Professional Documents
Culture Documents
6 Patrolling of Track by Track Maintainer/Keyman Whole Beat Length - Weekly Whole Beat Length - Weekly
Greasing of Outer Rail on Curves Sharper than Weekly, unless electronic greasing Weekly, unless electronic greasing
7
500 Meters Radius device is installed device is installed
Director / O&M
Proposed for Rapid Metro
Prescribed Frequency
JE/SE/SSE AM/Manager
Once in a month Once in three months
Weekly Fortnightly
Once in 6 months
Once in 6 months Once in a Year
with wear
Once in 6 months