7 BATU ANDESIT M2. 230,000.00
8 LIST DINDING KERAMIK 5/20 ( BORDER ) M'. 12,000.00
9 STOP NOSING M'. 25,000.00

Page 15
NO. JENIS BAHAN SATUAN HARGA SATUAN KETERANGAN

1 2 3 4 5

E BAHAN ATAP
1 SENG PLAT LBR. 47,000.00
2 SENG GELOMBANG M2. 80,500.00
3 ATAP GENTENG METAL 0,25 MM M2. 52,000.00
4 PERABUNG GENTENG METAL BULAT LBR. 27,300.00
5 BOLA - BOLA ATAP GENTENG LBR. 25,000.00
6 PLASTIK GOT M' 28,750.00

F BAHAN LANGIT - LANGIT DAN LAP. DINDING


1 PLYWOOD 4 MM LBR. 56,700.00
PLYWOOD 6 MM LBR. 69,000.00
2 PLYWOOD 9 MM LBR. 115,000.00
3 GYPSUM 6 MM LBR. 68,200.00
4 GYPSUM 9 MM LBR. 100,800.00
4 LIST PROFIL KAYU K1 M' 4,350.00
5 LIST PROFIL GYPSUM M' 3,500.00

G BAHAN PIPA
1 PIPA PVC AW 1/2 " M' 5,250.00
2 PIPA PVC AW 3/4 " M' 6,750.00
3 PIPA PVC AW 3 " M' 55,000.00
4 PIPA PVC AW 4 " M' 61,000.00

H BAHAN SANITAIR
1 KLOSET JONGKOK PORSELIN BH. 325,000.00
2 KLOSET DUDUK BH. 1,450,000.00
3 WASTAFEL BH. 700,000.00
4 BAK CUCI STANLEES STEEL/ KITCHEN SINK BH. 400,000.00
5 FLOOR DRAIN SETARA BH. 15,000.00
6 BAK FIBERGLASS BH. 250,000.00
7 KRAN AIR DIA. 3/4" , 1/2" BH. 28,000.00
8 SEAL TAPE BH. 4,500.00
9 PINTU FIBER KOMPLIT BH. 290,000.00
10 STOP KRAN DIA. 3/4" UNIT 28,000.00

I BAHAN PAKU
1 PAKU ATAP GENTENG METAL KG. 25,000.00
2 PAKU KAYU KG. 15,000.00
3 PAKU SERI KG. 18,000.00
4 PAKU 2" - 5" KG. 15,000.00
5 PAKU GYPSUM KG. 25,000.00
6 PAKU SKRUP KG. 21,000.00

J BAHAN PINTU DAN PENGGANTUNG / KUNCI


1 PINTU BESI POLDING GATE + PEMASANGAN M2. 850,000.00
2 KUNCI TANAM BIASA 2 X SLAAG BH. 100,000.00
3 KUNCI MEJA LABOR BH. 40,000.00
4 GRENDEL PINTU 4" BH. 15,000.00
5 ENGSEL PINTU 4" BH. 14,000.00
6 ENGSEL JENDELA 3" BH. 15,000.00
7 ENGSEL MEJA LABOR M' 20,000.00
8 GRENDEL JENDELA 2" BH. 10,000.00
9 HAK ANGIN JENDELA BH. 16,500.00
10 HANDLE JENDELA BH. 27,500.00

K BAHAN KACA
1 KACA BENING 3 MM M2. 68,250.00
2 KACA BENING 5 MM M2. 99,000.00
3 KACA BURAM 5 MM M2. 120,000.00

Page 16
NO. JENIS BAHAN SATUAN HARGA SATUAN KETERANGAN

1 2 3 4 5

L BAHAN LISTRIK
1 INSTALASI TITIK LAMPU (KABEL INSTALASI STANDAR PLN) TTK. 175,000.00
2 LAMPU SAVE ENERGY 18 WATT BH. 45,000.00
3 LAMPU ARMATURE DOWN LIGHT 10" (24 WATT PHILIPS) BH. 100,000.00
4 LAMPU TL ARM REFLEXION MIRROR 2 X 18 WATT BH. 325,000.00
5 STOP KONTAK BH. 13,800.00
6 SAKLAR GANDA BH. 20,000.00
7 SAKLAR TUNGGAL BH. 18,400.00
8 SAKLAR TRIPLE BH. 25,000.00
9 PANEL DISTRIBUSI (STANDAR PLN) UNIT 1,500,000.00
10 MAIN PANEL BOX ( STANDAR PLN ) UNIT 500,000.00
11 SUB PANEL BOX ( STANDAR PLN ) UNIT 57,000.00

M BAHAN FINISHING
1 CAT MINYAK SETARA PLATON KG. 50,000.00
2 CAT TEMBOK SETARA PLATON KG. 20,000.00
3 CAT VERNISH KG. 55,000.00
4 CAT KAYU DASAR / MENI KG. 24,000.00
5 MINYAK CAT LTR. 27,600.00
6 THINEER LTR. 27,600.00
7 RESIDU KG. 10,000.00
8 DEMPUL KG. 26,000.00
9 PLAMIR RJ KG. 20,000.00
10 KERTAS PASIR / AMPLAS LBR. 5,000.00
11 TEPUNG PENGISI NAT KERAMIK KG. 12,000.00
12 KUAS 3" BH. 10,000.00
13 MINYAK BEKISTING LTR. 8,000.00

N PEKERJAAN LAIN - LAIN


1 ORNAMEN KAKI TIANG TERAS (Relief + batu andesit) UNIT 1,500,000.00
2 RELIEF DINDING M' 120,000.00
3 PIPA STAINLES DIATAS DINDING SELASAR M' 500,000.00
4 PIPA STAINLES DIATAS DINDING TANGGA M' 200,000.00
5 PASANG BANGKU SELASAR M' 500,000.00
6 SUMUR BOR (sampai dapat air bersih) UNIT 4,000,000.00
7 SEPTICTANK + RESAPAN UNIT 4,000,000.00
8 WATER TANK KAP 1 M 3 + INSTALASI AIR BERSIH BH 1,500,000.00
9 MESIN AIR BH 750,000.00
10 PASANG WATER TOWER KONSTRUKSI BAJA UNIT 5,000,000.00
11 PLESTER TALI AIR LS 3,500,000.00
12 PEK. PAS. SUMUR RESAPAN UNIT 1,500,000.00
13 PEK. PAS. TIANG BENDERA UNIT 3,500,000.00

Pekanbaru, 2013

DIBUAT OLEH :
KEPALA BIDANG PENGEMBANGAN SM
DINAS PENDIDIKAN KOTA PEKANBARU
Selaku Kuasa Pengguna Anggaran/PPK

H. ADDAURI, M.Pd
Nip. 195703141978011002

Page 17
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : PEMBANGUNAN SMAN BARU
PEKERJAAN : PEMBANGUNAN SMAN BARU , 4 RKB BERTINGKAT
LOKASI : TAMPAN

JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH

1 M3 GALIAN TANAH BIASA SEDALAM 1 M


TENAGA
Pekerja 0.4000 OH 58,000.00 23,200.00
Tukang - OH - -
Kepala Tukang - OH - -
Mandor 0.0400 OH 84,000.00 3,360.00
SUB TOTAL 26,560.00 -
JUMLAH 26,560.00
DIBULATKAN 26,560.00

1 M3 URUGAN KEMBALI
TENAGA
Pekerja 0.1920 OH 58,000.00 11,136.00
Mandor 0.0190 OH 84,000.00 1,596.00
SUB TOTAL 12,732.00 -
JUMLAH 12,732.00
DIBULATKAN 12,732.00

1 M3 URUGAN PASIR
TENAGA
Pekerja 0.3000 OH 58,000.00 17,400.00
Tukang - OH - -
Kepala Tukang - OH - -
Mandor 0.0100 OH 84,000.00 840.00
BAHAN
Pasir urug 1.2000 M3 110,000.00 132,000.00
SUB TOTAL 18,240.00 132,000.00
JUMLAH 150,240.00
DIBULATKAN 150,240.00

1 M3 URUGAN TANAH
TENAGA
Pekerja 0.3000 OH 58,000.00 17,400.00
Tukang - OH - -
Kepala Tukang - OH - -
Mandor 0.0100 OH 84,000.00 840.00
BAHAN
Tanah 1.2000 M3 65,500.00 78,600.00
SUB TOTAL 18,240.00 78,600.00
JUMLAH 96,840.00
DIBULATKAN 96,840.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA (1:3)
TENAGA
Pekerja 0.6500 OH 58,000.00 37,700.00
Tukang 0.2000 OH 73,000.00 14,600.00
Kepala Tukang 0.0200 OH 82,000.00 1,640.00
Mandor 0.0300 OH 84,000.00 2,520.00
BAHAN
Batu Bata 160.0000 Bh 675.00 108,000.00
Semen Portland 32.9500 Kg 1,320.00 43,494.00
Pasir Pasang 0.0910 M3 125,000.00 11,375.00
SUB TOTAL 56,460.00 162,869.00
JUMLAH 219,329.00
DIBULATKAN 219,320.00

Page 18 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA (1:2)


TENAGA
Pekerja 0.3200 OH 58,000.00 18,560.00
Tukang 0.1000 OH 73,000.00 7,300.00
Kepala Tukang 0.0100 OH 82,000.00 820.00
Mandor 0.0150 OH 84,000.00 1,260.00
BAHAN
Batu Bata 80.0000 Bh 675.00 54,000.00
Semen Portland 18.9500 Kg 1,320.00 25,014.00
Pasir Pasang 0.0380 M3 125,000.00 4,750.00
SUB TOTAL 27,940.00 83,764.00
JUMLAH 111,704.00
DIBULATKAN 111,700.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA (1:4)


TENAGA
Pekerja 0.3200 OH 58,000.00 18,560.00
Tukang 0.1000 OH 73,000.00 7,300.00
Kepala Tukang 0.0100 OH 82,000.00 820.00
Mandor 0.0150 OH 84,000.00 1,260.00
BAHAN
Batu Bata 80.0000 Bh 675.00 54,000.00
Semen Portland 11.5000 Kg 1,320.00 15,180.00
Pasir Pasang 0.0430 M3 125,000.00 5,375.00
SUB TOTAL 27,940.00 74,555.00
JUMLAH 102,495.00
DIBULATKAN 102,490.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

1 M2 PLESTERAN 1:2, TEBAL 20 MM


TENAGA
Pekerja 0.2500 OH 58,000.00 14,500.00
Tukang batu 0.2000 OH 73,000.00 14,600.00
Kepala Tukang 0.0200 OH 82,000.00 1,640.00
Mandor 0.0125 OH 84,000.00 1,050.00
BAHAN
Semen Portland 14.2800 Kg 1,320.00 18,849.60
Pasir Pasang 0.0230 M3 125,000.00 2,875.00
SUB TOTAL 31,790.00 21,724.60
JUMLAH 53,514.60
DIBULATKAN 53,510.00

1 M2 PLESTERAN 1:4, TEBAL 20 MM


TENAGA
Pekerja 0.2500 OH 58,000.00 14,500.00
Tukang batu 0.2000 OH 73,000.00 14,600.00
Kepala Tukang 0.0200 OH 82,000.00 1,640.00
Mandor 0.0125 OH 84,000.00 1,050.00
BAHAN
Semen Portland 8.6800 Kg 1,320.00 11,457.60
Pasir Pasang 0.0280 M3 125,000.00 3,500.00
SUB TOTAL 31,790.00 14,957.60
JUMLAH 46,747.60
DIBULATKAN 46,740.00

1 M2 PLESTERAN BERAPEN 1:3, TEBAL 30 MM


TENAGA
Pekerja 0.1500 OH 58,000.00 8,700.00
Tukang batu 0.0700 OH 73,000.00 5,110.00
Kepala Tukang 0.0070 OH 82,000.00 574.00
Mandor 0.0080 OH 84,000.00 672.00
BAHAN
Semen Portland 7.0700 Kg 1,320.00 9,332.40
Pasir Pasang 0.0210 M3 125,000.00 2,625.00
SUB TOTAL 15,056.00 11,957.40
JUMLAH 27,013.40
DIBULATKAN 27,010.00

Page 19 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M2 PLESTERAN CIPRAT
TENAGA
Pekerja 0.3000 OH 58,000.00 17,400.00
Tukang batu 0.1000 OH 73,000.00 7,300.00
Kepala Tukang 0.0100 OH 82,000.00 820.00
Mandor 0.0150 OH 84,000.00 1,260.00
BAHAN
Semen Portland 4.3200 Kg 1,320.00 5,702.40
Pasir Pasang 0.0060 M3 125,000.00 750.00
SUB TOTAL 26,780.00 6,452.40
JUMLAH 33,232.40
DIBULATKAN 33,230.00

1 M2 PLESTERAN BETON 1:3, TEBAL 10 MM ( AFWERKING )


TENAGA
Pekerja 0.2000 OH 58,000.00 11,600.00
Tukang batu 0.2000 OH 73,000.00 14,600.00
Kepala Tukang 0.0180 OH 82,000.00 1,476.00
Mandor 0.0100 OH 84,000.00 840.00
BAHAN
Semen Portland 2.3400 Kg 1,320.00 3,088.80
Pasir Pasang 0.0070 M3 125,000.00 875.00
SUB TOTAL 28,516.00 3,963.80
JUMLAH 32,479.80
DIBULATKAN 32,470.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KULIM


TENAGA
Pekerja 6.0000 OH 58,000.00 348,000.00
Tukang kayu 18.0000 OH 73,000.00 1,314,000.00
Kepala Tukang 2.0000 OH 82,000.00 164,000.00
Mandor 0.3000 OH 84,000.00 25,200.00
BAHAN
Kayu Kulim 1.2000 M3 6,800,000.00 8,160,000.00
Paku biasa 0.1500 Kg 15,000.00 2,250.00
SUB TOTAL 1,851,200.00 8,162,250.00
JUMLAH 10,013,450.00
DIBULATKAN 10,013,450.00

1 M3 PASANG KUSEN PINTU KLAS II


TENAGA
Pekerja 6.0000 OH 58,000.00 348,000.00
Tukang kayu 18.0000 OH 73,000.00 1,314,000.00
Kepala Tukang 2.0000 OH 82,000.00 164,000.00
Mandor 0.3000 OH 84,000.00 25,200.00
BAHAN
Kayu Klas II 1.2000 M3 3,675,000.00 4,410,000.00
Paku biasa 0.1500 Kg 15,000.00 2,250.00
SUB TOTAL 1,851,200.00 4,412,250.00
JUMLAH 6,263,450.00
DIBULATKAN 6,263,450.00

1 M2 PASANG JENDELA KACA BINGKAI (KACA 5 MM)


TENAGA
Pekerja 1.0000 OH 58,000.00 58,000.00
Tukang kayu 2.5000 OH 73,000.00 182,500.00
Kepala Tukang 0.2500 OH 82,000.00 20,500.00
Mandor 0.0500 OH 84,000.00 4,200.00
BAHAN
Kayu Meranti 0.0200 M3 3,675,000.00 73,500.00
Kaca Bening 5 mm 1.2000 M2 99,000.00 118,800.00
Paku biasa 0.1500 Kg 15,000.00 2,250.00
SUB TOTAL 265,200.00 194,550.00
JUMLAH 459,750.00
DIBULATKAN 459,750.00

Page 20 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M2 PASANG KACA MATI TEBAL 5 M


TENAGA
Pekerja 0.0150 OH 58,000.00 870.00
Tukang kayu 0.1500 OH 73,000.00 10,950.00
Kepala Tukang 0.0150 OH 82,000.00 1,230.00
Mandor 0.0008 OH 84,000.00 67.20
BAHAN
Kaca mati 5 mm 1.1000 M2 99,000.00 108,900.00
kayu list profil 1.2000 M' 4,350.00 5,220.00
SUB TOTAL 13,117.20 114,120.00
JUMLAH 127,237.20
DIBULATKAN 127,237.00

1 M2 PASANG KACA MATI BURAM TEBAL 5 M


TENAGA
Pekerja 0.0150 OH 58,000.00 870.00
Tukang kayu 0.1500 OH 73,000.00 10,950.00
Kepala Tukang 0.0150 OH 82,000.00 1,230.00
Mandor 0.0008 OH 84,000.00 67.20
BAHAN
Kaca mati Buram 5 mm 1.1000 M2 120,000.00 132,000.00
kayu list profil 1.2000 M' 4,350.00 5,220.00
SUB TOTAL 13,117.20 137,220.00
JUMLAH 150,337.20
DIBULATKAN 150,337.00

1 M2 PASANG PINTU PANEL KAYU SURIAN


TENAGA
Pekerja 1.0000 OH 58,000.00 58,000.00
Tukang kayu 2.5000 OH 73,000.00 182,500.00
Kepala Tukang 0.2500 OH 82,000.00 20,500.00
Mandor 0.0500 OH 84,000.00 4,200.00
BAHAN
Kayu Surian 0.0400 M3 3,500,000.00 140,000.00
Paku biasa 0.1500 Kg 15,000.00 2,250.00
SUB TOTAL 265,200.00 142,250.00
JUMLAH 407,450.00
DIBULATKAN 407,450.00

1 M2 PASANG PINTU PANEL KAYU SURIAN LAPIS SENG PLAT


TENAGA
Pekerja 1.0000 OH 58,000.00 58,000.00
Tukang kayu 2.5000 OH 73,000.00 182,500.00
Kepala Tukang 0.2500 OH 82,000.00 20,500.00
Mandor 0.0500 OH 84,000.00 4,200.00
BAHAN
Kayu Surian 0.0400 M3 3,500,000.00 140,000.00
Seng Plat 1.2000 M2 47,000.00 56,400.00
Paku biasa 0.1700 Kg 15,000.00 2,550.00
SUB TOTAL 265,200.00 198,950.00
JUMLAH 464,150.00
DIBULATKAN 464,150.00

1 M2 PASANG PINTU PANEL KLAS II


TENAGA
Pekerja 1.0000 OH 58,000.00 58,000.00
Tukang kayu 2.5000 OH 73,000.00 182,500.00
Kepala Tukang 0.2500 OH 82,000.00 20,500.00
Mandor 0.0500 OH 84,000.00 4,200.00
BAHAN
Kayu Klas II 0.0400 M3 3,675,000.00 147,000.00
Paku biasa 0.1700 Kg 15,000.00 2,550.00
SUB TOTAL 265,200.00 149,550.00
JUMLAH 414,750.00
DIBULATKAN 414,750.00

Page 21 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M2 PASANG JALUSI MATI KAYU MERANTI


TENAGA
Pekerja 0.5000 OH 58,000.00 29,000.00
Tukang kayu 2.0000 OH 73,000.00 146,000.00
Kepala Tukang 0.2000 OH 82,000.00 16,400.00
Mandor 0.0250 OH 84,000.00 2,100.00
BAHAN
Kayu Meranti, papan 0.0600 M3 3,675,000.00 220,500.00
Paku Biasa 0.1500 Kg 15,000.00 2,250.00
SUB TOTAL 193,500.00 222,750.00
JUMLAH 416,250.00
DIBULATKAN 416,250.00

1 M3 PASANG KUDA - KUDA KAYU KELAS II


TENAGA
Pekerja 4.0000 OH 58,000.00 232,000.00
Tukang kayu 12.0000 OH 73,000.00 876,000.00
Kepala Tukang 1.2000 OH 82,000.00 98,400.00
Mandor 0.2000 OH 84,000.00 16,800.00
BAHAN
Kayu Kelas II Balok 1.1000 M3 3,675,000.00 4,042,500.00
Paku Biasa 2" - 5" 7.0000 Kg 15,000.00 105,000.00
SUB TOTAL 1,223,200.00 4,147,500.00
JUMLAH 5,370,700.00
DIBULATKAN 5,370,700.00

1 M3 PASANG GORDING KAYU KELAS II


TENAGA
Pekerja 2.0000 OH 58,000.00 116,000.00
Tukang kayu 6.0000 OH 73,000.00 438,000.00
Kepala Tukang 0.6000 OH 82,000.00 49,200.00
Mandor 0.1000 OH 84,000.00 8,400.00
BAHAN
Kayu Kelas II Balok 1.1000 M3 3,675,000.00 4,042,500.00
Paku Biasa 2" - 5" 6.0000 Kg 15,000.00 90,000.00
SUB TOTAL 611,600.00 4,132,500.00
JUMLAH 4,744,100.00
DIBULATKAN 4,744,100.00

1 M2 PASANG RANGKA ATAP (KASAU+RENG) KAYU KELAS II


TENAGA
Pekerja 0.1000 OH 58,000.00 5,800.00
Tukang kayu 0.1000 OH 73,000.00 7,300.00
Kepala Tukang 0.0100 OH 82,000.00 820.00
Mandor 0.0050 OH 84,000.00 420.00
BAHAN
Kayu Kelas II Balok 0.0106 M3 3,675,000.00 38,955.00
Paku Biasa 2" - 5" 0.1500 Kg 15,000.00 2,250.00
SUB TOTAL 14,340.00 41,205.00
JUMLAH 55,545.00
DIBULATKAN 55,545.00

1 M2 PASANG RANGKA LANGIT-LANGIT METAL FURING


TENAGA
Pekerja 0.1500 OH 58,000.00 8,700.00
Tukang kayu 0.2500 OH 73,000.00 18,250.00
Kepala Tukang 0.0250 OH 82,000.00 2,050.00
Mandor 0.0750 OH 84,000.00 6,300.00
BAHAN
Metal Puring 3.6000 M' 9,000.00 32,400.00
Skrup Gybsum 0.1000 Kg 25,000.00 2,500.00
SUB TOTAL 35,300.00 34,900.00
JUMLAH 70,200.00
DIBULATKAN 70,200.00

Page 22 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M2 PASANG RANGKA LANGIT-LANGIT (RANGKA KAYU)


TENAGA
Pekerja 0.1500 OH 58,000.00 8,700.00
Tukang kayu 0.2500 OH 73,000.00 18,250.00
Kepala Tukang 0.0250 OH 82,000.00 2,050.00
Mandor 0.0750 OH 84,000.00 6,300.00
BAHAN
Kayu Meranti 0.0120 M3 3,675,000.00 44,100.00
Paku biasa 0.1000 Kg 15,000.00 1,500.00
SUB TOTAL 35,300.00 45,600.00
JUMLAH 80,900.00
DIBULATKAN 80,900.00

1 M' PASANG LISPLANK PAPAN LEBAH BERGAYUT


TENAGA
Pekerja 0.1000 OH 58,000.00 5,800.00
Tukang kayu 0.2000 OH 73,000.00 14,600.00
Kepala Tukang 0.0250 OH 82,000.00 2,050.00
Mandor 0.0050 OH 84,000.00 420.00
BAHAN
PAPAN LISPLANK UKIR 1.2000 M' 84,000.00 100,800.00
Paku biasa 0.0500 Kg 15,000.00 750.00
SUB TOTAL 22,870.00 101,550.00
JUMLAH 124,420.00
DIBULATKAN 124,420.00

1 M' PASANG PAPAN SINGAP UKIR (GRC)


TENAGA
Pekerja 0.1100 OH 58,000.00 6,380.00
Tukang kayu 0.2200 OH 73,000.00 16,060.00
Kepala Tukang 0.0220 OH 82,000.00 1,804.00
Mandor 0.0050 OH 84,000.00 420.00
BAHAN
PAPAN SINGAP UKIR (GRC) 1.2000 M2 630,000.00 756,000.00
Paku biasa 0.0500 Kg 15,000.00 750.00
SUB TOTAL 24,664.00 756,750.00
JUMLAH 781,414.00
DIBULATKAN 781,410.00

1 M' PASANG LISPLANG UKURAN 2 X2/20


TENAGA
Pekerja 0.1000 OH 58,000.00 5,800.00
Tukang kayu 0.1000 OH 73,000.00 7,300.00
Kepala Tukang 0.0100 OH 82,000.00 820.00
Mandor 0.0500 OH 84,000.00 4,200.00
BAHAN
Kayu Meranti 0.0088 M3 3,675,000.00 32,340.00
Paku biasa 0.0600 Ltr 15,000.00 900.00
SUB TOTAL 18,120.00 33,240.00
JUMLAH 51,360.00
DIBULATKAN 51,360.00

1 M' PASANG LIST PLAFOND KAYU PROFIL


TENAGA
Pekerja 0.0210 OH 58,000.00 1,218.00
Tukang kayu 0.0210 OH 73,000.00 1,533.00
Kepala Tukang 0.0020 OH 82,000.00 164.00
Mandor 0.0010 OH 84,000.00 84.00
BAHAN
Kayu profil 1.0500 M' 4,350.00 4,567.50
Paku biasa 0.0200 Kg 15,000.00 300.00
SUB TOTAL 2,999.00 4,867.50
JUMLAH 7,866.50
DIBULATKAN 7,866.00

Page 23 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M2 PASANG PIRI-PIRI/PLAFOND LAMBERSIRING


TENAGA
Pekerja 0.6000 OH 58,000.00 34,800.00
Tukang kayu 0.1800 OH 73,000.00 13,140.00
Kepala Tukang 0.1800 OH 82,000.00 14,760.00
Mandor 0.0300 OH 84,000.00 2,520.00
BAHAN
Kayu Lambersiring (Jelutung) 0.0070 M3 5,100,000.00 35,700.00
Paku biasa 0.1000 Kg 15,000.00 1,500.00
SUB TOTAL 65,220.00 37,200.00
JUMLAH 102,420.00
DIBULATKAN 102,420.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

1 M3 MEMBUAT BETON 1:3:5


TENAGA
Pekerja 1.6500 OH 58,000.00 95,700.00
Tukang batu 0.2500 OH 73,000.00 18,250.00
Kepala Tukang 0.0250 OH 82,000.00 2,050.00
Mandor 0.0800 OH 84,000.00 6,720.00
BAHAN
Semen Portland 218.0000 Kg 1,320.00 287,760.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.8700 M3 200,000.00 174,000.00
SUB TOTAL 122,720.00 551,720.00
JUMLAH 674,440.00
DIBULATKAN 674,440.00
1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
TENAGA
Pekerja 0.0070 OH 58,000.00 406.00
Tukang Besi 0.0070 OH 73,000.00 511.00
Kepala Tukang 0.0007 OH 82,000.00 57.40
Mandor 0.0003 OH 84,000.00 25.20
BAHAN
Besi Beton Polos /Ulir 1.0500 Kg 12,000.00 12,600.00
Kawat Ikat Beton 0.0150 Kg 17,000.00 255.00
SUB TOTAL 999.60 12,855.00
JUMLAH 13,854.60
DIBULATKAN 13,850.00
1 M3 MEMBUAT BETON BERTULANG K 225 + BEKISTING
TENAGA
Pekerja 2.0000 OH 58,000.00 116,000.00
Tukang Kayu 0.1000 OH 73,000.00 7,300.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Kepala Tukang 0.0350 OH 82,000.00 2,870.00
Mandor 1.0000 OH 84,000.00 84,000.00
BAHAN
Kayu Klas III 0.1300 M3 2,100,000.00 273,000.00
Paku 1.0000 Kg 15,000.00 15,000.00
Semen Portland 371.0000 Kg 1,320.00 489,720.00
Pasir Beton 0.4986 M3 173,000.00 86,252.86
Koral Beton 0.7756 M3 200,000.00 155,111.11
SUB TOTAL 235,720.00 1,019,083.97
JUMLAH 1,254,803.97
DIBULATKAN 1,254,803.00

Page 24 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M3 MEMBUAT BETON CAMP. 1 : 2 : 3


TENAGA
Pekerja 1.6500 OH 58,000.00 95,700.00
Tukang batu 0.2750 OH 73,000.00 20,075.00
Kepala Tukang 0.0280 OH 82,000.00 2,296.00
Mandor 0.0830 OH 84,000.00 6,972.00
BAHAN
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
SUB TOTAL 125,043.00 672,320.00
JUMLAH 797,363.00
DIBULATKAN 797,363.00

1 M3 MEMBUAT PONDASI /POER BETON BERTULANG 125 KG+BEKISTING ( P )


TENAGA
Pekerja 3.9000 OH 58,000.00 226,200.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 1.0400 OH 73,000.00 75,920.00
Tukang Besi 1.0500 OH 73,000.00 76,650.00
Kepala Tukang 0.2450 OH 82,000.00 20,090.00
Mandor 0.1650 OH 84,000.00 13,860.00
BAHAN
Kayu Klas III 0.2000 M3 2,100,000.00 420,000.00
Paku Biasa 1.5000 Kg 15,000.00 22,500.00
Minyak bekisting 0.4000 Ltr 8,000.00 3,200.00
Besi beton polos 125.0000 Kg 12,000.00 1,500,000.00
Kawat beton 2.2500 Kg 17,000.00 38,250.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
SUB TOTAL 438,270.00 2,656,270.00
JUMLAH 3,094,540.00
DIBULATKAN 3,094,540.00

1 M3 MEMBUAT PONDASI /POER BETON BERTULANG 105 KG+BEKISTING ( P1)


TENAGA
Pekerja 3.9000 OH 58,000.00 226,200.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 1.0400 OH 73,000.00 75,920.00
Tukang Besi 1.0500 OH 73,000.00 76,650.00
Kepala Tukang 0.2450 OH 82,000.00 20,090.00
Mandor 0.1650 OH 84,000.00 13,860.00
BAHAN
Kayu Klas III 0.2000 M3 2,100,000.00 420,000.00
Paku Biasa 1.5000 Kg 15,000.00 22,500.00
Minyak bekisting 0.4000 Ltr 8,000.00 3,200.00
Besi beton polos 105.0000 Kg 12,000.00 1,260,000.00
Kawat beton 2.2500 Kg 17,000.00 38,250.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
SUB TOTAL 438,270.00 2,416,270.00
JUMLAH 2,854,540.00
DIBULATKAN 2,854,540.00

Page 25 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M3 MEMBUAT SLOOF BETON BERTULANG (160 KG+BEKISTING) TYPE S


TENAGA
Pekerja 4.8500 OH 58,000.00 281,300.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 1.5600 OH 73,000.00 113,880.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.3310 OH 82,000.00 27,142.00
Mandor 0.1700 OH 84,000.00 14,280.00
BAHAN
Kayu Klas III 0.2200 M3 2,100,000.00 462,000.00
Paku Biasa 2.0000 Kg 15,000.00 30,000.00
Minyak bekisting 0.6000 Ltr 8,000.00 4,800.00
Besi beton polos 160.0000 Kg 12,000.00 1,920,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
SUB TOTAL 564,352.00 3,140,120.00
JUMLAH 3,704,472.00
DIBULATKAN 3,704,470.00

1 M3 MEMBUAT SLOOF BETON BERTULANG (193 KG+BEKISTING) TYPE S1


TENAGA
Pekerja 4.8500 OH 58,000.00 281,300.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 1.5600 OH 73,000.00 113,880.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.3310 OH 82,000.00 27,142.00
Mandor 0.1700 OH 84,000.00 14,280.00
BAHAN
Kayu Klas III 0.2200 M3 2,100,000.00 462,000.00
Paku Biasa 2.0000 Kg 15,000.00 30,000.00
Minyak bekisting 0.6000 Ltr 8,000.00 4,800.00
Besi beton polos 193.0000 Kg 12,000.00 2,316,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
SUB TOTAL 564,352.00 3,536,120.00
JUMLAH 4,100,472.00
DIBULATKAN 4,100,470.00

1 M3 MEMBUAT SLOOF BETON BERTULANG (112 KG+BEKISTING) TYPE S2


TENAGA
Pekerja 4.8500 OH 58,000.00 281,300.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 1.5600 OH 73,000.00 113,880.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.3310 OH 82,000.00 27,142.00
Mandor 0.1700 OH 84,000.00 14,280.00
BAHAN
Kayu Klas III 0.2200 M3 2,100,000.00 462,000.00
Paku Biasa 2.0000 Kg 15,000.00 30,000.00
Minyak bekisting 0.6000 Ltr 8,000.00 4,800.00
Besi beton polos 112.0000 Kg 12,000.00 1,344,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
SUB TOTAL 564,352.00 2,564,120.00
JUMLAH 3,128,472.00
DIBULATKAN 3,128,470.00

Page 26 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M3 MEMBUAT KOLOM BETON BERTULANG (190 KG+BEKISTING) TYPE K


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 3.3000 OH 73,000.00 240,900.00
Tukang Besi 2.1000 OH 73,000.00 153,300.00
Kepala Tukang 0.5700 OH 82,000.00 46,740.00
Mandor 0.2500 OH 84,000.00 21,000.00
BAHAN
Kayu Klas III 0.4000 M3 2,100,000.00 840,000.00
Paku Biasa 4.0000 Kg 15,000.00 60,000.00
Minyak bekisting 2.0000 Ltr 8,000.00 16,000.00
Besi beton polos 190.0000 Kg 12,000.00 2,280,000.00
Kawat beton 4.5000 Kg 17,000.00 76,500.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1500 M3 2,100,000.00 315,000.00
Plywood 3.5000 Lbr 115,000.00 402,500.00
Dolken 24.0000 Btg 15,000.00 360,000.00
SUB TOTAL 833,170.00 5,022,320.00
JUMLAH 5,855,490.00
DIBULATKAN 5,855,490.00

1 M3 MEMBUAT KOLOM BETON BERTULANG (153 KG+BEKISTING) TYPE K'


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 3.3000 OH 73,000.00 240,900.00
Tukang Besi 2.1000 OH 73,000.00 153,300.00
Kepala Tukang 0.5700 OH 82,000.00 46,740.00
Mandor 0.2500 OH 84,000.00 21,000.00
BAHAN
Kayu Klas III 0.4000 M3 2,100,000.00 840,000.00
Paku Biasa 4.0000 Kg 15,000.00 60,000.00
Minyak bekisting 2.0000 Ltr 8,000.00 16,000.00
Besi beton polos 153.0000 Kg 12,000.00 1,836,000.00
Kawat beton 4.5000 Kg 17,000.00 76,500.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1500 M3 2,100,000.00 315,000.00
Plywood 3.5000 Lbr 115,000.00 402,500.00
Dolken 24.0000 Btg 15,000.00 360,000.00
SUB TOTAL 833,170.00 4,578,320.00
JUMLAH 5,411,490.00
DIBULATKAN 5,411,490.00
1 M3 MEMBUAT KOLOM BETON BERTULANG (193 KG+BEKISTING) ( KOLOM K1 )
TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 3.3000 OH 73,000.00 240,900.00
Tukang Besi 2.1000 OH 73,000.00 153,300.00
Kepala Tukang 0.5700 OH 82,000.00 46,740.00
Mandor 0.2500 OH 84,000.00 21,000.00
BAHAN
Kayu Klas III 0.4000 M3 2,100,000.00 840,000.00
Paku Biasa 4.0000 Kg 15,000.00 60,000.00
Minyak bekisting 2.0000 Ltr 8,000.00 16,000.00
Besi beton polos 193.0000 Kg 12,000.00 2,316,000.00
Kawat beton 4.5000 Kg 17,000.00 76,500.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1500 M3 2,100,000.00 315,000.00
Plywood 3.5000 Lbr 115,000.00 402,500.00
Dolken 24.0000 Btg 15,000.00 360,000.00
SUB TOTAL 833,170.00 5,058,320.00

Page 27 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
JUMLAH 5,891,490.00
DIBULATKAN 5,891,490.00

Page 28 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M3 MEMBUAT KOLOM BETON BERTULANG (152 KG+BEKISTING) ( KOLOM K1' )


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 3.3000 OH 73,000.00 240,900.00
Tukang Besi 2.1000 OH 73,000.00 153,300.00
Kepala Tukang 0.5700 OH 82,000.00 46,740.00
Mandor 0.2500 OH 84,000.00 21,000.00
BAHAN
Kayu Klas III 0.4000 M3 2,100,000.00 840,000.00
Paku Biasa 4.0000 Kg 15,000.00 60,000.00
Minyak bekisting 2.0000 Ltr 8,000.00 16,000.00
Besi beton polos 152.0000 Kg 12,000.00 1,824,000.00
Kawat beton 4.5000 Kg 17,000.00 76,500.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1500 M3 2,100,000.00 315,000.00
Plywood 3.5000 Lbr 115,000.00 402,500.00
Dolken 24.0000 Btg 15,000.00 360,000.00
SUB TOTAL 833,170.00 4,566,320.00
JUMLAH 5,399,490.00
DIBULATKAN 5,399,490.00

1 M3 MEMBUAT KOLOM BETON BERTULANG (150 KG+BEKISTING) TYPE K2


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 3.3000 OH 73,000.00 240,900.00
Tukang Besi 2.1000 OH 73,000.00 153,300.00
Kepala Tukang 0.5700 OH 82,000.00 46,740.00
Mandor 0.2500 OH 84,000.00 21,000.00
BAHAN
Kayu Klas III 0.4000 M3 2,100,000.00 840,000.00
Paku Biasa 4.0000 Kg 15,000.00 60,000.00
Minyak bekisting 2.0000 Ltr 8,000.00 16,000.00
Besi beton polos 150.0000 Kg 12,000.00 1,800,000.00
Kawat beton 4.5000 Kg 17,000.00 76,500.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1500 M3 2,100,000.00 315,000.00
Plywood 3.5000 Lbr 115,000.00 402,500.00
Dolken 24.0000 Btg 15,000.00 360,000.00
SUB TOTAL 833,170.00 4,542,320.00
JUMLAH 5,375,490.00
DIBULATKAN 5,375,490.00

1 M3 MEMBUAT KOLOM BETON BERTULANG (90 KG+BEKISTING) TYPE K3


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 3.3000 OH 73,000.00 240,900.00
Tukang Besi 2.1000 OH 73,000.00 153,300.00
Kepala Tukang 0.5700 OH 82,000.00 46,740.00
Mandor 0.2500 OH 84,000.00 21,000.00
BAHAN
Kayu Klas III 0.4000 M3 2,100,000.00 840,000.00
Paku Biasa 4.0000 Kg 15,000.00 60,000.00
Minyak bekisting 2.0000 Ltr 8,000.00 16,000.00
Besi beton polos 90.0000 Kg 12,000.00 1,080,000.00
Kawat beton 4.5000 Kg 17,000.00 76,500.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1500 M3 2,100,000.00 315,000.00
Plywood 3.5000 Lbr 115,000.00 402,500.00
Dolken 24.0000 Btg 15,000.00 360,000.00
SUB TOTAL 833,170.00 3,822,320.00
Page 29 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
JUMLAH 4,655,490.00
DIBULATKAN 4,655,490.00

Page 30 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M3 MEMBUAT KOLOM BETON BERTULANG (90 KG+BEKISTING) TYPE K4


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 3.3000 OH 73,000.00 240,900.00
Tukang Besi 2.1000 OH 73,000.00 153,300.00
Kepala Tukang 0.5700 OH 82,000.00 46,740.00
Mandor 0.2500 OH 84,000.00 21,000.00
BAHAN
Kayu Klas III 0.4000 M3 2,100,000.00 840,000.00
Paku Biasa 4.0000 Kg 15,000.00 60,000.00
Minyak bekisting 2.0000 Ltr 8,000.00 16,000.00
Besi beton polos 90.0000 Kg 12,000.00 1,080,000.00
Kawat beton 4.5000 Kg 17,000.00 76,500.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1500 M3 2,100,000.00 315,000.00
Plywood 3.5000 Lbr 115,000.00 402,500.00
Dolken 24.0000 Btg 15,000.00 360,000.00
SUB TOTAL 833,170.00 3,822,320.00
JUMLAH 4,655,490.00
DIBULATKAN 4,655,490.00

1 M3 MEMBUAT BALOK BETON BERTULANG (145 KG+BEKISTING) TYPE. B


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 2.8000 OH 73,000.00 204,400.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.4550 OH 82,000.00 37,310.00
Mandor 0.2080 OH 84,000.00 17,472.00
BAHAN
Kayu Klas III 0.3900 M3 2,100,000.00 819,000.00
Paku Biasa 3.2000 Kg 15,000.00 48,000.00
Minyak bekisting 1.6000 Ltr 8,000.00 12,800.00
Besi beton polos 145.0000 Kg 12,000.00 1,740,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1400 M3 2,100,000.00 294,000.00
Dolken 24.0000 Btg 15,000.00 360,000.00
SUB TOTAL 732,612.00 3,997,120.00
JUMLAH 4,729,732.00
DIBULATKAN 4,729,730.00

1 M3 MEMBUAT BALOK BETON BERTULANG (217 KG+BEKISTING) TYPE. B1


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 2.8000 OH 73,000.00 204,400.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.4550 OH 82,000.00 37,310.00
Mandor 0.2080 OH 84,000.00 17,472.00
BAHAN
Kayu Klas III 0.3900 M3 2,100,000.00 819,000.00
Paku Biasa 3.2000 Kg 15,000.00 48,000.00
Minyak bekisting 1.6000 Ltr 8,000.00 12,800.00
Besi beton polos 217.0000 Kg 12,000.00 2,604,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1400 M3 2,100,000.00 294,000.00
Dolken 24.0000 Btg 15,000.00 360,000.00
SUB TOTAL 732,612.00 4,861,120.00
JUMLAH 5,593,732.00
DIBULATKAN 5,593,730.00
Page 31 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M3 MEMBUAT BALOK BETON BERTULANG (97 KG+BEKISTING) TYPE. B2


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 2.8000 OH 73,000.00 204,400.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.4550 OH 82,000.00 37,310.00
Mandor 0.2080 OH 84,000.00 17,472.00
BAHAN
Kayu Klas III 0.3900 M3 2,100,000.00 819,000.00
Paku Biasa 3.2000 Kg 15,000.00 48,000.00
Minyak bekisting 1.6000 Ltr 8,000.00 12,800.00
Besi beton polos 97.0000 Kg 12,000.00 1,164,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1400 M3 2,100,000.00 294,000.00
Dolken 30.0000 Btg 15,000.00 450,000.00
SUB TOTAL 732,612.00 3,511,120.00
JUMLAH 4,243,732.00
DIBULATKAN 4,243,730.00

1 M3 MEMBUAT BALOK BETON BERTULANG (137 KG+BEKISTING) TYPE. B3


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 2.8000 OH 73,000.00 204,400.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.4550 OH 82,000.00 37,310.00
Mandor 0.2080 OH 84,000.00 17,472.00
BAHAN
Kayu Klas III 0.3667 M3 2,100,000.00 770,070.00
Paku Biasa 3.2000 Kg 15,000.00 48,000.00
Minyak bekisting 1.6000 Ltr 8,000.00 12,800.00
Besi beton polos 137.0000 Kg 12,000.00 1,644,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1400 M3 2,100,000.00 294,000.00
Dolken 30.0000 Btg 15,000.00 450,000.00
SUB TOTAL 732,612.00 3,942,190.00
JUMLAH 4,674,802.00
DIBULATKAN 4,674,800.00

1 M3 MEMBUAT BALOK BETON BERTULANG (132 KG+BEKISTING) TYPE. B4


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 2.8000 OH 73,000.00 204,400.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.4550 OH 82,000.00 37,310.00
Mandor 0.2080 OH 84,000.00 17,472.00
BAHAN
Kayu Klas III 0.3667 M3 2,100,000.00 770,070.00
Paku Biasa 3.2000 Kg 15,000.00 48,000.00
Minyak bekisting 1.6000 Ltr 8,000.00 12,800.00
Besi beton polos 132.0000 Kg 12,000.00 1,584,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1400 M3 2,100,000.00 294,000.00
Dolken 30.0000 Btg 15,000.00 450,000.00
SUB TOTAL 732,612.00 3,882,190.00
JUMLAH 4,614,802.00
DIBULATKAN 4,614,800.00

Page 32 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M3 MEMBUAT BALOK BETON BERTULANG (175 KG+BEKISTING) TYPE. BA


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 2.8000 OH 73,000.00 204,400.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.4550 OH 82,000.00 37,310.00
Mandor 0.2080 OH 84,000.00 17,472.00
BAHAN
Kayu Klas III 0.3667 M3 2,100,000.00 770,070.00
Paku Biasa 3.2000 Kg 15,000.00 48,000.00
Minyak bekisting 1.6000 Ltr 8,000.00 12,800.00
Besi beton polos 175.0000 Kg 12,000.00 2,100,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1400 M3 2,100,000.00 294,000.00
Dolken 30.0000 Btg 15,000.00 450,000.00
SUB TOTAL 732,612.00 4,398,190.00
JUMLAH 5,130,802.00
DIBULATKAN 5,130,800.00

1 M3 MEMBUAT BALOK BETON BERTULANG (143 KG+BEKISTING) TYPE. R


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 2.8000 OH 73,000.00 204,400.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.4550 OH 82,000.00 37,310.00
Mandor 0.2080 OH 84,000.00 17,472.00
BAHAN
Kayu Klas III 0.3900 M3 2,100,000.00 819,000.00
Paku Biasa 3.2000 Kg 15,000.00 48,000.00
Minyak bekisting 1.6000 Ltr 8,000.00 12,800.00
Besi beton polos 143.0000 Kg 12,000.00 1,716,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1400 M3 2,100,000.00 294,000.00
Dolken 24.0000 Btg 15,000.00 360,000.00
SUB TOTAL 732,612.00 3,973,120.00
JUMLAH 4,705,732.00
DIBULATKAN 4,705,730.00

1 M3 MEMBUAT BALOK BETON BERTULANG (120 KG+BEKISTING) TYPE. R'


TENAGA
Pekerja 5.9600 OH 58,000.00 345,680.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 2.8000 OH 73,000.00 204,400.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.4550 OH 82,000.00 37,310.00
Mandor 0.2080 OH 84,000.00 17,472.00
BAHAN
Kayu Klas III 0.3900 M3 2,100,000.00 819,000.00
Paku Biasa 3.2000 Kg 15,000.00 48,000.00
Minyak bekisting 1.6000 Ltr 8,000.00 12,800.00
Besi beton polos 120.0000 Kg 12,000.00 1,440,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1400 M3 2,100,000.00 294,000.00
Dolken 24.0000 Btg 15,000.00 360,000.00
SUB TOTAL 732,612.00 3,697,120.00
JUMLAH 4,429,732.00
DIBULATKAN 4,429,730.00

Page 33 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M3 MEMBUAT PLAT LANTAI BETON BERTULANG (110 KG+BEKISTING)


TENAGA
Pekerja 5.6000 OH 58,000.00 324,800.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 2.6400 OH 73,000.00 192,720.00
Tukang Besi 1.0500 OH 73,000.00 76,650.00
Kepala Tukang 0.4000 OH 82,000.00 32,800.00
Mandor 0.1930 OH 84,000.00 16,212.00
BAHAN
Kayu Klas III 0.2400 M3 2,100,000.00 504,000.00
Paku Biasa 3.2000 Kg 15,000.00 48,000.00
Minyak bekisting 1.6000 Ltr 8,000.00 12,800.00
Besi beton polos 110.0000 Kg 12,000.00 1,320,000.00
Kawat beton 2.2500 Kg 17,000.00 38,250.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1500 M3 2,100,000.00 315,000.00
Plywood 4 mm 2.8000 Lbr 56,700.00 158,760.00
Dolken 30.0000 Btg 15,000.00 450,000.00
SUB TOTAL 668,732.00 3,519,130.00
JUMLAH 4,187,862.00
DIBULATKAN 4,187,860.00
1 M3 MEMBUAT PLAT KANOPI BETON BERTULANG (80 KG+BEKISTING)
TENAGA
Pekerja 5.6000 OH 58,000.00 324,800.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 2.6400 OH 73,000.00 192,720.00
Tukang Besi 1.0500 OH 73,000.00 76,650.00
Kepala Tukang 0.4000 OH 82,000.00 32,800.00
Mandor 0.1930 OH 84,000.00 16,212.00
BAHAN
Kayu Klas III 0.2400 M3 2,100,000.00 504,000.00
Paku Biasa 3.2000 Kg 15,000.00 48,000.00
Minyak bekisting 1.6000 Ltr 8,000.00 12,800.00
Besi beton polos 80.0000 Kg 12,000.00 960,000.00
Kawat beton 2.2500 Kg 17,000.00 38,250.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1500 M3 2,100,000.00 315,000.00
Plywood 4 mm 2.8000 Lbr 56,700.00 158,760.00
Dolken 30.0000 Btg 15,000.00 450,000.00
SUB TOTAL 668,732.00 3,159,130.00
JUMLAH 3,827,862.00
DIBULATKAN 3,827,860.00
1 M3 MEMBUAT TANGGA BETON BERTULANG (110 KG+BEKISTING)
TENAGA
Pekerja 5.6000 OH 58,000.00 324,800.00
Tukang batu 0.3500 OH 73,000.00 25,550.00
Tukang Kayu 2.3000 OH 73,000.00 167,900.00
Tukang Besi 1.4000 OH 73,000.00 102,200.00
Kepala Tukang 0.4050 OH 82,000.00 33,210.00
Mandor 0.2020 OH 84,000.00 16,968.00
BAHAN
Kayu Klas III 0.2500 M3 2,100,000.00 525,000.00
Paku Biasa 3.0000 Kg 15,000.00 45,000.00
Minyak bekisting 1.2000 Ltr 8,000.00 9,600.00
Besi beton polos 110.0000 Kg 12,000.00 1,320,000.00
Kawat beton 3.0000 Kg 17,000.00 51,000.00
Semen Portland 323.0000 Kg 1,320.00 426,360.00
Pasir Beton 0.5200 M3 173,000.00 89,960.00
Koral Beton 0.7800 M3 200,000.00 156,000.00
Kayu balok 0.1400 M3 2,100,000.00 294,000.00
Plywood 4mm 2.5000 Lbr 56,700.00 141,750.00
Dolken 10.0000 Btg 15,000.00 150,000.00
SUB TOTAL 670,628.00 3,208,670.00

Page 34 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
JUMLAH 3,879,298.00
DIBULATKAN 3,879,290.00

Page 35 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M' MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11)


TENAGA
Pekerja 0.0600 OH 58,000.00 3,480.00
Tukang batu 0.0200 OH 73,000.00 1,460.00
Tukang Kayu 0.0200 OH 73,000.00 1,460.00
Tukang Besi 0.0200 OH 73,000.00 1,460.00
Kepala Tukang 0.0060 OH 82,000.00 492.00
Mandor 0.0030 OH 84,000.00 252.00
BAHAN
Kayu Klas III 0.0020 M3 2,100,000.00 4,200.00
Paku Biasa 0.0100 Kg 15,000.00 150.00
Besi beton polos 3.0000 Kg 12,000.00 36,000.00
Kawat beton 0.4500 Kg 17,000.00 7,650.00
Semen Portland 4.0000 Kg 1,320.00 5,280.00
Pasir Beton 0.0060 M3 173,000.00 1,038.00
Koral Beton 0.0090 M3 200,000.00 1,800.00
SUB TOTAL 8,604.00 56,118.00
JUMLAH 64,722.00
DIBULATKAN 64,720.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

1 M2 PASANG ATAP GENTENG METAL


TENAGA
Pekerja 0.2000 OH 58,000.00 11,600.00
Tukang Kayu 0.1000 OH 73,000.00 7,300.00
Kepala Tukang 0.0100 OH 82,000.00 820.00
Mandor 0.0010 OH 84,000.00 84.00
BAHAN
Atap Genteng metal 1.0200 M2 52,000.00 53,040.00
Paku atap genteng metal 0.2000 Kg 25,000.00 5,000.00
SUB TOTAL 19,804.00 58,040.00
JUMLAH 77,844.00
DIBULATKAN 77,840.00

1 M' PASANG NOK GENTENG METAL


TENAGA
Pekerja 0.2500 OH 58,000.00 14,500.00
Tukang Kayu 0.1500 OH 73,000.00 10,950.00
Kepala Tukang 0.0150 OH 82,000.00 1,230.00
Mandor 0.0130 OH 84,000.00 1,092.00
BAHAN
Nok genteng metal 1.1000 Lbr 27,300.00 30,030.00
Paku biasa 2'-5' 0.0500 Kg 25,000.00 1,250.00
SUB TOTAL 27,772.00 31,280.00
JUMLAH 59,052.00
DIBULATKAN 59,050.00

Page 36 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M' PASANG JURAI DALAM


TENAGA
Pekerja 0.2000 OH 58,000.00 11,600.00
Tukang Kayu 0.1500 OH 73,000.00 10,950.00
Kepala Tukang 0.0150 OH 82,000.00 1,230.00
Mandor 0.0130 OH 84,000.00 1,092.00
BAHAN
Seng Plat 0.2500 Lbr 47,000.00 11,750.00
Plastik Got 0.3000 M' 28,750.00 8,625.00
Paku biasa 2'-5' 0.0500 Kg 25,000.00 1,250.00
SUB TOTAL 24,872.00 21,625.00
JUMLAH 46,497.00
DIBULATKAN 46,490.00

1 M' PASANG BOLA - BOLA ATAP


TENAGA
Pekerja 0.2000 OH 58,000.00 11,600.00
Tukang Kayu 0.1500 OH 73,000.00 10,950.00
Kepala Tukang 0.0150 OH 82,000.00 1,230.00
Mandor 0.0130 OH 84,000.00 1,092.00
BAHAN
Bola - Bola Genteng 0.5000 Lbr 25,000.00 12,500.00
Paku biasa 2'-5' 0.0500 Kg 25,000.00 1,250.00
SUB TOTAL 24,872.00 13,750.00
JUMLAH 38,622.00
DIBULATKAN 38,620.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT-LANGIT

1 M2 LANGIT-LANGIT GYPSUM BOARD 9 MM


TENAGA
Pekerja 0.1000 OH 58,000.00 5,800.00
Tukang Kayu 0.0500 OH 73,000.00 3,650.00
Kepala Tukang 0.0050 OH 82,000.00 410.00
Mandor 0.0050 OH 84,000.00 420.00
BAHAN
Gypsum board 9 mm 0.3640 Lbr 68,200.00 24,824.80
Paku Gypsum 0.1100 Kg 25,000.00 2,750.00
SUB TOTAL 10,280.00 27,574.80
JUMLAH 37,854.80
DIBULATKAN 37,850.00

1 M' LIST LANGIT-LANGIT PROFIL GYPSUM


TENAGA
Pekerja 0.0500 OH 58,000.00 2,900.00
Tukang Kayu 0.0500 OH 73,000.00 3,650.00
Kepala Tukang 0.0050 OH 82,000.00 410.00
Mandor 0.0030 OH 84,000.00 252.00
BAHAN
List Profil Gypsum 1.1000 Lbr 3,500.00 3,850.00
Paku Gypsum 0.0100 Kg 25,000.00 250.00
SUB TOTAL 7,212.00 4,100.00
JUMLAH 11,312.00
DIBULATKAN 11,310.00

1 M' LIST LANGIT-LANGIT PROFIL KAYU


TENAGA
Pekerja 0.0500 OH 58,000.00 2,900.00
Tukang Kayu 0.0500 OH 73,000.00 3,650.00
Kepala Tukang 0.0050 OH 82,000.00 410.00
Mandor 0.0030 OH 84,000.00 252.00
BAHAN
List Kayu Profil 0.5000 Lbr 4,350.00 2,175.00
Paku Gypsum 0.0100 Kg 15,000.00 150.00
SUB TOTAL 7,212.00 2,325.00
JUMLAH 9,537.00
DIBULATKAN 9,530.00

Page 37 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

1 SET MEMASANG 1 BUAH KLOSET JONGKOK STANDART


TENAGA
Pekerja 1.0000 OH 58,000.00 58,000.00
Tukang Batu 1.5000 OH 73,000.00 109,500.00
Kepala Tukang 0.1500 OH 82,000.00 12,300.00
Mandor 0.1600 OH 84,000.00 13,440.00
BAHAN
Kloset Jongkok 1.0000 Bh 325,000.00 325,000.00
Semen Portland 6.0000 Kg 1,320.00 7,920.00
Pasir pasang 0.0100 M3 125,000.00 1,250.00
SUB TOTAL 193,240.00 334,170.00
JUMLAH 527,410.00
DIBULATKAN 527,410.00

1 SET MEMASANG 1 BUAH KLOSET DUDUK MONOBLOK


TENAGA
Pekerja 3.3000 OH 58,000.00 191,400.00
Tukang Batu 1.1000 OH 73,000.00 80,300.00
Kepala Tukang 0.0010 OH 82,000.00 82.00
Mandor 0.1600 OH 84,000.00 13,440.00
BAHAN
Kloset Duduk/monoblok 1.0000 Bh 1,450,000.00 1,450,000.00
Perlengkapan (6% dari harga kloset) 1.0000 Ls 87,000.00 87,000.00
SUB TOTAL 285,222.00 1,537,000.00
JUMLAH 1,822,222.00
DIBULATKAN 1,822,220.00

1 SET MEMASANG 1 BUAH WASTAFEL


TENAGA
Pekerja 1.2000 OH 58,000.00 69,600.00
Tukang Batu 1.4500 OH 73,000.00 105,850.00
Kepala Tukang 0.1500 OH 82,000.00 12,300.00
Mandor 0.1000 OH 84,000.00 8,400.00
BAHAN
Wastafel 1.0000 Bh 700,000.00 700,000.00
Perlengkapan (12% dari harga Wastafel 1.0000 Ls 84,000.00 84,000.00
Semen Portland 6.0000 Kg 1,320.00 7,920.00
Pasir pasang 0.0100 M3 125,000.00 1,250.00
SUB TOTAL 196,150.00 793,170.00
JUMLAH 989,320.00
DIBULATKAN 989,320.00
1 SET MEMASANG 1 BUAH BAK MANDI FIBERGLASS KAPASITAS 0.3 M3
TENAGA
Pekerja 1.2000 OH 58,000.00 69,600.00
Tukang Batu 1.4500 OH 73,000.00 105,850.00
Kepala Tukang 0.1500 OH 82,000.00 12,300.00
Mandor 0.1000 OH 84,000.00 8,400.00
BAHAN
Bak fiberglass 1.0000 Bh 250,000.00 250,000.00
Perlengkapan (18% dari harga bak fiber 1.0000 Ls 45,000.00 45,000.00
SUB TOTAL 196,150.00 295,000.00
JUMLAH 491,150.00
DIBULATKAN 491,150.00

Page 38 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
1 BH MEMASANG 1 BUAH BAK KONTROL PAS.BATU BATA (45 x 45) TINGGI 50 CM
TENAGA
Pekerja 1.4200 OH 58,000.00 82,360.00
Tukang Batu 0.4730 OH 73,000.00 34,529.00
Kepala Tukang 0.0470 OH 82,000.00 3,854.00
Mandor 0.0710 OH 84,000.00 5,964.00
BAHAN
Batu bata 250.0000 Bh 675.00 168,750.00
Semen portland 77.0000 Kg 1,320.00 101,640.00
Pasir Pasang 0.1300 M3 125,000.00 16,250.00
Batu Kerikil 0.0200 M3 200,000.00 4,000.00
Besi Beton 2.6000 Kg 12,000.00 31,200.00
Pasir beton 0.0900 M3 173,000.00 15,570.00
SUB TOTAL 126,707.00 337,410.00
JUMLAH 464,117.00
DIBULATKAN 464,110.00

1 M' MEMASANG PIPA PVC TYPE AW DIA.1/2"


TENAGA
Pekerja 0.0360 OH 58,000.00 2,088.00
Tukang Batu 0.0600 OH 73,000.00 4,380.00
Kepala Tukang 0.0060 OH 82,000.00 492.00
Mandor 0.0018 OH 84,000.00 151.20
BAHAN
Pipa PVC 1.2000 M' 5,250.00 6,300.00
Perlengkapan (35%) 1.0000 Ls 1,837.50 1,837.50
SUB TOTAL 7,111.20 8,137.50
JUMLAH 15,248.70
DIBULATKAN 15,240.00

1 M' MEMASANG PIPA PVC TYPE AW DIA.3/4"


TENAGA
Pekerja 0.0360 OH 58,000.00 2,088.00
Tukang Batu 0.0600 OH 73,000.00 4,380.00
Kepala Tukang 0.0060 OH 82,000.00 492.00
Mandor 0.0018 OH 84,000.00 151.20
BAHAN
Pipa PVC 1.2000 M' 6,750.00 8,100.00
Perlengkapan (35%) 1.0000 Ls 2,362.50 2,362.50
SUB TOTAL 7,111.20 10,462.50
JUMLAH 17,573.70
DIBULATKAN 17,570.00

1 M' MEMASANG PIPA PVC TYPE AW DIA.3"


TENAGA
Pekerja 0.0810 OH 58,000.00 4,698.00
Tukang Batu 0.1350 OH 73,000.00 9,855.00
Kepala Tukang 0.0135 OH 82,000.00 1,107.00
Mandor 0.0041 OH 84,000.00 344.40
BAHAN
Pipa PVC 1.2000 M' 55,000.00 66,000.00
Perlengkapan (35%) 1.0000 Ls 19,250.00 19,250.00
SUB TOTAL 16,004.40 85,250.00
JUMLAH 101,254.40
DIBULATKAN 101,250.00

1 M' MEMASANG PIPA PVC TYPE AW DIA.4"


TENAGA
Pekerja 0.0810 OH 58,000.00 4,698.00
Tukang Batu 0.1350 OH 73,000.00 9,855.00
Kepala Tukang 0.0135 OH 82,000.00 1,107.00
Mandor 0.0041 OH 84,000.00 344.40
BAHAN
Pipa PVC 1.2000 M' 61,000.00 73,200.00
Perlengkapan (35%) 1.0000 Ls 21,350.00 21,350.00
SUB TOTAL 16,004.40 94,550.00
JUMLAH 110,554.40
DIBULATKAN 110,550.00

Page 39 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 BH MEMASANG KRAN DIA. 1/2" ATAU 3/4"


TENAGA
Pekerja 0.0100 OH 58,000.00 580.00
Tukang Batu 0.1000 OH 73,000.00 7,300.00
Kepala Tukang 0.0100 OH 82,000.00 820.00
Mandor 0.0050 OH 84,000.00 420.00
BAHAN
Kran air 1.0000 Bh 28,000.00 28,000.00
Seal Tape 0.0250 Bh 4,500.00 112.50
SUB TOTAL 9,120.00 28,112.50
JUMLAH 37,232.50
DIBULATKAN 37,230.00

1 BH MEMASANG FLOOR DRAIN


TENAGA
Pekerja 0.0100 OH 58,000.00 580.00
Tukang Batu 0.1000 OH 73,000.00 7,300.00
Kepala Tukang 0.0100 OH 82,000.00 820.00
Mandor 0.0050 OH 84,000.00 420.00
BAHAN
floordrain 1.0000 Bh 15,000.00 15,000.00
SUB TOTAL 9,120.00 15,000.00
JUMLAH 24,120.00
DIBULATKAN 24,120.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA

1 BH PASANG KUNCI TANAM BIASA


TENAGA
Pekerja 0.0100 OH 58,000.00 580.00
Tukang Kayu 0.5000 OH 73,000.00 36,500.00
Kepala Tukang 0.0100 OH 82,000.00 820.00
Mandor 0.0050 OH 84,000.00 420.00
BAHAN
Kunci Tanam Biasa 1.0000 Bh 100,000.00 100,000.00
SUB TOTAL 38,320.00 100,000.00
JUMLAH 138,320.00
DIBULATKAN 138,320.00

1 BH PASANG ENGSEL PINTU


TENAGA
Pekerja 0.0150 OH 58,000.00 870.00
Tukang Kayu 0.1500 OH 73,000.00 10,950.00
Kepala Tukang 0.0150 OH 82,000.00 1,230.00
Mandor 0.0008 OH 84,000.00 63.00
BAHAN
Engsel Kuningan 4" 1.0000 Bh 14,000.00 14,000.00
SUB TOTAL 13,113.00 14,000.00
JUMLAH 27,113.00
DIBULATKAN 27,110.00

1 BH PASANG ENGSEL JENDELA


TENAGA
Pekerja 0.0100 OH 58,000.00 580.00
Tukang Kayu 0.1000 OH 73,000.00 7,300.00
Kepala Tukang 0.0100 OH 82,000.00 820.00
Mandor 0.0005 OH 84,000.00 42.00
BAHAN
Engsel Jendela 3" 1.0000 Bh 15,000.00 15,000.00
SUB TOTAL 8,742.00 15,000.00
JUMLAH 23,742.00
DIBULATKAN 23,740.00

Page 40 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 BH PASANG GRENDEL PINTU


TENAGA
Pekerja 0.0150 OH 58,000.00 870.00
Tukang Kayu 0.1500 OH 73,000.00 10,950.00
Kepala Tukang 0.0150 OH 82,000.00 1,230.00
Mandor 0.0008 OH 84,000.00 63.00
BAHAN
Grendel Pintu 1.0000 Bh 15,000.00 15,000.00
SUB TOTAL 13,113.00 15,000.00
JUMLAH 28,113.00
DIBULATKAN 28,110.00

1 BH PASANG GRENDEL JENDELA


TENAGA
Pekerja 0.0150 OH 58,000.00 870.00
Tukang Kayu 0.1500 OH 73,000.00 10,950.00
Kepala Tukang 0.0150 OH 82,000.00 1,230.00
Mandor 0.0008 OH 84,000.00 63.00
BAHAN
Grendel Jendela 1.0000 Bh 10,000.00 10,000.00
SUB TOTAL 13,113.00 10,000.00
JUMLAH 23,113.00
DIBULATKAN 23,110.00

1 BH PASANG KAIT ANGIN / HAK ANGIN


TENAGA
Pekerja 0.0150 OH 58,000.00 870.00
Tukang Kayu 0.1500 OH 73,000.00 10,950.00
Kepala Tukang 0.0150 OH 82,000.00 1,230.00
Mandor 0.0008 OH 84,000.00 63.00
BAHAN
Kait Angin 1.0000 Bh 27,500.00 27,500.00
SUB TOTAL 13,113.00 27,500.00
JUMLAH 40,613.00
DIBULATKAN 40,610.00

1 BH PASANG TARIKAN TANGAN


TENAGA
Pekerja 0.0150 OH 58,000.00 870.00
Tukang Kayu 0.1500 OH 73,000.00 10,950.00
Kepala Tukang 0.0150 OH 82,000.00 1,230.00
Mandor 0.0008 OH 84,000.00 63.00
BAHAN
Kait Angin 1.0000 Bh 27,500.00 27,500.00
SUB TOTAL 13,113.00 27,500.00
JUMLAH 40,613.00
DIBULATKAN 40,610.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN LANTAI & DINDING


1 M2 PASANG LANTAI KERAMIK 40x40
TENAGA
Pekerja 0.6200 OH 58,000.00 35,960.00
Tukang Batu 0.3500 OH 73,000.00 25,550.00
Kepala Tukang 0.0350 OH 82,000.00 2,870.00
Mandor 0.0300 OH 84,000.00 2,520.00
BAHAN
Keramik 40x40 6.0000 Bh 15,000.00 90,000.00
Semen Portland 11.3800 Kg 1,320.00 15,021.60
Pasir Pasang 0.0420 M3 125,000.00 5,250.00
Semen warna 1.0000 Kg 12,000.00 12,000.00
SUB TOTAL 66,900.00 122,271.60
JUMLAH 189,171.60
DIBULATKAN 189,170.00

Page 41 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
1 M2 PASANG LANTAI KERAMIK 30x30
TENAGA
Pekerja 0.6200 OH 58,000.00 35,960.00
Tukang Batu 0.3500 OH 73,000.00 25,550.00
Kepala Tukang 0.0350 OH 82,000.00 2,870.00
Mandor 0.0300 OH 84,000.00 2,520.00
BAHAN
Keramik 30x30 11.0000 Bh 7,200.00 79,200.00
Semen Portland 11.3800 Kg 1,320.00 15,021.60
Pasir Pasang 0.0420 M3 125,000.00 5,250.00
Semen warna 1.0000 Kg 12,000.00 12,000.00
SUB TOTAL 66,900.00 111,471.60
JUMLAH 178,371.60
DIBULATKAN 178,370.00
1 M2 PASANG LANTAI KERAMIK 20x20
TENAGA
Pekerja 0.6200 OH 58,000.00 35,960.00
Tukang Batu 0.3500 OH 73,000.00 25,550.00
Kepala Tukang 0.0350 OH 82,000.00 2,870.00
Mandor 0.0300 OH 84,000.00 2,520.00
BAHAN
Keramik 20x20 25.0000 Bh 2,600.00 65,000.00
Semen Portland 11.3800 Kg 1,320.00 15,021.60
Pasir Pasang 0.0420 M3 125,000.00 5,250.00
Semen warna 1.0000 Kg 12,000.00 12,000.00
SUB TOTAL 66,900.00 97,271.60
JUMLAH 164,171.60
DIBULATKAN 164,170.00

1 M2 DINDING KERAMIK 20x25


TENAGA
Pekerja 0.6200 OH 58,000.00 35,960.00
Tukang Batu 0.3500 OH 73,000.00 25,550.00
Kepala Tukang 0.0350 OH 82,000.00 2,870.00
Mandor 0.0300 OH 84,000.00 2,520.00
BAHAN
Keramik 20x25 20.0000 Bh 3,300.00 66,000.00
Semen Portland 11.3800 Kg 1,320.00 15,021.60
Pasir Pasang 0.0420 M3 125,000.00 5,250.00
Semen warna 1.0000 Kg 2,500.00 2,500.00
SUB TOTAL 66,900.00 88,771.60
JUMLAH 155,671.60
DIBULATKAN 155,670.00

1 M' PASANG LIST DINDING KERAMIK 5 X 20 CM


TENAGA
Pekerja 0.0900 OH 58,000.00 5,220.00
Tukang Batu 0.0900 OH 73,000.00 6,570.00
Kepala Tukang 0.0090 OH 82,000.00 738.00
Mandor 0.0045 OH 84,000.00 378.00
BAHAN
List Keramik 5/20 Cm 5.0000 Bh 12,000.00 60,000.00
Semen Portland 1.6500 Kg 1,320.00 2,178.00
Pasir Pasang 0.0032 M3 125,000.00 400.00
Semen warna 0.1000 Kg 2,500.00 250.00
SUB TOTAL 12,906.00 62,828.00
JUMLAH 75,734.00
DIBULATKAN 75,730.00

Page 42 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M' PASANG PLINT KERAMIK 10x40


TENAGA
Pekerja 0.0600 OH 58,000.00 3,480.00
Tukang Batu 0.0300 OH 73,000.00 2,190.00
Kepala Tukang 0.0030 OH 82,000.00 246.00
Mandor 0.0030 OH 84,000.00 252.00
BAHAN
Plin Keramik 10x40 4.0000 Bh 3,750.00 15,000.00
Semen Portland 1.6500 Kg 1,320.00 2,178.00
Pasir Pasang 0.0032 M3 125,000.00 400.00
Semen warna 0.1000 Kg 12,000.00 1,200.00
SUB TOTAL 6,168.00 18,778.00
JUMLAH 24,946.00
DIBULATKAN 24,940.00

1 M2 PASANG BATU ANDESIT


TENAGA
Pekerja 0.6200 OH 58,000.00 35,960.00
Tukang Batu 0.3500 OH 73,000.00 25,550.00
Kepala Tukang 0.0350 OH 82,000.00 2,870.00
Mandor 0.0300 OH 84,000.00 2,520.00
BAHAN
Batu Andesit 1.0500 M2 230,000.00 241,500.00
Semen 11.7500 Kg 1,320.00 15,510.00
Pasir Pasang 0.0350 M3 125,000.00 4,375.00
SUB TOTAL 66,900.00 261,385.00
JUMLAH 328,285.00
DIBULATKAN 328,280.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN

1 M2 PENGECATAN BIDANG KAYU BARU (1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP)


TENAGA
Pekerja 0.0700 OH 58,000.00 4,060.00
Tukang Cat 0.0090 OH 73,000.00 657.00
Kepala Tukang 0.0060 OH 82,000.00 492.00
Mandor 0.0025 OH 84,000.00 210.00
BAHAN
Cat meni 0.2000 Kg 24,000.00 4,800.00
Plamir 0.1500 Kg 20,000.00 3,000.00
Cat dasar 0.1700 Kg 24,000.00 4,080.00
Cat penutup 2X 0.2600 Kg 50,000.00 13,000.00
SUB TOTAL 5,419.00 24,880.00
JUMLAH 30,299.00
DIBULATKAN 30,290.00

1 M2 VERNISH
TENAGA
Pekerja 0.1600 OH 58,000.00 9,280.00
Tukang Cat 0.1600 OH 73,000.00 11,680.00
Kepala Tukang 0.0160 OH 82,000.00 1,312.00
Mandor 0.0025 OH 84,000.00 210.00
BAHAN
Vernish 0.1500 Ltr 55,000.00 8,250.00
Dempul 0.0500 Kg 26,000.00 1,300.00
Amplas 0.1000 Lbt 5,000.00 500.00
Kuas 0.0100 Bh 10,000.00 100.00
SUB TOTAL 22,482.00 10,150.00
JUMLAH 32,632.00
DIBULATKAN 32,630.00

Page 43 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
1 M2 PENGECATAN BIDANG TEMBOK BARU BAG LUAR(1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP)
TENAGA
Pekerja 0.0200 OH 58,000.00 1,160.00
Tukang Cat 0.0630 OH 73,000.00 4,599.00
Kepala Tukang 0.0063 OH 82,000.00 516.60
Mandor 0.0025 OH 84,000.00 210.00
BAHAN
Plamir 0.1000 Kg 20,000.00 2,000.00
Cat dasar 0.1000 Kg 20,000.00 2,000.00
Cat penutup 2X 0.2600 Kg 20,000.00 5,200.00
SUB TOTAL 6,485.60 9,200.00
JUMLAH 15,685.60
DIBULATKAN 15,680.00

1 M2 PENGECATAN BIDANG TEMBOK BARU (1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP)


TENAGA
Pekerja 0.0200 OH 58,000.00 1,160.00
Tukang Cat 0.0630 OH 73,000.00 4,599.00
Kepala Tukang 0.0063 OH 82,000.00 516.60
Mandor 0.0025 OH 84,000.00 210.00
BAHAN
Plamir 0.1000 Kg 20,000.00 2,000.00
Cat dasar 0.1000 Kg 24,000.00 2,400.00
Cat penutup 2X 0.2600 Kg 20,000.00 5,200.00
SUB TOTAL 6,485.60 9,600.00
JUMLAH 16,085.60
DIBULATKAN 16,080.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN LAIN-LAIN


1 BH PASANG CEROCOK KAYU
TENAGA
Pekerja 0.2500 OH 58,000.00 14,500.00
Tukang Kayu 0.0300 OH 73,000.00 2,190.00
Kepala Tukang 0.0040 OH 82,000.00 328.00
Mandor 0.0300 OH 84,000.00 2,520.00
BAHAN
Cerocok Kayu Ubar Dia. 12 Cm 1.0000 Btg 26,000.00 26,000.00
SUB TOTAL 19,538.00 26,000.00
JUMLAH 45,538.00
DIBULATKAN 45,530.00

1 M2 PAVING BLOCK
TENAGA
Pekerja 0.4500 OH 58,000.00 26,100.00
Tukang Batu 0.0200 OH 73,000.00 1,460.00
Kepala Tukang 0.0200 OH 82,000.00 1,640.00
Mandor 0.0020 OH 84,000.00 168.00
BAHAN
Paving blok 38.0000 Bh 1,800.00 68,400.00
Pasir Pasang 0.0070 M3 125,000.00 875.00
SUB TOTAL 29,368.00 69,275.00
JUMLAH 98,643.00
DIBULATKAN 98,640.00

Page 44 of 57
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6

1 M' PEMBUATAN PARIT KELILING BANGUNAN


BAHAN + UPAH
Galinan Tanah 0.1200 M3 26,560.00 3,187.20
Urugan Pasir 0.0200 M3 150,240.00 3,004.80
Cor Lantai Kerja 0.0200 M3 674,440.00 13,488.80
Pasangan 1/2 Bata 0.7000 M2 102,490.00 71,743.00
Plerteran 1:4 1.4000 M2 46,740.00 65,436.00
SUB TOTAL 156,859.80 156,859.80
JUMLAH 156,859.80
DIBULATKAN 156,850.00

Pekanbaru, 2013

DIBUAT OLEH :
KEPALA BIDANG PENGEMBANGAN SM
DINAS PENDIDIKAN KOTA PEKANBARU
Selaku Kuasa Pengguna Anggaran/PPK

H. ADDAURI, M.Pd
Nip. 195703141978011002

Page 45 of 57
A
Kaki Kuda2 0.06 0.12 9.82 0.070704
Tiang Makelar 0.06 0.12 2.26 0.016272
Balok Tarik 0.06 0.12 6.63 2 0.095472
Balok Gapit 0.06 0.12 5 2 0.072
Skor Verikal 0.06 0.12 2 2 0.0288
Skor Diagonal' 0.06 0.12 2.9 2 0.04176
0.325008
Jumlah Kuda-kuda 2.5 0.81252

ATAP TERAS
I 2.695 3.15 8.48925

ATAP UTAMA
I 118.3589 126.8482
II 107.3584
III 89.20268
IV
LT I
Jumlah T.Kayu L.Kayu P. Kayu Luas Volume Engsel Grendel
Type
Unit M M M M2 M3 4" 3" 4" 3"
PJ 2 0.05 0.13 12.85 3.4 0.083525 3 2 2 2
P' 1 0.05 0.13 4.9 1.71 0.03185 3 0 2 0
P1 3 0.05 0.13 11 3.92 0.0715 6 0 2 0
J 25 0.05 0.13 14 2.72 0.091 0 6 0 6
J2 0.05 0.13 10.2 1.955 0.0663 0 4 0 4
V1 4 0.05 0.13 6 0.96 0.039 0 0 0 0
V2 0 0.05 0.13 3.5 0.57 0.02275 0 0 0 0

LT II
Jumlah T.Kayu L.Kayu P. Kayu Luas Volume Engsel Grendel
Type
Unit M M M M2 M3 4" 3" 4" 3"
PJ 1 0.05 0.13 12.85 3.4 0.083525 3 2 2 2
P 1 0.05 0.13 8.9 2.52 0.05785 3 0 2 0
P2 4 0.05 0.13 11 3.92 0.0715 6 0 2 0
J 24 0.05 0.13 14 2.72 0.091 0 6 0 6
J1 1 0.05 0.13 10.2 1.955 0.0663 0 4 0 4
V1 4 0.05 0.13 6 0.96 0.039 0 0 0 0
V2 0 0.05 0.13 3.5 0.57 0.02275 0 0 0 0

MEJA LABOR
Jumlah T.Kayu L.Kayu P. Kayu Luas Volume Engsel Grendel
Type
Unit M M M M2 M3 4" 3" 4" 3"
P1 7 0.04 0.1 6.4 0 0.0256 0 0 0 0
H.Jendela H.Angin K.Tanam J.Kaca K.Mati K.Buram P. Panel P.fiber Ventilasi K
Bh Bh 2 Slaag M2 M2 M2 M2 Unit M2
1 2 1 0.45 0 0 1.72 0 0.65
0 0 1 0 0 0 1.52 0 0
0 0 1 0 0 0 2.795 0 0.63
3 6 0 1.35 0 0 0 0 0.75
2 4 0 0.9 0 0 0 0 0.5
0 0 0 0 0 0.69 0 0 0
0 0 0 0 0.4 0 0 0 0

H.Jendela H.Angin K.Tanam J.Kaca K.Mati K.Buram P. Panel P.fiber Ventilasi K


Bh Bh 2 Slaag M2 M2 M2 M2 Unit M2
1 2 1 0.45 0 0 1.72 0 0.65
0 0 1 0 0 0 1.72 0 0.4
0 0 1 0 0 0 2.795 0 0.63
3 6 0 1.35 0 0 0 0 0.75
2 4 0 0.9 0 0 0 0 0.5
0 0 0 0 0 0.69 0 0 0
0 0 0 0 0.4 0 0 0 0

H.Jendela H.Angin K.Tanam J.Kaca K.Mati K.Buram P. Panel P.fiber Ventilasi K


Bh Bh 2 Slaag M2 M2 M2 M2 Unit M2
0 0 0 0 0 0 1.1798 0 0
T.Luas T.Volume T. Engsel T. Grendel
T.H.Jendela T. H. Angin T. K. Tanam
M2 M2 4" 3" 4" 3"
6.8 0.16705 6 4 4 4 2 4 2
1.71 0.03185 3 0 2 0 0 0 1
11.76 0.2145 18 0 6 0 0 0 3
68 2.275 0 150 0 150 75 150 0
0 0 0 0 0 0 0 0 0
3.84 0.156 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0

92.11 2.8444 27 154 12 154 77 154 6

T.Luas T.Volume T. Engsel T. Grendel


T.H.Jendela T. H. Angin T. K. Tanam
M2 M2 4" 3" 4" 3"
3.4 0.083525 3 2 2 2 1 2 1
2.52 0.05785 3 0 2 0 0 0 1
15.68 0.286 24 0 8 0 0 0 4
65.28 2.184 0 144 0 144 72 144 0
1.955 0.0663 0 4 0 4 2 4 0
3.84 0.156 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0

92.675 2.833675 30 150 12 150 75 150 6

T.Luas T.Volume T. Engsel T. Grendel


T.H.Jendela T. H. Angin T. K. Tanam
M2 M2 4" 3" 4" 3"
0 0.1792 0 0 0 0 0 0 0

0 0.1792 0 0 0 0 0 0 0
T.J.Kaca T. K. Mati T. K. Buram T.P.Panel T.P.fiber T.Ventilasi Mati
0.9 0 0 3.44 0 1.3
0 0 0 1.52 0 0
0 0 0 8.385 0 1.89
33.75 0 0 0 0 18.75
0 0 0 0 0 0
0 0 2.76 0 0 0
0 0 0 0 0 0

34.65 0 2.76 13.345 0 21.94

T.J.Kaca T. K. Mati T. K. Buram T.P.Panel T.P.fiber T.Ventilasi Mati


0.45 0 0 1.72 0 0.65
0 0 0 1.72 0 0.4
0 0 0 11.18 0 2.52
32.4 0 0 0 0 18
0.9 0 0 0 0 0.5
0 0 2.76 0 0 0
0 0 0 0 0 0

33.75 0 2.76 14.62 0 22.07

T.J.Kaca T. K. Mati T. K. Buram T.P.Panel T.P.fiber T.Ventilasi Mati


0 0 0 8.2586 0 0

0 0 0 8.2586 0 0
cat minyak Cat pintu panel Cat Jendela
kozen
6.425 6.88 0.672
1.225 3.04
8.25 16.77
87.5 0 25.2
0 0 0
6 0 0
0 0 0
0

109.4 26.69 25.872

cat minyak Cat pintu panel Cat Jendela


kozen
3.2125 3.44 0.336
2.225 3.44
11 22.36
84 0 24.192
2.55 0 0.672
6 0 0
0 0 0
0

108.9875 29.24 25.2

cat minyak Cat pintu panel Cat Jendela


kozen
7.168 16.5172
0

7.168 16.5172 0
P1 0.006165 12 0.88776 1.4 2.857143
5.98 9.333333 49.54884
3.08 19.04762 52.08192 101.6308

P 0.006165 12 0.88776 1.2 4.166667


8.6 8 61.07789
2.58 27.77778 63.6228 124.7007

S 0.006165 16 1.57824 0.2 0.5 10


8 126.2592
0.006165 8 0.39456 0.2 0.5 1.3 34.1952
66.66667

S1 0.006165 16 1.57824 0.2 0.4 12.5


8 157.824
0.006165 8 0.39456 0.2 0.4 1.1 36.168
83.33333

S2 0.006165 10 0.6165 0.15 0.2 33.33333


4 82.2
0.006165 6 0.22194 0.15 0.2 0.6 29.592
222.2222

K 0.006165 16 1.57824 0.25 0.4 10


10 157.824
0.006165 8 0.39456 0.25 0.4 1.2 31.5648
66.66667

K' 0.006165 14 1.20834 0.25 0.4 10


10 120.834
0.006165 8 0.39456 0.25 0.4 1.2 31.5648
66.66667

K1 0.006165 14 1.20834 0.25 0.25 16


8 154.6675
0.006165 8 0.39456 0.25 0.25 0.9 37.87776
106.6667

K1' 0.006165 12 0.88776 0.25 0.25 16


8 113.6333
0.006165 8 0.39456 0.25 0.25 0.9 37.87776
106.6667
K2 0.006165 10 0.6165 0.11 0.2 45.45455
4 112.0909
0.006165 6 0.22194 0.13 0.2 0.52 34.97236
303.0303

K3 0.006165 10 0.6165 0.2 0.2 25


4 61.65
0.006165 6 0.22194 0.2 0.2 0.7 25.893
166.6667

K4 0.006165 8 0.39456 0.1 0.3 33.33333


4 52.608
0.006165 6 0.22194 0.1 0.3 0.74 36.4968
222.2222

B 0.006165 16 1.57824 0.25 0.6 6.666667


10 105.216
0.006165 12 0.88776 0.25 0.6 6.666667
2 11.8368
0.006165 8 0.39456 0.25 0.6 1.6 28.0576
44.44444

B1 0.006165 16 1.57824 0.2 0.4 12.5


8 157.824
0.006165 12 0.88776 0.2 0.4 12.5
2 22.194
0.006165 8 0.39456 0.2 0.45 1.1 36.168
83.33333

B2 0.006165 12 0.88776 0.15 0.6 7.936508


6 42.27429
0.006165 12 0.88776 0.15 0.6 7.936508
2 14.09143
0.006165 8 0.39456 0.15 0.6 1.95 40.70857
52.91005

B3 0.006165 12 0.88776 0.15 0.5 13.33333


6 71.0208
0.006165 12 0.88776 0.15 0.5 13.33333
2 23.6736
0.006165 8 0.39456 0.15 0.5 1.2 42.0864
88.88889

B4 0.006165 12 0.88776 0.15 0.5 10.75269


6 57.27484
0.006165 12 0.88776 0.15 0.5 10.75269
2 19.09161
0.006165 8 0.39456 0.15 0.5 1.95 55.15355
71.68459

BA 0.006165 14 1.20834 0.2 0.35 14.28571


8 138.096
0.006165 12 0.88776 0.2 0.35 14.28571
0 0
0.006165 8 0.39456 0.2 0.35 1 37.57714
95.2381

R 0.006165 12 0.88776 0.15 0.25 26.66667


4 94.6944
0.006165 0 0 0.15 0.25 26.66667
0 0
0.006165 8 0.39456 0.15 0.25 0.7 49.1008
177.7778

R' 0.006165 12 0.88776 0.15 0.25 10.58201


8 75.15429
0.006165 12 0.88776 0.15 0.25 26.66667
0 0
0.006165 8 0.39456 0.15 0.25 1.6 44.53587
70.54674

Plat 0.006165 10 0.6165 1 8.333333


6.666667 68.5
55.55556 68.5 137
kg

kg

Tulangan Pokok
begel
160.4544 kg

Tulangan Pokok
begel
193.992 kg

Tulangan Pokok
begel
111.792 kg

Tulangan Pokok
begel
189.3888 kg

Tulangan Pokok
begel
152.3988 kg

Tulangan Pokok
begel
192.5453 kg

Tulangan Pokok
begel
151.511 kg
Tulangan Pokok
begel
147.0633 kg

Tulangan Pokok
begel
87.543 kg

Tulangan Pokok
begel
89.1048 kg

Tulangan Pokok

begel
145.1104 kg

Tulangan Pokok

begel
216.186 kg

Tulangan Pokok

begel
97.07429 kg

Tulangan Pokok

begel
136.7808 kg

Tulangan Pokok
begel
131.52 kg

Tulangan Pokok

begel
175.6731 kg

Tulangan Pokok

begel
143.7952 kg

Tulangan Pokok

begel

119.6902 kg

kg