You are on page 1of 12

TRACK INSPECTION SCHEDULE

Existing in Rapid Metro Prevailing in DMRC


S.No. Type of Inspection Prescribed Frequency Prescribed Frequency
JE/SE/SSE AM/Manager JE/SE/SSE AM/Manager
Foot Inspection Once in a month Once in three months Once in a month Once in three months
Cab Inspection Weekly Fortnightly Weekly Fortnightly
Inspection of Track on
1 Accompanying Track
Main Line
Recording run TRC/OMS Every Run Every Run Every Run Every Run
(Once in 2 months)
Detailed Inspections Once in 6 months Once in a Year Once in 6 months Once in a Year
Main Line
P1101 - P1104 Once in 2 months Once in 6 months - -
P1105 - P1108 Once in 3 months Once in a Year - -
Inspection of Point & P0101 - P0104 Once in 3 months Once in a Year - -
2 Crossing
All others Once in 6 months Once in a Year
Detailed Inspections Once in a Year 20 % Per Year Once in a Year 10 % Per Year
Depot Line
Jointly with S & T Once in 6 months Once in 6 months
Once in 6 months Once in 6 months Once in a Year
3 Inspection of Curves Once in a Year
with wear with wear
Once in month during Once in 3 months Once in month during
4 Inspection of REJ Once in 3 months May, June & Dec, jan May, June & Dec, jan

5 Inspection of Insulated Joints Once in 6 months Once in 3 months

6 Patrolling of Track by Track Maintainer/Keyman Whole Beat Length - Weekly Whole Beat Length - Weekly
Greasing of Outer Rail on Curves Sharper than Weekly, unless electronic greasing Weekly, unless electronic greasing
7
500 Meters Radius device is installed device is installed
Director / O&M
Proposed for Rapid Metro
Prescribed Frequency
JE/SE/SSE AM/Manager
Once in a month Once in three months
Weekly Fortnightly

Every Run Every Run

Once in 6 months Once in a Year


Once in 2 months Once in 6 months
Once in 3 months Once in a Year
Once in 3 months Once in a Year
Once in 6 months Once in a Year

Once in 6 months Once in a Year

Once in 6 months
Once in 6 months Once in a Year
with wear

Once in 3 months Once in month during


May, June & Dec, jan

Once in 6 months

Whole Beat Length - Weekly


Weekly, unless electronic greasing
device is installed
(S.K Kapoor)
Head Infrastructure

You might also like