OptiX OSN 8800 T16 Intelligent Optical Transport Platform

Quick Installation Guide

Issue: 07
Date: 2013-12-31

HUAWEI TECHNOLOGIES CO., LTD.


Copyright © Huawei Technologies Co., Ltd. 2013. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website: http://www.huawei.com
Email: support@huawei.com
Installation Flow

Start

Before You Start Page 1 Precautions

Regulation and
Page 2 Precautions for
Board Handling

Tools for
Page 3
Installation

Page4 to Unpacking the Subrack(s) in a 23-


6 Equipment Page 5 Inch Standard Open
Rack

Appearance of Installing Removable


Page Page7 Page 6
Installing Boards the Subrack Handles
11 to 12

Page 7 Installing the Subrack


Checking the DIP Page Installing the
Page 12
Switches on the EFI 8 to 10 Subrack

Checking the Battery


Page 13 Jumper on the Page Installing Installing and Routing
11 to 13 Boards Page 19 Ground Cables
TN16XCH

Checking the Battery Check Pluggable


Page 13 Page 19 Power Access Module
Jumper on the SCC Page 14 Optical Module of a Subrack
Information

Page Installing Installing and Routing


Page 20 Power Cables
Installing the Heat
Page 15 Baffle
15 to 18 Components

Housekeeping Alarm
Installing the CRPC Page 19 Installing and Page 20 Interface and Clock
Page 15 Frame to 25 Routing Cables Interface

Page 16 Installing the DCM Page 26 Installing and Page 21 Connecting Network
Frame to 24 Cables
to 27 Routing Fibers

Setting the Jumpers


Page 17 Installing the Subrack Page 25 Incorrect Connections
on the CRPC of Network Cables
Page 28 Cover and Subrack
Doors
Setting the Jumpers
Page 18 Installing and Routing
on the ROP Page 25 Cables to the
Setting Up
Page 28 CRPC/ROP
Optical Paths

Installing and Routing


Page 26 Fibers Between Page Checking the
Subracks 29 to 30 Installation

Installing and Routing


Page 27 Fibers to a DCM Page Engineering
Frame 31 to 32 Labels

End
Precautions

• This document provides guidelines for quick hardware installation.


• This document does not describe pre-delivery assembly.
• This document only describes procedures for onsite installation.

Electrostatic Discharge
Wear ESD gloves or an ESD wrist strap prior to contact with the equipment or before handling the
device, boards, or IC chips to prevent damage to sensitive components due to electrostatic discharge
from the human body. Ensure that the other end of the ESD wrist strap is properly grounded.

Bundling Cables
• Binding intervals between cable ties or optical fiber binding straps inside the cabinet cannot exceed
250 mm(9.84in.). (Binding intervals cannot exceed 200 mm(7.87in.) for user cables).
• Binding intervals between cable ties for all cables and corrugated pipes outside the cabinet are
determined based on the distance between the two horizontal beams. If the cable trough does not
contain any beams, the binding intervals between cable ties cannot exceed 250 mm(9.84in.).
• Bonds within and between frames, subracks and other metallic structures are plated or planed and
coated with antioxidant. Bonds within and between frames, subracks and other metallic structures are
fastened through screws, rivets, jointing properly.

Pre-Installation Check
Check and ensure that the equipment room, power supply, ground cables and optical cables are ready
for installation. Start the installation according to the engineering design documents after confirming that
conditions are met.

1
Regulation and Precautions for Board Handling

Do not hold a board without hand protection. Wear an ESD wrist strip or ESD gloves before handling a board.

Wearing ESD gloves Wearing an ESD strip Holding aboard without hand protection

Hold the front panel of a board with both hands.

• Insert filler panels into idle slots on an NE to prevent foreign matters from getting into the NE, which may
result in faults on the NE.
• Boards are fragile and valuable. When handling or placing a board, exercise caution and put it into a
dedicated packing box.
• Coherent boards must be packed with original packaging materials during transportation. If the original
packaging materials are lost, contact Huawei.

2
Tools for Installation

Measuring tape Phillips screwdriver Flat-head screwdriver

Adjustable wrench Heat gun Segmented blade utility knife

COAX crimping tool Cable cutter Wire stripper

Coax stripper RJ45 crimping tool Diagonal pliers

Power cable crimping tool Network cable tester Multimeter

Claw hammer Wire wrapping gun Marker

3
Unpacking the Equipment

1 Inspecting the Shipment

There is a ShockWatch® indicator on the crate. Notify


Huawei immediately if the indicator is red as this usually
indicates that the crate was not handled with proper care.
Shock watch
indicator

The indicator The indicator


is white turns to red

Properly handled Roughly handling

4
2 Unpacking the Subrack

a Straighten the Tongues

Use a screwdriver, a spanner, or a hammer to straighten the tongues.

Spanner
Flathead Claw
screwdriver hammer

b Remove the Cover and the Wooden Boards of the Crate

Remove the cover after straightening all the tongue. Then, straighten all the tongues that join the wooden boards
around the wooden crate and then remove the wooden boards.

Avoid improper unpacking to prevent damaging the product.

Properly dispose of all packing materials after the installation is completed.

5
3 Unpacking Boards

Pressure-sensitive Foam plate Label on the


adhesive tape board box

Strap Carton label

• Each board is packed in shielding bag and then placed in a cushion foam box. Save the
bags as they can be used later for storing the boards or packing the damaged boards to
be returned for repair.
• The ambient temperature and humidity may impact on boards. Do not throw away the
small bag of drying agent in each shielding bag.
• Wait at least 30 minutes prior to unpacking a board if it was recently moved from a cold
and dry place to a warm and damp place to help prevent moisture from forming on the
board surface and avoid damaging the components. Board box
• Check the completeness of the items in each package against the packing list prior to
installing the equipment. If any items are missing then immediately contact your local
Huawei office.
• Properly dispose of all packing materials after the installation is completed.

Cushion foam

Board
Shielding bag
Board box

• Be careful not to cut too deep into the carton to avoid scratching the devices.
• Electronic circuits and components are extremely sensitive to electrostatic discharges (ESD).
• Wear a grounded ESD wrist strap or ESD gloves and hold only the edge of boards during unpacking.

4 Requirements of Inspection

The received goods must be inspected against the Packing List item by item.

6
Appearance of the Subrack

1 With Subrack Doors 2 Without Subrack Doors

Mounting Board
ear area

Fiber
spool
Fan tray
Subrack
door Air filter

Technical Specifications of the Subrack

• Dimensions:498 mm (W) x 295 mm (D) x 450 mm (H) (19.6 in. (W) x11.6 in. (D) x 17.7 in. (H))
• Weight (empty subrack): 18 kg (39.6 lb.)
• Maximum subrack power consumption: 2400 W
• Rated working current: 50 A
• Nominal working voltage: -48 V DC

• An empty subrack means that there have not been any boards, fan tray assemblies, or air filters
installed.
• The maximum subrack power consumption refers to the maximum power consumption
configuration that the subrack supports and the maximum heat dissipation capability that the
subrack has. In practical applications, the maximum subrack power consumption is much higher
than the power consumption of the subrack in typical configurations.
• Cables are not supplied with the OptiX OSN 8800 T16. Information about power consumption is
provided while cable specifications are not provided.

7
Installing the Subrack

1 Subrack(s) in a 23-Inch Standard Open Rack

Rack

Heat Baffle A space of 1U high is required


under the bottom of the
subrack to allow ample air inlet.
13U
8800 T16

A DCM frame can be installed


in a proper position different
from the position marked in the
Heat Baffle diagram.

44U

8800 T16 41 U

Heat Baffle
Line up with hole A

8800 T16

Space for air


intake 1U
DCM Frame 1U

Rack with unevenly spaced screw Rack with evenly spaced screw
holes in the columns holes in the columns

1
Hole C Hole A
2 1inch
Hole B 1U Hole A
2
Hole A Hole A #12-24*1/2
1 Philips screw
Hole C #12-24*1/2 Hole A
Philips screw
2
Hole B 1U Hole A

2 Spaces numbered "1" are


Hole A Hole A shorter than spaces
numbered “2" as shown
1 in the figure left.

23-inch standard open racks can be classified into the above two types based on the distance
between the screw holes on the columns of the rack.

8
2 Installing Removable Handles

Lift the OptiX OSN 8800 T16 subrack to a place close


to the rack by using handles.

1 2

Rotate the handle anticlockwise by 30 Rotate the handle clockwise by 30


degrees, align the handle with the mounting degrees, and insert it in the
holes on the subrack, and then move the mounting holes.
handle to the OptiX OSN 8800 T16 subrack.

3 4

Apply force upwards to lock the handle. Hold the handle and lift the subrack.

9
3 Installing the Subrack

Remove subrack doors and the fan tray Secure the subrack onto the column of the open rack
assembly at the bottom of the subrack. with the positioning screws.

a b
a Rack with evenly
spaced screw
holes in the
columns

b Rack with
unevenly spaced
screw holes in the
columns

M6

Screw the bolt tightly and insert the


fan tray assembly back into the device. 3 ± 0.3 N. m
(26.5 ± 2.6 lbs.in.)

10
Installing Boards

1 Installing Boards

• Always wear an ESD strap whenever coming into contact with a unit or a metal component of the equipment. Ensure that the ESD
strap is properly grounded.
• Never force a board into place.
• Make sure that the board has been properly installed before locking the ejector lever.
• Ensure that the boards have been installed in compliance with the engineering design specific to the on-site scenario.
• Inspect the desired subrack slot and ensure it is free from any defects or foreign metal or objects.

• Reseating a board while the equipment is running will impact the normal operation of the equipment or even service interruption.
• Remove all optical fibers connected to a board before removing the board.

a
b

Slide the board along Push the ejector lever


the guide rails. inwards and tighten the
bolts.

a Slide the board along Push the ejector lever inwards


the guide rails. and tighten the bolts.

M3

0.4 ± 0.02 N. m
(3.5 ± 0.18 lbs.in.)

b Press the tact switch on the Slide the board along the Push the ejector levers inwards
ejector lever of a board and pull guide rail. and tighten the bolts.
the ejector levers outwards.

When removing an EFI board, pull the ejector levers outwards and pull outwards the board a little. Then, push the ejector
levers inwards and remove the board.

11
1 Installing Boards

Hold the handle to push the XCH adaptive frame into the slot along the
guide rail.

Tighten the bolts. Slide the board along Push the ejector
the guide rails. lever inwards and
tighten the bolts.

1 2 3 4

Hold the spring Remove the filler Insert the board. Push the ejector levers
plates on the ejector panel. inwards.
levers outwards.

2 Checking the DIP Switches on the EFI

Before the board is used, make sure that the setting of the SW1 is the same as that shown in the
figure.

U8
SERIAL
T1

NM_ETH2
SW1

SW2

12
3 Checking the Battery Jumper on the TN16XCH

Ensure that the setting of the battery jumper is the same as that shown in the figure prior to using
a TN16XCH board. When a battery is required, place a jumper cap over pin 3 and pin 2. When a
battery is not required, place a jumper cap over pin 2 and pin 1.

Battery Battery Jumper


Jumper
Battery is 2
2
2 used
3 1 3 1
J1 J1

2
CF Battery is
Card not used 3 1
J1

4 Checking the Battery Jumper on the SCC

Ensure that the setting of the battery jumper is the same as that shown in the figure prior to using a SCC
board. When a battery is required, place a jumper cap over pin 3 and pin 2. When a battery is not required,
place a jumper cap over pin 2 and pin 1.

Battery Battery Jumper


Jumper
Battery is 2
2
2 used
3 1 3 1
J1 J1

2
CF Battery is
Card not used 3 1
J1

13
Check Pluggable Optical Module Information

Refer to the "Pluggable Optical Modules" for detailed part numbers and specifications.

Laser information
Part number

Laser speed Laser type Multimode or


Wavelength or singlemode
Pluggable optical module
frequency

Procedures for removing and inserting an pluggable optical module module are described as follows.

Port

1
Pluggable
Latch optical module

Removing an pluggable optical module Inserting an pluggable optical module


1. Remove fiber connectors before removing pluggable optical module. 1. Insert an eSFP/XFP module into an optical port.
2. Pull the safety latch to release the pluggable optical module from
the optical port.
3. Cover the optical port with a cap.

14
Installing Components
1 Installing the Heat Baffle

M6

Heat baffle

3 ± 0.3 N. m
(26.5 ± 2.6 lbs.in.)

Phillips screwdriver
#12-24*1/2
Phillips screws

Air deflector

Air o utlet

Board area

Ground post Optical fiber


laying area
Fan tray assembly
• The heat baffle should be tightly installed directly above the subrack.
• The ground connection point of the heat baffle should be connected to the
Airinlet
open rack.

2 Installing the CRPC Frame

The mounting ears for installing a CRPC frame in a 23-inch open rack are different from those for installing
a CRPC frame in a 19-inch open rack .

Panel
Mounting
screws
ear

CRPC
board CRPC
frame

The CRPC frame is installed in the location ordinarily intended for the first subrack.

15
3 Installing the DCM Frame

DCM DCM
frame
Open
rack
Tray

Pull out a tray. Place a DCM on the tray.

Back of the tray

Secure the DCM by fastening bolts on the back of Slide the tray into the DCM frame.
the tray.

Ground post

Repeat steps 1 to 4 to install another DCM.

Holes for the mounting ears

• The DCM Modules face the left side


3 of the rack. If only one DCM is to be
installed in the open rack, it is fixed
on the left of the DCM frame. This is
Holes for to facilitate the distribution of optical
installation in a 2
fibers on the left.
rack • The space of 4 U can house only
1 three DCM frames.
• The DCM frame can only be installed
in a 23-inch open rack.

Technical specifications of the DCM frame


Item Specification

Dimensions 50.0 mm (H) x 536.0 mm (W) x 375.0 mm (D)


2.0 in. (H) x 21.1 in. (W) x 14.8 in. (D)

Weight 1.5 kg (3.3 lb)

H = Height, W = Width, D = Depth

16
4 Setting the Jumpers on the CRPC

CRPC

J4 J3

10

2
9
CPU

J4 J3

10
9
2

1
There are two groups of jumpers on the CRPC boards. The two groups are identified as J3 and J4.

Jumpers 9 to 10 in J3 and 1 to 6 in J4 are used for internal identification on the board.


To ensure the normal operation of the board, follow the requirements below to set the jumpers.
•Do not connect jumpers 1 to 2 in J3.
•Do not connect jumpers 3 to 4 in J3.
•Do not connect jumpers 5 to 6 in J3.
•Do not connect jumpers 7 to 8 in J3.
•Connect jumpers 9 to 10 in J3.
•Connect jumpers 1 to 2 in J4.
•Connect jumpers 3 to 4 in J4.
•Connect jumpers 5 to 6 in J4.

Jumpers 7-8 and 9-10 in J4 are used to set the slot of the CRPC board. The following are jumper
setting regulations:
•When jumpers 7-8 and 9-10 in J4 are not connected, the board slot is IU120.
•When jumpers 7-8 in J4 are connected and jumpers 9-10 are not connected, the board slot is IU121.
•When jumpers 7-8 in J4 are not connected and jumpers 9-10 are connected, the board slot is IU122.
•When jumpers 7-8 and 9-10 in J4 are connected, the board slot is IU123.

17
5 Setting the Jumpers on the ROP

ROP

J4 J3

10

2
9
CPU

J4 J3

10
9
2

1
There are two groups of jumpers on the ROP boards. The two groups are identified as J3 and J4.

Jumpers 9 to 10 in group J3 and jumpers 1 to 6 in group J4 are used for internal identification on the board. To
ensure normal board operations, follow the instructions below to set the jumpers.
•Never cap jumpers 1 to 2 in group J3.
•Never cap jumpers 3 to 4 in group J3.
•Never cap jumpers 5 to 6 in group J3.
•Never cap jumpers 7 to 8 in group J3.
•Always cap jumpers 9 to 10 in group J3.
•Always cap jumpers 1 to 2 in group J4.
•Always cap jumpers 3 to 4 in group J4.
•Never cap jumpers 5 to 6 in group J4.

Jumpers 7-8 and 9-10 in group J4 are used to set the logical slot for the ROP board.
When setting jumpers 7-8 and 9-10 in group J4, follow the instructions below:
•When jumpers 7-8 and 9-10 in group J4 are not capped, the logical slot for the ROP board is IU124.
•When jumpers 7-8 in group J4 are capped and jumpers 9-10 are not capped, the logical slot for the ROP board
is IU125.
•When jumpers 7-8 in group J4 are not capped and jumpers 9-10 are capped, the logical slot for the ROP board
is IU126.
•When jumpers 7-8 and 9-10 in J4 are capped, the logical slot for the ROP board is IU127.

18
Installing and Routing Cables
1 Installing and Routing Ground Cables

• Ensure that the ground points are clean and no paint or insulated object is at the ground points.
• Two-hole OT ground lugs with 0.75 inch hole spacing are recommended.
• Use the crimping tool recommended by the lug provider.
• The subrack is grounded through the ground connection point.
• Use two-hole OT ground lugs, to make grounding connection.
• The ground lugs is tin plated.
• The ground lugs is used with spring washers or flat washers, and is fastened through screws.
• Two-hole OT ground lugs with 0.75 inch hole spacing are recommended. Use the crimping tool recommended
by the lug provider.
Phillips screwdriver

M6

0.75 inch
0.25 inch
0.75 3 ± 0.3 N. m
inch (26.5 ± 2.6 lbs.in.)

M6 screw

2 Power Access Module of the Subrack


0.75 inch
0.25 inch

Mutual backup DC input


IU19 IU20 IU21 IU23 IU24
IU22
EFI PIU AUX PIU ATE

IU9 IU10
IU IU IU IU IU IU IU IU IU IU IU IU IU IU IU IU
1 2 3 4 5 6 7 8 11 12 13 14 15 16 17 18

Panel of
a power
access
module

IU25 FAN

OptiX OSN 8800 T16 is configured with a pair of power supplies of


mutual backup. The normal operation of the equipment is not affected
in the case of failure of any external input -48 V/-60V power supply.

19
3 Installing and Routing Power Cables

1 2
ply waxed
polyester twines

Diagonal Pliers

Phillips screwdriver

Connect the OT two-hole connector of the power


ground cable first, and then connect the OT two-hole
connector of the -48 V power cable.
Do not install or remove power cables while the
equipment is powered on. Ensure that the power is
switched off prior to removing or installing a power
cable to avoid bodily injuries.
Torque M6 screws to 5 ± 0.5 N m(44 ± 4 lbsin.).
Torque M3 screws to 0.5 N m(4 lbsin.).

4 Housekeeping Alarm Interface and Clock Interface

Alarm interface
Wire wrapping
gun Pin assignment

A B C D E F G H
1 CR - V ENV - 1 ENV - 9
BITSIN - 1
2 MJ - V ENV - 2 ENV - 10

3 MN - V ENV - 3 ENV - 11 BITSIN - 2

4 CR - A ENV - 4 ENV - 12
BITSOUT - 1

5 MJ - A ENV - 5 ENV - 13

6 MN - A ENV - 6 ENV - 14 BITSOUT - 2

7 CONT - 7 ENV - 7 ENV - 15


RESERVE
8 CONT - 8 ENV - 8 ENV - 16

20
5 Connecting Network Cables

The network ports on the EFI board are auto-sensing ports. They support crossover and
straight through cables.

ETH1

EFI

LAMP1
ETH1
SERIAL

LAMP2
ETH2

ETH2
NM_ETH2

NM_ETH1
ETH3

NM_ETH2 NM_ETH1

ETH3

Network cable with RJ-45 connector

White and orange White and green


White and orange
1 Orange
1 1 1
2 White and green
2 2 2
3 3 3 3
4 4 4 4
5 Green
5 5 5
6 6 6 6
7 7 7 7
Green
8 8 8
Orange
8
Straight through cable Crossover network cable

21
5 Connecting Network Cables

Scenarios with only one NE in master/slave mode

EFI EFI

LAMP1 LAMP2 NM_ETH1

LAMP1 LAMP2 NM_ETH1


ETH1

ETH1
SERIAL

SERIAL
Slave subrack 4 Slave subrack 5
ETH2

ETH2
NM_ETH2

NM_ETH2
ETH3

ETH3
EFI EFI
LAMP1 LAMP2 NM_ETH1

LAMP1 LAMP2 NM_ETH1


ETH1

ETH1
SERIAL

SERIAL
Slave subrack 2 Slave subrack 6
ETH2

ETH2
NM_ETH2

NM_ETH2
ETH3

ETH3
EFI EFI
LAMP1 LAMP2 NM_ETH1

LAMP1 LAMP2 NM_ETH1


ETH1

ETH1
SERIAL

SERIAL Slave subrack 3


Master subrack 1
ETH2

ETH2
NM_ETH2

NM_ETH2
ETH3

ETH3

1
ETH1
To NM computer Master subrack (1)
ETH2 ETH3
2 3
ETH1 ETH1
Slave subrack(2) Slave subrack(3)
ETH2 ETH3 ETH2 ETH3

Ensure that network 4 5 6 7


cables are connected
correctly between ETH1 ETH1 ETH1 ETH1
Slave subrack(4) Slave subrack(5) Slave subrack(6) Slave subrack(7)
subracks as shown in the
ETH2 ETH3 ETH2 ETH3 ETH2 ETH3 ETH2 ETH3
figure to the right prior to
powering on the 8
equipment.
ETH1
Slave subrack(8)
ETH2 ETH3

Use a crossover cable or a straight-through cable to directly connect a subrack to the NM computer or
to directly connect two subracks.

ETH1 at the master subrack cannot be connected to other subracks. Otherwise, the master subrack becomes a
slave subrack and its configurations are cleared. Then, services on the subrack are interrupted and cannot be
restored.

The LAMP interfaces cannot connect to an RJ45 cable intended for the NM_ETH or ETH interface;
otherwise, the EFI board, the connected test instrument, or the equipment housing the EFI board will be
damaged.

22
5 Connecting Network Cables

Scenarios with multiple NEs in master/slave mode

EFI LAMP1 LAMP2 NM_ETH1 EFI

LAMP1 LAMP2 NM_ETH1


ETH1

ETH1
SERIAL

SERIAL
ETH2

ETH2
Slave subrack 3 Slave subrack 3 '
NM_ETH2

NM_ETH2
ETH3

ETH3
EFI EFI
LAMP1 LAMP2 NM_ETH1

LAMP1 LAMP2 NM_ETH1


ETH1

ETH1
SERIAL

SERIAL
Slave subrack 2 Slave subrack 2 '
ETH2

ETH2
NM_ETH2

NM_ETH2
ETH3

ETH3
EFI EFI
LAMP1 LAMP2 NM_ETH1

LAMP1 LAMP2 NM_ETH1


ETH1

ETH1
SERIAL

SERIAL

Master subrack 1
ETH2

ETH2

Master subrack 1 '


NM_ETH2

NM_ETH2
ETH3

ETH3

1' 1 To NM computer
NM_ETH1 NM_ETH2
Master subrack (1') Master subrack (1)
ETH2 ETH3 ETH2 ETH3

2' 3' 2 3
ETH1 ETH1 ETH1 ETH1
Slave subrack(2') Slave subrack(3') Slave subrack(2) Slave subrack(3)
ETH2 ETH3 ETH2 ETH3 ETH2 ETH3 ETH2 ETH3

4 5 6 7
ETH1 ETH1 ETH1 ETH1
Slave subrack (4) Slave subrack (5) Slave subrack (6) Slave subrack (7)
ETH2 ETH3 ETH2 ETH3 ETH2 ETH3 ETH2 ETH3

ETH1 at the master subrack cannot be connected to other subracks. Otherwise, the master subrack becomes a
slave subrack and its configurations are cleared. Then, services on the subrack are interrupted and cannot be
restored.

Use a crossover cable or a straight-through cable to directly connect a subrack to the NM computer or
to directly connect two subracks.

The LAMP interfaces cannot connect to an RJ45 cable intended for the NM_ETH or ETH interface;
otherwise, the EFI board, the connected test instrument, or the equipment housing the EFI board will
be damaged.

23
5 Connecting Network Cables

Scenarios with NEs in non master/slave mode

EFI EFI
LAMP1 LAMP2 NM_ETH1

LAMP1 LAMP2 NM_ETH1


ETH1

ETH1
SERIAL

SERIAL
subrack 3 subrack 6
ETH2

ETH2
NM_ETH2

NM_ETH2
ETH3

ETH3
EFI EFI
LAMP1 LAMP2 NM_ETH1

LAMP1 LAMP2 NM_ETH1


ETH1

ETH1
SERIAL

SERIAL
subrack 2 subrack 5
ETH2

ETH2
NM_ETH2

NM_ETH2
ETH3

EFI EFI ETH3


LAMP1 LAMP2 NM_ETH1

LAMP1 LAMP2 NM_ETH1


ETH1

ETH1
SERIAL

SERIAL
ETH2

subrack 1
ETH2

subrack 4
NM_ETH2

NM_ETH2
ETH3

ETH3

To NM computer

Use a crossover cable or a straight-through cable to directly connect a subrack to the NM


computer or to directly connect two subracks.
The Ethernet cable is threaded out through the square hole on the mounting ear attached to the
subrack.

The LAMP interfaces cannot connect to an RJ45 cable intended for the NM_ETH or ETH
interface; otherwise, the EFI board, the connected test instrument, or the equipment housing
the EFI board will be damaged.

24
6 Incorrect Connections of Network Cables

Master subrack 1
EFI EFI
EFI EFI EFI
EFI
LAMP1 LAMP2 NM_ETH1

LAMP1 LAMP2 NM_ETH1


ETH1 ETH2

ETH1 ETH2
SERIAL

SERIAL

LAMP1 LAMP2 NM_ETH1


ETH1 ETH2
SERIAL
NM_ETH2

NM_ETH2

NM_ETH2
ETH3

ETH3

ETH3
EFI EFI EFI
EFI EFI EFI
EFI EFI

LAMP1 LAMP2NM_ETH1

LAMP1 LAMP2NM_ETH1

LAMP1 LAMP2NM_ETH1
ETH1 ETH2

ETH1 ETH2

ETH1 ETH2
SERIAL

SERIAL

SERIAL
EFI EFI
LAMP1 LAMP2 NM_ETH1

LAMP1 LAMP2 NM_ETH1


ETH1 ETH2

ETH1 ETH2
SERIAL

SERIAL

NM_ETH2

NM_ETH2

NM_ETH2
ETH3

ETH3

ETH3
NM_ETH2

NM_ETH2
ETH3

ETH3

Slave subrack 2 Slave subrack 3 Slave subrack 4

The above figures give examples of incorrectly connected cables. Ensure that cables are properly
connected to avoid serious damage to equipment and severe bodily injuries.

7 Installing and Routing Cables to the CRPC/ROP

Plug one end of the crossover network cable


into the LAN interface on the CRPC/ROP
board. Plug the other end into the ETH1 or
ETH2 interface on the EFI board in the
corresponding OptiX OSN 8800 T16 subrack.

EFI
LAMP1
ETH1

ETH_1
Communication
cable between
LAMP2
ETH2

the CRPC/ROP ETH_2


board and
subrack
NM_ETH1
ETH3

MON SYS LINE

Working power input


RS232-1 RS232-2
LAN Protection power input

25
Installing and Routing Fibers Between Subracks

NOTE
When fibers splice through the E2000-E2000 connector on the ODF, purchase an E2000 ODF box for fiber routing and
installation. For details, see the E2000-ODF BOX Installation Guide.

1 Installing and Routing Fibers Between Subracks

Avoid direct eye exposure to lasers when checking fiber attenuation. Do not wind external fibers around fiber spools.

Choose a coiling fiber spool according to the length of redundant fibers. Wind the fibers around the big spool first and
then the smaller spool. The fibers should not be coiled too tightly or too loosely. Ensure that the bending radius of
fibers is not less than 30 mm (1.18 in.).
After fiber installation, insert fiber connectors in idle interfaces and cover idle fibers with fiber caps.

Routing fibers of the OptiX OSN 8800 T16 subrack

Fiber holder Fiber

When connecting fibers between boards on the left and right sides of a
subrack, route the fibers under the protective plate below the XCH. When
the slot for the XCH is inserted with an adaptive frame to house an
optical-layer board, route fibers to the board above the protective plate.

Cable-routing area for internal fibers

Installing and routing fibers of the OptiX OSN 8800 T16 subrack

b a
ee
dd
b
a
c
f b
c a

26
2 Installing and Routing Fibers to a DCM Frame

Choose a coiling fiber spool according to the length of redundant fibers. Wind the fibers
around the big spool first and then the smaller spool. The fibers should not be coiled too tightly
or too loosely. Ensure that the bending radius of fibers is not less than 30 mm (1.18 in. ) .
After routing the fibers to a DCM, restore the plastic cover and door of the subrack to their
original positions.

Fiber routing on the DCM frame

The left module’s The left module’s


fiber route fiber route
The right module’s fiber route The right module’s fiber route

Fiber

Fiber holder

Cable ties

27
Installing the the Front Doors

Setting Up Optical Paths


Station A Station B

ODF ODF
West FIU FIU East

a b c d
Fiber jumper

Optical power meter

a Measure the optical power at the OUT port on the FIU c Measure the input optical power of the ODF at the
board at the transmit end and record the reading as a. receive end and record the reading as c.

b Measure the output optical power of the ODF at the


transmit end and record the reading as b.
d Measure the input optical power at the IN port on the FIU
board at the receive end and record the reading as d.

Subtract reading b from reading a to determine the fiber insertion loss on the line side of the upstream station. This
insertion loss must be lower than 1 dB. The fiber connectors on span 1 require cleaning if the insertion loss is greater
than 1 dB. The fibers on span 1 need to be replaced if the insertion loss remains greater than 1 dB after the fiber
connectors are cleaned.
Subtract reading d from reading c to determine the fiber insertion loss on the line side of the downstream station. This
insertion loss must be lower than 1 dB. The fiber connectors on span 2 require cleaning if the insertion loss is greater
than 1 dB. The fibers on span 2 need to be replaced if the insertion loss remains greater than 1 dB after the fiber
connectors are cleaned.
After ensuring that the optical paths on spans 1 and 2 are functioning properly, calculate the actual line attenuation
between the two stations according to the Line attenuation = a - d + 2 formula. (In the formula, 2 indicates 2 dB, the
insertion loss of each FIU board.) The line attenuation must be equal to or lower than the line attenuation specified in the
design documents. In the event that the line attenuation does not fall within the specified range, inform the customer to
rectify or replace the fibers on span 3.

After all issues are resolved, restore all fibers and cable connections, and set up all optical paths from west to east.

Repeat the preceding operations to set up all the optical paths from east to west and ensure that the optical paths
between the existing stations are functioning properly.

28
Checking the Installation

1 Installation Checklist

Double check that these items have been properly performed.


Tasks Items Results

Installing
subrack The subrack is installed in the correct location, with all the screws fastened.

All the boards have been installed in compliance with the engineering design.

All the boards should be completely inserted into the slot. And the front panels are
well locked.
Installing Inspect the desired chassis slot and ensure it is free from any defects or foreign
boards metal or objects.

The front panel is installed to cover the empty slot.

The unused optical interfaces on the unit must be covered with the fiber caps.

Routing of all the cables comply with the engineering design.

The labels of the cables and fibers are properly pasted. The labels are attached
neatly at two ends of the cables, facing the same direction. The contents on them
are correct and clear.
The trough is needed for cabling outside the rack. Do not make the cables overflow
the trough.

The radius of the routed cables must be equal to or more than 30 mm (1.18 in. ) .

The -48V DC cable , return cable and ground cable are connected correctly and
firmly.
When the -48V DC cable , return cable and ground cable is connected to a lug on
site, solder or firm it.

The -48V DC cable , return cable and ground cable are bent smoothly.
Installing
and routing The external -48V DC cable, return cable and ground cable are arranged
cables separately from signal cables.

Properly ground all racks and subracks that involve metal shells.

Bend the cables in a radius that is 3 to 5 times larger than the cable diameter. The
cables cannot be bound where they are bent.
Use protection tubes or insulating adhesive plasters to wrap power cables, naked
cables and lug stems. There should be no bare copper wires in lugs or terminals.
Spring washers and flat washers should be installed properly.

The fibers should not be compressed by other cables after fiber routing.

The connection between the fiber jumper and the optical interface unit or the fiber
adapter is firm.
Fiber jumpers routed from the equipment to the ODF must be covered with a
protective pipe or trough.
The fiber jumpers are secured smoothly and interconnected reliably in the ODF.
The redundant fiber jumpers are coiled tidily.

29
Checking the Installation

2 Checking the Equipment Prior to Powering On

• Check whether a fixed optical attenuator was added before powering on the subrack. Refer to
configuration rules for attenuators prior to proceeding.
• Turn off all power switches on the power distribution box after the test.
• When the supply voltage is not the required, do not connect the power.

Turn off the switch to the power supply, and then use an ohmmeter to measure the resistance between -
48V DC, RTN and GND.

Switch Between -48V DC Between -48V DC Between RTN and


and RTN and GND GND

Turn all the power switches on the ∞ ∞ ∞


power distribution box to OFF

Turn all the power switches on the <20k Ohms ∞ ∞


power distribution box to ON

Check the fuse capacity of the power supply device.

Maximum Power Consumption Fuse Capacity

2400 W 60 A

Test the voltage between -48V DC and RTN on the DC


power box.

The voltage range Power supply is -48V

-40V to -57.6V

30
Engineering Labels

1 Attaching Labels

a Attaching a Label to a Power Cable

Attach a label to a cable 2 cm away from connectors. Attach the identification


Identification plate on the right side of
plate the cable when the cable
To: is routed vertically.
B03 — -48V2

B03 — -48V2
To:
Cable

Attach the identification plate on top of Identification


the cable when the cable is routed plate
horizontally.

b Attaching a Label to a Signal Cable

Fiber Fiber Fiber

Fold to the right

To:
A03-33-33-33-33
Label

Fold upwards

If a cable is routed vertically, the label needs to face to the right. If a cable is routed horizontally, the label
needs to face downwards.

31
2 Standard Engineering Labels

Name Content Example Remarks

TO : TO : MN (BC): BC is written right


A01 -48V2 B03 -48V2 under MN. On the loaded open
B08 rack side: MN identifies the row
and column number of the power
distribution facilities such as the
MN(BC) - -48V1 control open rack and power
Labels for MN(BC) - -48V2 distribution box. BC identifies the
power cables MN(BC) - RTN A label on the A label on the row and column number of the –
loaded open rack power distribution 48 V connecter. RTN and GND
MN(BC) - GND side, which cabinet side, which
are not assigned rows or columns
contains contains
information about information about for identification.
the position of the the position of the On the power distribution cabinet
cable on the cable on the side: Only MN is required to
power distribution loaded open rack indicate the open rack number.
cabinet. side.

MN identifies the row and column


Labels for number of an open rack.
external cables Rows are numbered from A to Z
MN
to an alarm from front to back. Columns are
box numbered from 01 to 99 from left
to right.

MN identifies the row and column


number of an open rack.
A01 02 01 A is a two-digit number that
indicates the position of a subrack
Labels for 05 A02 in an open rack. Subracks are
Ethernet MN-A-B TO:
numbered from bottom to up.
cables
B is a two-digit number that
indicates the Ethernet port.
Ethernet ports are numbered top
down and from left to right.

MN identifies the row and column


number of an open rack.
A is a two-digit number that
Labels for the A01 01 04 LOG OUT indicates the position of a subrack
fiber used to
MN-A-B-C-D in an open rack. Subracks are
connect two 02 M40 01 A02 B numbered from bottom to up.
equipment
B identifies the slot number.
C identifies the board name.
D identifies the optical port name.

MN identifies the row and column


number of an open rack.
A is a two-digit number that
indicates the position of a subrack
MN-A-B-C-D in an open rack. Subracks are
numbered from bottom to up.
B identifies the slot number.
Labels for the A 04 L4G
A01 01 LOG IN
fiber that C identifies the board name.
connects the ODF B02 02 03 04 D identifies the optical port name.
equipment to MN identifies the row and column
the ODF number of an ODF.
A identifies the number of the
ODF frame.
ODF-MN-A-B-C
B identifies the row number of a
terminal.
C identifies the column number of
a terminal.

32
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
Shenzhen 518129
People’s Republic of China
www.huawei.com