TRANSPORTE MEDIDO CANTERA QUISTO KM 26+000 HASTA ACOPIO PATIÑO KM 11+300

Distancias km Factor Dist. Virtual


Acceso Cantera 4 1 4
Carretera Afirmada 14.7 1.1 16.17
18.7 1.07860963 20.17

RENDIMIENTOS DE TRANSPORTE
BASES DE CALCULO UND CICLO <=1KM >1KM

DISTANCIA MEDIA PONDERADA km 18.70 1.00 1.00


VELOCIDAD CARGADO km/h 20 20 20
VELOCIDAD DESCARGADO km/h 25 25 25
TIEMPO DE CARGA min 3.00 3.00
TIEMPO DE DESCARGA min 3.00 3.00
TIEMPO RECORRIDO CARGADO min 56.1 3 3
TIEMPO RECORRIDO DESCARGADO min 44.88 2.4 2.4
TIEMPO RECORRIDO min 100.98 5.40 5.40
CICLO TOTAL min 106.98 11.40 5.40
TIEMPO TRABAJADO POR DIA 8 HO min 480 480 480
EFICIENCIA % 90.00% 90.00% 90.00%
TIEMPO UTIL TRABAJADO min 432 432 432
VOLUMEN DEL VOLQUETE m3 15 15 15
RENDIMIENTO DEL CARGADOR m3/día 550 550
INCIDENCIA DEL CARGADOR hm 0.1091 1.0364
NUMERO DE VIAJES AL DIA u 4 38 80
VOLUMEN TRANSPORTADO POR DIA m3 60 570 1200
ESPONJAMIENTO 1.30 1.30 1.30

MIENTO M3 COMPACTADO (m3/dia) 46 438 923

ANALISIS DE PRECIOS UNITARIOS


APU. TRANSPORTE DE MATERIALES ( SUELTO REND. 570
DESCRIPCION CUADRILLA UND. CANT. P.U.
VOLQUETE 15M3 1.000 0.0140 117.44
CONTROLADOR 0.000 0.0000 16.61
CARGADOR FRONTAL 0.000 0.0000 235.94
0.095

APU. TRANSPORTE DE MATERIALES ( SUELTO REND. 1,200


DESCRIPCION CUADRILLA UND. CANT. P.U.
VOLQUETE 15M3 1.000 0.0067 117.44
CONTROLADOR 0.000 0.0000 16.61
SP VOLQUETE 15M3 REND. 8
DESCRIPCIONCUADRILLA UND. CANT. P.U.
VOLQUETE 15M3 MAQ. SECA 1 1 95.70
OPERADOR PESADO 1 1.0000 21.74
Petroleo 0 13.2

SP CARGADOR FRONTAL REND. 8


DESCRIPCIONCUADRILLA UND. CANT. P.U.
CARGADOR FRONTAL MAQ SECA 1 1 154.80
OPERADOR PESADO 1 1.0000 21.74
Petroleo 4.5 13.2

#VOLQUETES DE LA EMPRESA NEGEN: 4


#VOLQUETES A UTILIZAR EN TOTAL: 8

TRANSPORTE 1 CANTERA >>> ACOPIO


ACOPIO Mat. Recarga
CANT T5 ACCESO ACCESO DIST. MEDIA
"PATIÑO" suelto
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
26+000.00 4+000.00 11+300.00 0+000.00 18700.00 375.57
TOTAL 4882.41

Cuadro Resumen:
TIPO METRADO
<=1KM 4882.41
>1KM 86418.66

M3 TOTAL
4882.41 ###
1CAMION 1VIAJE
1CAMION 6VIAJES/DIA
4CAMIONES 6VIAJES/DIA
m3k <=1km
Parcial
1.65
0.00
0.00
1.65

m3k >1km
Parcial
0.78
0.00
0.78

Parcial
95.70
21.74
0.00
117.44

Parcial
154.80
21.74
59.40
235.94

NEGEN INGENIERIA

<=1KM >1KM

375.57 6647.59
375.57 6647.59
375.57 6647.59
375.57 6647.59
375.57 6647.59
375.57 6647.59
375.57 6647.59
375.57 6647.59
375.57 6647.59
375.57 6647.59
375.57 6647.59
375.57 6647.59
375.57 6647.59
4882.41 86418.66

PU PRESUPUESTO
S/ 1.65 S/ 8,047.58
S/ 0.78 S/ 67,660.05
Total S/ 75,707.63

(S/. /m3)
S/ 15.51

<1km >1km Total


15 265.5 S/ 232.59
94.5 1672.65 S/ 1,465.34
375.57 6647.59 S/ 5,823.66