You are on page 1of 3

SHAIJU NARAYANAN

TEL:08972912243
E-MAIL: nshaiju_2000@yahoo.com

PROFILE:
I have been involved in Project Management for over 6 years and have worked with project
management teams to develop and execute the plans for whole life cycle of Project. I am able to
work on own initiative and as part of a team. Dedicated to maintain high quality standards and
achieving Targets with in planned time and Budget. Having good Technical skills, communication
skills, pc skills and able to tackle site problems. I have good knowledge to plan and execute the
projects.

Core competencies and professional strengths include:


 Project Coordination & Execution.
 Project Estimation & Cost controlling.
 Manufacturing & fabrication.
 Process Improvement Planning

MAJOR ACHIEVEMENT:
• At present I am involved as a Sr.Engineer- Projects to construct CHP (Coal handling
Plant) for 2x500 Mw Power plant at DVC-Mejia,W.Bengal for ELECON. It includes
Erection & commissioning of Belt conveyors, Ring granulators, Paddle feeders, Bucket
wheel stacker reclimer and ancillary systems.
• Worked as a Project Planning& coordination engineer to setting up of Steel pipe plant&
Pipe coating plant (Production capacity: 300000 MT/Anum) for WELSPUN.
• Involved as a Planning& Execution engineer to implement Dual Layer Epoxy conveying
system at Welspun.
• Independently handled Project of Manufacturing & supply of Lime Stone conveying
system to HOLCIM for GMV project& systems, and completed the project with in allotted
time and Quality.
• Led the layout design, Manufacturing, erection & commissioning of the sugar bag
conveying system and ensured completion of the project on time& within budget.
• Coordinate with the contractors and team members to ensure on time completion of
Fabrication, Machining & testing of Material handling Equipments, Dampers, Blower,
conveyors & Pressure Vessels.

CAREER HISTORY:
Elecon engineering co. Ltd., Nov 2009 to Till Date
About My Company: Elecon (Material Handling Division) is a pioneer company in material
handling sector and Gear manufacturing.
My Job Profile:
Sr. Engineer – Project construction (2009- Till date)
• Site Co-ordination to get Equipments and material at site in on time.
• Preparing Erection activity plan.
• Monitoring daily activity of sub contractors to maintain progress of project as per plan.
• Inspect the installed equipments to meet the quality of project as per QAP.
• Maintain supportive documents for project activity.
• Commissioning the equipments and conduct trail run of the system.
Welspun Gujarat Stahl Rohren Ltd., April 2007- Nov 2009.
About My Company: Welspun (Pipe Division) is a Leading SAW Pipe Manufacturer in the world.
Annual turn over of the company is about US$ 3 Billion.
My Job Profile:
Sr. Engineer – Projects (2009)

Page 1 of 3
• Prepares baseline program and schedule based on the most appropriate method and
sequence of Project operations using MS-Project to execute the project.
• Indenting for recourses (Men, Material& Machinery ect.) and coordinate with purchase
department for technical negotiation and procurement.
• Anticipate and identify potential bottlenecks at work site that will affect schedule and work
out a recovery plan with sub contractor.

Engineer Projects. (2007-2009)


• Monitor and prepare different progress and forecast reports as needed by the
management.
• Ensure that supplier engineering deliverable is being submitted as per schedule.
• Facilitate and expedite resolution of engineering/ design issues which are affecting
progress at supplier works.
• Supervising assembly of Equipments.
• Compare manufacturing progress with respect to plan and ensure that agreed delivery
schedules are maintained.
• Verify shipping and logistic arrangement in consultation with Shipping /logistic Dept.
GMV Projects and Systems, Jan 2006 – Apr 2007
GMV is an EPC concern. They are the manufacturer of Material handling equipments and
Cement Plant Machineries.
Engineer - Projects.
• Preparing lay Out Drawing for material handling systems & Cross checking Equipment
Drawings.
• Preparing comparative statement & Negotiation with Vendors.
• Monitoring manufacturing Progress and ensure weather it is as per our schedule.
• Inspect and Expediting Equipments like conveyors, flap valves, blowers& cement plant
equipments as per QAP.
• Organize to dispatch the equipment safely to work site.
• Erection and commissioning of Equipment.

Megatherm D’Tech Pvt Ltd, Aug 2004 – Jan 2006


Megatherm is an EPC concern mainly dealing with Manufacturing of Deaerators, heat exchanger,
pressure vessel, Pollution control equipments & Process industries Equipment ect.
Engineer – Works
• Preparing Manufacturing Process Plan.
• Preparing Manufacturing Drawings use of AutoCAD.
• Supervising of Fabrication work.
• Sub Vendor Negotiation and job allocation.
• Providing necessary facility and coordination with Third Party Inspection team.
• Monitoring and controlling the total project as per Prescribed QAP to achieve good result.

EMPEE Sugars and Chemical Pvt Ltd., Oct 2003 – July 2004.
EMPEE Sugars is and sugar and allied product manufacturer.
Trainee Engineer
• My self had training in Preventive maintenance of Sugar Mill, Alcohol distillation plant and
boiler Unit.
• Supervision for Execution of Fume Extraction system for FBC Boiler.

QUALIFICATION:
• Currently pursuing MBA through IGNOU.
• B.E (First Class) in Mechanical Engineering from University of Madras.
• HSE (First Class) in Mathematics, Physics, chemistry, Biology

Page 2 of 3
ADDITIONAL QUALIFICATION:
• AutoCAD
• MS Project 2003
• MS Office (Excel, Word & Power point)
• SAP-MM Module (Familiar in User Level)
• Primavera P6 (Beginner)

ADDITIONAL INFORMATION:
• Date of Birth : 17-11-1981

• Status : Unmarried.

• Permanent Address : No-544A, Green House,


Vadakan Cherry,
Muyyam(P.O), Taliparambha (Tlk)
Kannur (D.T), Kerala – 670142

• Passport No : F 9814579 (Valid Up to 2016)

DECLARATION:

I here by declare that all information’s specified above are true only.

(SHAIJU)

Page 3 of 3

You might also like